首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 0 毫秒
1.
Increasingly, stations are being extended to tunnels due to the effects of topography on mountain rail-ways and the requirements of the stations. A forked tail tunnel arrangement is the most popular one, but the concomi-tant effect of the following tunnel on the antecedent tunnel during construction of a tunnel with small spacing causes cracking of the primary support and secondary lining as well as heaving of the invert, which continues to trouble en-gineers. Different problems are encountered by different tunnels because of the complexities and variations of geo-logical environments. Using the construction of two single-line sections with small spacing for the Xinchengzi tunnel on the Lanzhou-Chongqing railway as an example, the support form for a soft rock tunnel with small spacing and high geostress and deformation, as well as the invert construction sequence of the left and right lines and secondary lining, are analyzed and discussed. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

2.
Combining the present situation and development trend of different tunnel support technologies at home and abroad, this paper analyzes the problems of rockburst in hard rock tunnels and large deformation in soft rock tunnels caused by high ground stress. It is concluded that: 1) regarding the rockburst problem, the current support technology is mainly influenced by the rock burst mechanism which is dominated by static factors, and so the used support components are generally of smaller deformation performance and "passive support" properties; 2) as the rockburst is the result of dynamic-static stress coupling, and only the anchor bolt has the "active support" attribute in the current "shotcrete+anchor bolt+wire net" support system, so the best support system should have the two functions of active support and energy release in terms of the rockburst problem, and the key focus of the research and development is anchorage members; 3) there are three main support types for large deformation in soft rock tunnels, e.g. the heavy support, layered support and yielding support. Among them, the heavy support system in underground cavern with large deformation is easy to induce excessive surrounding rock pressure, and so the applicable conditions are limited. The layered support system is still not the best choice due to its immature theoretical study, difficult determination of the thickness value and the installation time of each support layer and the interference to construction progress. With the characteristics of timely support and yielding while supporting, the yielding support system can give full play to the performance values of surrounding rocks and supporting materials, and make both of them reach the optimal state, so it is the best choice for supporting the soft rock tunnels with large deformations. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

3.
In order to explore the control method of the intake air state in utility tunnels when the outside fresh air humidity is too high, taking the ventilation works of a utility tunnel section in Pingtan comprehensive experimental area as the research background, this paper proposes the control method of intake air state parameters for ventilation and dehumidification in utility tunnels under normal and accident conditions, by means of the effective ventilation and dehumidification duration prediction model, the evolutionary multi-objective algorithm (EMOA), and in combination with the ventilation control requirements. The results show that the intake air state parameter controller can be adjusted freely according to the different requirements of decision makers for ventilation fan working duration and dehumidifier working temperature and moisture content, and the optimized appropriate control objectives can be achieved, which is conducive to the real-time decision-making of the intake air state parameter control for ventilation and dehumidification in utility tunnels. © 2022, Editorial Office of Modern Tunnelling Technology. All right reserved.  相似文献   

4.
With the rapid development of China high speed railway, there is a dramatic increase of deep-buried and long mountain tunnels, and more and more tunnels are disturbed by high water pressure during construction and operation. Design for tunnel lining with high water pressure is one of the central concerns in the field of tunnel engi-neering, and the key problem is to forecast water pressure on the secondary lining and determination of water pressure resistance grade. The upper limit of water pressure on the secondary lining is studied by investigation and analysis in this paper. The study shows: (1) There should be an upper limit for the grade of water pressure resistance; (2) It is not very effective to improve the tunnel structure bearing capacity by only increasing the lining thickness haphazard-ly, and the appropriate maximum thickness of secondary lining is 1 m; (3) It is also unsatisfactory to improve the tunnel structure bearing capacity by simply increase concrete strength grade. The appropriate concrete grade is between C40 and C50. (4) In view of tunnel structure safety and good operation performance, the upper limit of water pressure resist grade should be no more than 1.2 MPa. When water pressure on the secondary exceeds the designed value,comprehensive measures should be taken to adjust the value to the appropriate range. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

5.
After 1975, the appearance of finite element numerical limit method and the application and development of computer technology have brought the elastic-plastic analytical calculation of engineering materials into a new era of numerical limit calculation. The new methods, namely, strength reduction method and load increment method, as well as the recently proposed ultimate strain method, are adopted in the rock tunnels studied in this paper. To solve the uncertainty of mechanical parameters of surrounding rock in rock tunnels and provide more scientific and reasonable mechanical parameters of surrounding rock, the surrounding rock classification must be made combining theory, investigation and experience. Taking the surrounding rock classification in rail transit tunnels as an example, the improvement of the classification level includes improving the strength index, mainly adopting the quantitative classification method, reasonably determining the basic index BQ value of rock mass quality, increasing the number of surrounding rock classifications, formulating the surrounding rock classification tables for the running tunnel and the station tunnel, and achieving the coordination and unification of qualitative and quantitative classification methods. Finally, the quantitative indexes of surrounding rock self-stability are determined, and the more scientific and reasonable physical and mechanical parameters of surrounding rocks are put forward through back calculation. © 2022, Editorial Office of Modern Tunnelling Technology. All right reserved.  相似文献   

6.
The newly-built tunnel passing closely under the existing station will inevitably lead to settlement of the existing station, and especially deformation joints are prone to differential settlement. Based on the Suzhoujie Station of Beijing Subway Line 16 passing closely under the existing Line 10, this paper analyzes the overall settlement of the existing station and the differential settlement at deformation joints through a combination of field measurement and numerical simulation. The study results show that installing jacks significantly prevents the settlement of the existing station, after installation of jacks the settlement of the existing station is reduced by about 58%, and the jacking force of the jack shall be controlled between 180-450 t; the impact of construction on the single-deck station structure side at deformation joints is greater than that on the double-deck station structure side, the stress on the socket is gradually increased with the excavation of the lower tunnel, and reduced after installation of jacks, indicating that the jack can effectively reduce the tensile stress of the existing station and maintain the safety of the existing station; with the action of the jacking force of jacks, the settlement curve of the existing station presents a stepwise change at the jack installation points, while the upper ground surface settlement is relatively uniform. © 2022, Editorial Office of Modern Tunnelling Technology. All right reserved.  相似文献   

7.
In the whole process of survey, construction and operation of rock tunnels, hydraulic fracturing is a mechanical mechanism that needs to be focused. In this paper, numerical simulation for fracture damage constitutive model and analytical formula were used to study the hydraulic fracturing of stratified sedimentary rocks. Based on multi-field coupling finite element analysis software, and combining the linear elastic fracture criterion with the damage constitutive model, a seepage-stress-rock damage coupling model is redeveloped, in which micro cracks can be characterized, and applied to study the hydraulic fracturing of rock mass in the saturated seepage process. By introducing dispersed parallel micro cracks for simulating the beddings of sedimentary rocks, the sedimentary rock cylinder model was established to simulate the hydraulic fracturing behaviors under injecting water into apertures and acting of confining pressure, in order to study the fracturing failure modes and seepage distribution patterns. In addition, the quantitative relationship between the critical water pressure for initial cracking and the confining pressure, the pore diameter of specimens was discussed by changing the pore diameter and confining pressure. In order to verify the cracking initiation pressure law obtained by numerical simulation, based on the seepage theory and the basic equation of elastic mechanics, and combined with the tensile failure mode obtained in the simulation, the formula of critical water pressure for cracking initiation in the rock cylinder with uniform linear elastic seepage was derived. The results of analytical solution and numerical calculation show that the cracking initiation pressure obtained by the two methods is in good agreement with the deviation within 3%. The larger the confining pressure, the larger the cracking initiation pressure, with the approximate linear relationship. The smaller the aperture, the larger the cracking initiation pressure, with the approximate negative slope linear relationship in a certain range. At the same time, the cracking initiation pressure by the analytical solution is always slightly greater than that of the numerical solution, which reflects the impact caused by the difference of the basic material hypothesis between the analytical method and the numerical method. When the material property parameters are consistent, the cracking initiation pressure based on the assumption of ideal linear elastomer will be greater than that of the material introduced into the initial damage bedding. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

8.
Su G.  Zan Y.  Sun W.  Cai W.  Hu Q.  Liu X. 《现代隧道技术》2018,(6):170-175
The vehicle-mounted GPR technique, a non-contact and long-distance detection method with air-cou- pled antennas, is a fast nondestructive detecting technique in the field of structural health safety assessment of tunnels and underground engineering, which has changed the traditional measurement method of hand-held GPR antenna closely attached to the tunnel lining. This paper describes the detecting conditions and working principles of this technique used in health assessment of metro tunnels, and evaluates the feasibility of vehicle-mounted GPR to de- tect the metro tunnel in the basis of analyzing the test results. The experimental results show that this technique could detect the metro tunnel at normal operating speed within the vehicle gauge, providing a new method for the maintenance and safety inspection of operating metro tunnels. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

9.
Deep-buried water-storage and drainage shield tunnels, which are different from road and subway shield tunnels in terms of computation theory, construction technology and operation maintenance, would bear high inner water pressure and large earth pressure. In view of the change of the bearing mode for the lining structure of water-storage and drainage shield tunnels, a full-ring test and numerical analysis are carried out to study the influence of inner water pressure, staggered joint assembly and bolt installation types on the behaviors of water-storage and drainage shield tunnels. The results show that the deformation of the straight-jointed water-storage and drainage shield tunnel varies greatly from the state of empty water to that of full water; and the vertical and horizontal convergence deformations of the tunnel with inner water pressure of 0.6 MPa are 2.2 times and 3.2 times of that without inner water pressure, respectively. The convergence deformation, and the maximum joint opening and bolt tension of stagger-jointed lining structure decrease by 15%-25% and 25%- 40%, respectively, compared with that of the straight-jointed water-storage and drainage shield tunnel. The bolts at the segmental joints will yield because of the increase of inner water pressure and the first occurrence of bolt yield phenomenon is located near the position on the lining structure which is under the action of maximum negative bending moment; because the failure of shield tunnel is always caused by the yield of joint bolts, this position is the weak point for the deep-buried water-storage and drainage shield tunnel. For the water-storage and drainage shield tunnel based on the connection with double rows of bolts, the bolts near the outer arc surface of segmental joints in the area of 90 degree in the vault and arch bottom can be removed; the bolts near the inner arc surface of the segmental joints within the 90 degree of the haunch must be installed, otherwise, the tensile force of the bolts at the segmental joint near the maximum negative bending moment will increase by 5%-14%. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

10.
Based on an introduction to the construction and application of the early warning control platform for the tunnel and subway engineering, an overall analysis of the related data during tunnel and subway construction was conducted in order to give a better reference for the site construction, to guarantee safe and rapid qualified construc⁃tion, and to improve management efficiency. Based on red line control, deformation thresholds of surrounding rock, allowances of construction material and advanced geological prediction, a dual early warning system with automatic trigging and manual prejudging was adopted to control the quality of tunnels and subways and to guarantee safe con⁃ struction; through the platform a centralized management is realized, all the construction information and effective data are transmitted instantaneously by internet, decreasing management cost and increasing work efficiency. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

11.
In recent years, large shield tunnels with internal double-decked lanes have been developing rapidly in the field of highway tunnels, and prefabricated elements are increasingly adopted in internal structure. Based on the columns-base joint in Zhuguanglu tunnel, which is under construction, 2 full-scale specimens are designed for the quasi-static test, one specimen is connected with grout sleeve splicing and the other is cast in place. The test results show that: the bearing capacity of specimen with grout sleeve splicing is equal to that of cast-in-situ specimen, but its ductility and energy dissipation capacity are worse than that of the cast-in-situ specimen. And for the specimen with grout sleeve splicing, there exists crack concentration on the area above the sleeve. The crack width is too larger in this area. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

12.
Zhang M.  Zhang Z.  Chen F. 《现代隧道技术》2018,(6):197-203and209
A variety of construction problems, such as bad cutting effects of cutters, unreasonable boring parame- ters and blowout, are often encountered during shield tunnelling under unfavorable geological conditions. Aimed at these construction difficulties of high pressure, abundant underground water, fractured rock stratum, long distance and small-radius curves of Fuzhou metro, the mechanical behaviors of cutting tools were analyzed through theoreti- cal calculations of cutter cutting force, then the reasonable cutter configuration, tunneling parameters and the proper time for cutter replacement were presented. Some measures, such as screw conveyor renovation, mucking control and lowering of groundwater, were adopted for controlling blowout based on practice. The stability of excavation face was analyzed by numerical simulation, and the measures for shield boring and posture control in the long distance and small radius curved tunnels were summarized. The conclusions are as follows: 1) when shield machine is driven in fractured stratum, the effect of lateral impact force produced by spalling rock on cutter will be very large and rein- forcement is needed for cutter; 2) cutter replacement should be taken at proper time based on muck samples in con- ditions of increasing of total shield thrust by 4 000-7 000 kN, cutter torque by 1 000-1 500 kN•m and driving speed smaller than 10 mm/min; 3) adopting screw conveyor device with innovative anti-blowout devices and control measures for ground precipitation and mucking, it controls blowout effectively; 4) the maximum axis offset and the height offset of segment meet the requirements of shield construction specifications during shield construction of long distance small-radius curved tunnel. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

13.
The application of prefabricated tunnel technology has been become a new research field both in China and abroad. Based on the running tunnel between Yufuhe station and Wangfuzhuang station of Jinan rail transit line R1, a new prefabricated tunnel construction technology, the PBA method is presented. This paper makes a detailed discussion on section form, supporting scheme and construction process of the PBA method. In this study, 3D a new 3D numerical model for PBA method is presented by finite difference numerical simulation software Flac and the construction processes are modeled. The rule of ground surface settlement, ground deformation and structural stress caused by PBA method is studied in detail. Results show that the structure of PBA method can effectively control the deformation magnitude and scope. Stress concentration appears at the prefabricated connection parts and the reinforcement needs to check. The total assembled structure forms the load-bearing system after the completion of the lateral wall. The built-in depth of the precast pile and pile bottom grouting quality should to be ensured to control the displacement of the precast piles. The results of this study will be a useful reference for similar projects in the future. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

14.
Studying the in-situ stress distribution at a tunnel site is very important to determine surrounding rock characteristics, the engineering design and the construction scheme. By using the multiple linear regression method based on the least square algorithm, the initial geostress field is analyzed and the corresponding regression coefficients are obtained. The ground stress obtained from the proposed back analysis is reasonable and can meet the demands of the engineering applications. From the rockburst risk level distribution diagram, it is speculated that the Wunvfeng tunnel is in the high filed stress area. Field monitoring should be strengthened and emergency plans should be made to cope with the rockburst risks during the construction process. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

15.
With the development of the tunnel technology in China, the shield tunnel will become an important way to build the Sea-crossing channel. Taking the current largest diameter Shantou Bay shield tunnel in China as the engineering background, this paper introduces the challenges faced by the construction of the shield launching shaft in the reclamation cofferdam: e.g. deep, irregular excavation, deep silt layer and great influence of the seawater. Based on the practical conditions, a top-down construction technique of large ring beam considering two working conditions of foundation pit excavation and shield launching is proposed. Based on three-dimensional finite element analysis and field measurement, the stress characteristics and soil deformation of foundation pit are studied. The results show that the top-down construction technique of large ring beam can effectively control the deformation of the foundation pit and save construction time. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

16.
The numerical simulation was carried out based on tensile test of the embedded components in segment joints of the deep buried storage and drainage shield-driven tunnel in Shanghai in order to study the numerical approach for mechanical analysis of segment joints of the tunnel. Using the concrete damage plasticity model and nonlinear springs, the 3D refined numerical model was established, in which the embedded components with complex geometries and the bond-slip behaviors between the concrete and bars were taken into consideration. Three kinds of embedded component models with different degrees of refinement were established and simply loaded. By comparing the calculation results and considering the spent time and the accuracy of calculation, the simplified form of the embedded components used in the overall model was determined. Nonlinear springs between anchor bars and concrete were set in the model in order to simulate the bond-slip behavior between them. In addition, two contrast models were also established using binding constraint and face-face contact constraint between concrete and anchor bars respectively. The three types of models were loaded in accordance with the test conditions. Comparing the results of the numerical calculation with the test results, it is shown that the "nonlinear spring model", which takes the bond-slip behavior into consideration, is more consistent with the test results than the "face to face contact model" and "binding model". And the model also reflects the failure mode very well. It indicates that the three dimensional refined modeling method used in this paper is applicable for similar tensile tests. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

17.
Based on a shield-driven running tunnel project of Hangzhou Metro Line 2, this paper carries out field measuring of the ground surface deformation caused by two different shield machines in double-tube tunnelling in soft soil areas, obtains the laws of the surface deformation caused by shield-driven double-tube tunnelling and verifies the applicability of the modified Peck formula to double-tube tunnelling. The results show that in soft soil areas the impacts on ground surface deformation caused by different shield construction parameters in the previously and subsequently excavated tunnels are different, while the surface deformation changes sharply before and after the shield machine passing through the cutting face, and a rebound phenomenon occurs when the shield tail passes through the cutting face due to the influence of the grouting; The cutterhead torque of the shield machine in soft soil areas can be composed of five calculation factors, and the calculation results are in good agreement with the measured values. The larger the opening rate of the shield cutterhead is, the larger the average torque value will be, the higher the percentage of large ground loss rate will be, and the larger the maximum ground surface settlement will be; The ratio of cutterhead torque T to mucking volume per ring Q is used as the control parameter for analyzing the ground surface settlement, and a certain positive correlation between the ratio and the surface settlement value is determined, the smaller the cutterhead opening rate is, the more accurate the fitting results will be. © 2022, Editorial Office of Modern Tunnelling Technology. All right reserved.  相似文献   

18.
Based on the background of the first phase project of the R3 line of Jinan Rail Transit, and in view of the metro shield tunnel passing under the existing railway bridge and subgrade, this paper uses Abaqus to establish a numerical model to simulate the deformation of the existing bridge and subgrade of the Jiaoji railway line under the two conditions of non-active reinforcement and reinforcement. The results show that under the condition of no reinforcement, the maximum settlement of the top bridge on the pier is -5.88 mm, and the maximum settlement difference is 5.16 mm, which exceed the deformation control requirements of the 5 mm regarding the bridge pier of the railway with ballast track. The maximum lateral displacement and longitudinal displacement of the pier are 0.28 mm and -3.01 mm, respectively. After the reinforcement measures of the bored piles are adopted, the maximum settlement of the top bridge on the pier is -1.71 mm, and the maximum settlement difference is 1.16 mm, which fully meet the bridge pier deformation control standard. The maximum lateral displacement and longitudinal maximum displacement are -0.245 mm and -2.83 mm, respectively, which meet the requirements of the control standard. The vertical settlement of the railway subgrade is relatively small. The maximum settlement values under the two working conditions are -12.31 mm and -11.97 mm, respectively, which meet the subgrade settlement control requirement of 20 mm. It is proved that the reinforcement effect of the bored pile is good, and the reinforcement scheme is safe and feasible. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

19.
The large settlements of tracks will emerge due to multiple disturbances in the construction of over- lapped shield tunnels, which affects the running safety of trains. Based on the overlapped Sungang station-Honghu station shield running tunnels of Shenzhen Metro line 7 passing underneath 26 tracks of high speed railways, a rein- forcement technology system consisting of”track support + subgrade reinforcement + interlayer soil consolidation + internal support of the lower tunnel”was developed. The settlements of tracks were mainly monitored automatically with manual monitoring as an auxiliary one. The results show that the maximum settlement of main track caused by constructing overlapped shield tunnels is -5.9 mm which is less than the control value of 10 mm, ensuring the opera- tion safety and verifying the reliability and practicability of the reinforcement technology system. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

20.
Waterseepageofakarsttunnelsectioninsoilsurroundingrockispronetosurfacesubsidence.Considering the settlement caused by descending of water level due to water leakage, a method of surface settlement estimation under steady seepage of phreatic water was proposed. Based on the seepage and consolidation theory, the changes of dead-weight and seepage effective stress of soil unit in surrounding rock was analyzed in condition of water seepage, and the settlement zone of surrounding rock was divided by taking the funnel curve of precipitation as the boundary line. A two-dimension plane was established based on the excavation cross section and the estimation formula for surface settlement due to seepage effect was deduced by means of double integral. On the basis of Yaozhai tunnel of Liuzhai-Hechi Expressway in Guangxi Zhuang Autonomous Region, the surface settlement of soil surrounding sec⁃ tion was predicted by field measurement and formula estimation respectively. Facts and figures show that the mea⁃ sured values are mainly consistent with the estimation ones, while the measured values are larger than the estima⁃ tion ones within the scope 3 m away from the excavation face along the horizontal radial direction. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号