首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.

Graphics are a powerful but often costly means of communication. Computer‐drawn graphics offer a new and relatively inexpensive way to assist the communication of complex technical information to both planners and non‐technical people whose full potential is now beginning to be realized. This paper discusses the utility of graphics and introduces three computer‐drawn graphic techniques which may be useful, both for analysis and presentation of results, in the transportation planning process. CENVUE(S) produces a three‐dimensional, perspective‐view map, on which virtually any type of transportation data or performance indicator can be displayed. VAP is designed to display origin‐destination travel patterns in any region. TDN transforms a physical‐distance network into a time‐distance network so that effects of different speeds in the transportation network can be readily seen. The cost‐effectiveness of each technique is briefly discussed and some recommendations for evaluating computer graphics techniques are provided to aid the user in further assessing their utility in the transportation planning process.  相似文献   

2.

High-speed rail operations have the potential to reduce the long-term decline in rail passenger travel demand for the medium to long distance inter-urban markets. Such decline has been evident through most of the industrialized countries where air and road transport tend to be the dominant modes. In China, the operations of long distance high-speed rail on fully dedicated track is not very easy to implement, due to the high proportion of passengers who travel between high-speed and conventional railways. An alternative approach would be to allow for mixed operations with trains of various speeds on the same track. This article puts forward a simulation model designed to allow an evaluation of the most efficient distance for high-speed rail operations under mixed train speed scenarios. The model takes into account the main operating parameters such as passenger volumes, train speeds, capital and maintenance costs, train operating costs and energy consumption. The distance of high-speed train running on conventional rail that will yield the most economic benefit can be estimated using the model. The article includes the results of using the model for a specific example. It is concluded that large-scale high-speed trains have the potential to be successfully operated on conventional rail networks.  相似文献   

3.
Abstract

Open access reforms to railway regulations allow multiple train operators to provide rail services on a common infrastructure. As railway operations are now independently managed by different stakeholders, conflicts in operations may arise, and there have been attempts to derive an effective access charge regime so that these conflicts may be resolved. One approach is by direct negotiation between the infrastructure manager and the train service providers. Despite the substantial literature on the topic, few consider the benefits of employing computer simulation as an evaluation tool for railway operational activities such as access pricing. This article proposes a multi-agent system (MAS) framework for the railway open market and demonstrates its feasibility by modelling the negotiation between an infrastructure provider and a train service operator. Empirical results show that the model is capable of resolving operational conflicts according to market demand.  相似文献   

4.
This paper proposes a mathematical model for the train routing and timetabling problem that allows a train to occasionally switch to the opposite track when it is not occupied, which we define it as switchable scheduling rule. The layouts of stations are taken into account in the proposed mathematical model to avoid head-on and rear-end collisions in stations. In this paper, train timetable could be scheduled by three different scheduling rules, i.e., no switchable scheduling rule (No-SSR) which allows trains switching track neither at stations and segments, incomplete switchable scheduling rule (In-SSR) which allows trains switching track at stations but not at segments, and complete switchable scheduling rule (Co-SSR) which allows trains switching track both at stations and segments. Numerical experiments are carried out on a small-scale railway corridor and a large-scale railway corridor based on Beijing–Shanghai high-speed railway (HSR) corridor respectively. The results of case studies indicate that Co-SSR outperforms the other two scheduling rules. It is also found that the proposed model can improve train operational efficiency.  相似文献   

5.
The paper presents a model for determining the practical capacity of a single track line, i.e. the maximum number of trains which can be run along it in a time unit under the condition that each train enters its bottleneck segment with a definite delay.

The input data used in the model are: geometrical characteristics of the bottleneck segment of the line under study, the intensity and structure of demand expressed by a number of trains which are run over the line in a given time unit, the scenario of traffic running over the line under study and the operational tactics of individual train categories processing on the bottleneck segment.

(Two tactics can be applied in the train processing on the line under study; first, the trains of individual categories are given different priorities in the processing, and second, all the trains have the same priority).

The output results of the model are average delays of trains of each category occurring within the train processing performed on the bottleneck segment of the line under study in a given time unit.  相似文献   

6.
This paper presents an attempt made to facilitate re‐scheduling of trains to minimize operational delays and accommodate uniform headways for off peak sub urban services subject to resource constraints such as locomotive availability, poor track conditions and stations without siding facilities. The paper describes the computer simulation model designed to optimize train schedules on single‐track rail lines. Using this simulation program it is possible to plan and optimize timetables for railway networks with train runs within short time periods for both single track and double track conditions. The paper describes the capabilities of presenting the results of the simulation runs. These include the time‐distance graph, the network with train movements, dialog boxes with information about selected trains. The programme is capable of changing the starting point, departure time, train destinations and adding or deleting a stop etc. from the user interface. Four objects of array variables are used in the simulation process to keep train and station data. Two object arrays are used for the train movements in up and down directions. The stations' data are stored in the other two object arrays. One of these arrays of stations contains all the stations of the line while the other one contains only the stations with siding facilities. A case study that covers a 61 km long single‐track line with 14 stations is presented to highlight the model capabilities.  相似文献   

7.
Abstract

The current air traffic system faces recurrent saturation problems. Numerous studies are dedicated to this issue, including the present research on a new dynamic regulation filter holding frequent trajectory optimisations in a real-time sliding horizon loop process. We consider a trajectory optimisation problem arising in this context, where a feasible four-dimensional (4D) trajectory is to be built and assigned to each regulated flight to suppress sector overloads while minimising the cost of the chosen policy. We model this problem with a mixed integer linear programme and solve it with a branch-and-price approach. The pricing sub-problem looks for feasible trajectories in a dynamic three-dimensional (3D) network and is solved with a specific algorithm based on shortest path labelling algorithms and on dynamic programming. Each algorithm is tested on real-world data corresponding to a complete traffic day in the European air traffic system; experimental results, including computing times measurement, validate the solution process.  相似文献   

8.
The objective of the research described in this paper was to develop a model for computation of an ultimate capacity of a single track line and to provide a sensitivity analysis of this capacity to the parameters which influence it. The model is based in a concept of mathematical expectation of capacity and can be applied under saturation conditions i.e. a constant demand for service. It can serve for planning purposes, computation of single track line capacity on the base of which estimations are possible concerning a single track line performance under given conditions, as well as commercial time‐tables planning, decisions about a partial or complete construction of the second parallel track along the line in service, intermediate stations locations planning and the necessary facilities along the line under construction.

In the sensitivity analysis, the model allows a change of parameters upon which the capacity depends. These are: the length of the line segment which is considered to be bottleneck for calculation of capacity, traffic distributions per directions, train mix, train velocities and train spacing rules applied by the dispatching service when regulating the traffic on a line.  相似文献   

9.

Much PRT development and research is currently being undertaken assuming quasi‐synchronous longitudinal control of guideway vehicles. This method of control has the characteristic that intersection performance has a substantial influence on the efficiency of trip demand processing. An algorithm for the control of a PRT intersection is discussed here, which would appear to have significant advantages over all other known existing stratagems. The stratagem is not only efficient but its flexibility facilitates tailoring to diverse local conditions; furthermore, the algorithm does not require intractable computations or excessive computer memory requirements. The algorithm is described and simulation results are presented. A comparative study is also made between this algorithm and its fore‐runner.  相似文献   

10.
Moshe Givoni 《运输评论》2013,33(5):593-611
Abstract

The inauguration of the Shinkansen high‐speed train service between Tokyo and Osaka, Japan, at 210 kph maximum operating speed some 40 years ago marked the comeback of the train as an important passenger mode of transport. Since then high‐speed train (HST) services have been introduced in many countries and are planned in many more, and the train has once more become the dominant mode of transport on many routes. This review summarizes the different elements of HST operation with the aim of characterizing HST operation and putting in context its impact in terms of what it is best designed for and what it can deliver. The review concludes that the HST is best designed to substitute conventional railway services on routes where much higher capacity is required and to reduce travel time, further improving the railway service, also against other modes, therefore leading to mode substitution. However, the high investment in HST infrastructure could not be justified based on its economic development benefits since these are not certain. Finally, the following definition for HST services is suggested: high capacity and frequency railway services achieving an average speed of over 200 kph.  相似文献   

11.
Ferreira  Luis 《Transportation》1997,24(2):183-200
As privatisation of railway systems reach the political agendas in a number of countries, the separation of track infrastructure from train operations is seen as providing the vehicle which will improve profitability within the rail industry. This paper deals with three main issues related to such separation within a freight railway focus, namely: investment appraisal; track standards and maintenance; and train operating performance. The conflicts of interest between the owners of track and their client operators are discussed in detail. Costs related to track capacity and congestion need to be taken into account, given that additional trains are likely to lead to increased risk of delays to existing services. The paper discusses the use of a travel time reliability model to estimate the additional costs imposed on the system through the introduction of specific train services.It is concluded that investment in individual elements of railway infrastructure must be integrated with the overall financial and customer service strategies of both operators and owners. As an alternative to current practices, a hybrid model of track ownership is put forward here. Under such a model, a joint-venture company with equity from the main ÒplayersÓ would be owner of track. This would allow some of the benefits of vertical integration to be retained, whilst providing fair access to new operators.  相似文献   

12.

Freight transfer operations are critical in combined transport networks. In this paper a simulation model and modelling approach to the transfer of cargo between trains at rail terminals is presented. The model is used to study the Port-Bou terminal, the main intermodal terminal at the Spanish-French frontier. Four different gantry crane operation modes to interchange containers between trains are evaluated. These operation rules are tested in several scenarios to examine the critical factors of the system and the best operation rule for each situation. Latest generation software is used to develop the model that incorporates modular programming and enhanced graphic systems for output representation. It allows a dynamic display of the simulated system and, likewise, the possibility of developing modules that can be reused in other studies. The research shows how simulation can be a useful planning tool in the rail transportation context.  相似文献   

13.

This paper explores the tenuous link between speeding behavior and accident causation, one that has not been well established in the international literature to date. Taking advantage of established engineering conventions and formulae, we were able to set up an a priori hypothesis suitable for testing. Utilizing this formal scientific method (which GIS researchers have been criticised for not using) we establish a statistical link for this relationship. Our methodology can be used to support all police intervention strategies, including the controversial photo radar systems. The results from our research have been entered into a GIS in order to create a map for spatial display. This map illustrates the relative probability or risk of collision occurrence resulting from speeding at all intersections and interchanges within the scope of the study. It is suggested that this methodology could easily be maintained with periodic updates of data, thus creating a dynamic model from which to monitor traffic safety within the city. Furthermore, this model can be utilized to study specific strategies, allowing for the scrutiny of before, during and after effects. The study area is the entire city of Calgary, Alberta, Canada, and includes all traffic collisions occurring during the year of 1994.  相似文献   

14.
Abstract

This paper reviews the main modules of an integrated system for incident management in real-time, -sim. A core to such a system is a microscopic simulator with extended abilities to model the temporal and spatial evolution of specified non-recurrent traffic conditions. The paper reviews the mathematical formulation of the car-following and lane-changing modules. The model is validated using a simulation-based approach. Concluding comments on the general validation process of the model are provided. The paper finally presents a sample of the accident patterns replicated by the model together with their implications for real world validation.  相似文献   

15.
ABSTRACT

In current urban planning practice, macroscopic transport demand and assignment models are essential for the evaluation of mid- and long-term land use developments and infrastructure investments. The credibility of their projections strongly depends on their ability to reproduce present day traffic volumes. Obviously, a simplified model of reality will display some shortcomings, and the effect of these is asserted by quality measures that quantify the divergence from observed traffic volumes. There is, however, only rough guidance regarding acceptable ranges of these measures. Most of the literature on this subject approach these ranges from below, by discussing measures attained by operational models and using these as a benchmark, or by using the adverse effects of modelling errors to derive a minimum quality level. On the contrary, this study suggests upper limits for quality measures by analysing year-on-year variations in traffic volumes that result from changing land use and infrastructure.  相似文献   

16.
Abstract

This paper develops a model for estimating unsignalized intersection delays which can be applied to traffic assignment (TA) models. Current unsignalized intersection delay models have been developed mostly for operational purposes, and demand detailed geometric data and complicated procedures to estimate delay. These difficulties result in unsignalized intersection delays being ignored or assumed as a constant in TA models.

Video and vehicle license plate number recognition methods are used to collect traffic volume data and to measure delays during peak and off-peak traffic periods at four unsignalized intersections in the city of Tehran, Iran. Data on geometric design elements are measured through field surveys. An empirical approach is used to develop a delay model as a function of influencing factors based on 5- and 15-min time intervals. The proposed model estimates delays on each approach based on total traffic volumes, rights-of-way of the subject approach and the intersection friction factor. The effect of conflicting traffic flows is considered implicitly by using the intersection friction factor. As a result, the developed delay model guarantees the convergence of TA solution methods.

A comparison between delay models performed using different time intervals shows that the coefficients of determination, R 2, increases from 43.2% to 63.1% as the time interval increases from 5- to 15-min. The US Highway Capacity Manual (HCM) delay model (which is widely used in Iran) is validated using the field data and it is found that it overestimates delay, especially in the high delay ranges.  相似文献   

17.
《运输规划与技术》2012,35(8):868-880
ABSTRACT

Analysis of elevator traffic in high rise buildings is critical to the performance evaluation of elevator group control systems (EGCS). Elevator dispatching methods or parking algorithms in an EGCS can be designed or modified according to analyses of traffic flow. However, interpretation of traffic flow based solely on numerical data may not be explicit and transparent for EGCS experts as well as for other non-expert building administration. In this study, we present a model for visualization and analysis of elevator traffic. First, we present an alternative approach for traffic analysis which we call route visualization. In the proposed approach, we initially decompose elevator traffic into its component parts and investigate each component independently. Then, using superposition of components we obtain a reconstructed model of overall traffic. This modeling approach provides component-based traffic analysis and representation of routes with intensities through data visualization. In the second part we introduce a multi-dimensional analysis of time parameters in ECGS. This approach provides a comparative analysis of several control algorithms such as dispatch or park algorithms for different combinations of traffic components.  相似文献   

18.
《运输规划与技术》2012,35(8):777-824
ABSTRACT

In this paper, a fuzzy-stochastic optimization model is developed for an intermodal fleet management system of a large international transportation company. The proposed model integrates various strategic, tactical and operational level decisions simultaneously. Since real-life fleet planning problems may involve different types of uncertainty jointly such as randomness and fuzziness, a hybrid chance-constrained programming and fuzzy interactive resolution-based approach is employed. Therefore, stochastic import/export freight demand and fuzzy transit times, truck/trailer availabilities, the transport capacity of Ro-Ro vessels, bounds on block train services, etc. can also be taken into account concurrently. In addition to minimize overall transportation costs, optimization of total transit times and CO2 emission values are also incorporated in order to provide sustainable fleet plans by maximizing customer satisfaction and environmental considerations. Computational results show that effective and efficient fleet plans can be produced by making use of the proposed optimization model.  相似文献   

19.
Abstract

Waiting time influences the overall perception of service quality. The passenger-perceived waiting time can determine their waiting experience. The concept of waiting time refers to the comparison between the passengers' inherent tolerance of waiting and the possible improvement scenarios. This study investigates the passengers' tolerance of waiting under various scenarios of train delays in order to improve their perceived waiting time. We propose the adoption of a modern psychometric method utilizing the Rasch model to measure a subjective latent construct known as ‘wait tolerance'. The Rasch measurement provides mathematical procedures for transforming scores from an ordinal to an interval scale to observe which scenarios can reduce certain passengers' perceived waiting time in the case of a delay. Empirical results show that ‘uncontrollable circumstances', ‘friendly staff attitudes', and ‘providing appropriate messages of apology' can improve the passenger-perceived waiting time during train delays. Likewise, distinct differences are found in the passengers' tolerance of waiting in terms of various personal characteristics, such as gender, age, and train riding frequency. The findings propose the implementation of strategies for improvement by rail system operators, as well as for regulators to define a reasonable service level in the case of train delays. The reviews show possible future innovative research orientations as well.  相似文献   

20.
This paper investigates the coordinated cruise control strategy for multiple high-speed trains’ movement. The motion of an ordered set of high-speed trains running on a railway line is modeled by a multi-agent system, in which each train communicates with its neighboring trains to adjust its speed. By using the potential fields and LaSalles invariance principle, we design a new coordinated cruise control strategy for each train based on the neighboring trains’ information, under which each train can track the desired speed, and the headway distances between any two neighboring trains are stabilized in a safety range. Numerical examples are given to illustrate the effectiveness of the proposed methods.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号