共查询到19条相似文献,搜索用时 156 毫秒
1.
坝陵河大桥钢桁梁架设施工控制 总被引:5,自引:1,他引:4
坝陵河大桥为主跨1 088 m的单跨双铰钢桁梁悬索桥,钢桁梁采用桥面吊机由主塔向跨中进行有铰逐次刚接架设.针对施工中铰处钢桁梁线形不平顺且坡度大,吊索提升力变化较大,临时铰合龙口较多且合龙精度要求高,跨中合龙段合龙口长度偏小及上、下弦合龙口长度偏差不同等难点,对主要施工技术研究、控制后,采用调整吊机轨道坡度及观测临时铰开口量变化并及时与理论值校核的措施,关键梁段双吊点提升、加密观测临时铰合龙口并自然合龙方案,梁端牵引及合龙前端吊索暂不安装的措施,保证各工序安全、有效,实现高精度合龙. 相似文献
2.
3.
《世界桥梁》2016,(4)
贵广(南广)高铁北江特大桥主桥为(57.5+109.25+230+109.25+57.5)m的钢桁梁斜拉桥,钢桁梁采用2片三角形桁式结构。该桥主墩两侧钢桁梁节间利用架梁吊机对称架设安装,设1个合龙口(位于跨中)。针对该桥跨度大、合龙杆件多、安装精度要求高等难点,钢桁梁合龙前,进行钢桁梁姿态监测、高程控制等准备工作。根据合龙误差计算结果,进行合龙口处标高、转角、温度、轴线偏位、横向扭转、纵向位移等参数敏感性分析,确定采用调整配重和温度的方式进行合龙。结合合龙口的连续监测结果,确定钢桁梁通过配重后,在30℃的温度下,先合龙下弦,然后再上弦,最后合龙腹杆及横梁、纵梁的多点合龙方案。实践表明,桥梁合龙精度为±4mm,实现了钢桁梁的无应力合龙。 相似文献
4.
杭瑞高速岳阳洞庭湖大桥是一座两跨连续钢桁架加劲梁悬索桥,施工中梁段刚接与吊装同步或滞后完成,至合龙前除个别位置临时铰未封闭外,其余已吊装梁段完成刚接,基本实现了合龙即刚接完毕的施工工艺。与传统的全铰接施工方法相比,这种施工方法在合龙段安装时要复杂得多。在洞庭湖桥施工中,提出了利用缆载吊机自身提升力实现梁段姿态动态调整的合龙段施工新思路。利用桥梁非线性分析系统Bnlas模拟桥梁合龙施工全过程,探讨了新方案的可行性。研究结果表明:洞庭湖大桥利用缆载吊机调整梁段姿态可顺利完成无应力合龙施工,且相应构件满足受力要求。相比传统压重方案,减少了压重成本,其动态调整合龙口两侧高差与倾角的优势极大限度地排除了外界因素干扰。 相似文献
5.
厦漳跨海大桥北汉主桥为主跨780 m的连续钢箱梁斜拉桥,标准梁段长15 m,宽38 m,节段最重361 t.墩顶区共9节梁段,均采用活动支架辅助不变幅架梁吊机吊装施工,解决了浅滩区浮吊无法作业的难题;边跨合龙采用斜拉索超张拉辅助悬臂拼装施工,避免了合龙口观测、合龙段姿态调整及合龙口临时连接等大量工作,降低了施工难度,提高了匹配精度和成桥线形质量;中跨合龙采用顶推辅助配切法施工. 相似文献
6.
武汉二七长江大桥跨中钢梁合龙施工技术 总被引:1,自引:1,他引:0
武汉二七长江大桥主梁采用混合梁,其中汉口及武昌岸90m边跨为混凝土梁,其余梁段均为工字形截面钢-混结合梁。施工时,4号墩侧钢梁采用双悬臂对称架设,5号(3号)墩侧钢梁采用单悬臂由6号(2号)墩向跨中方向架设,跨中钢梁合龙段设置在ZL35节段。为选择有效的合龙调整措施,采用SCDS2008软件对合龙前钢梁进行敏感性分析,分析结果表明:不同的水平对拉荷载对合龙口水平位移影响较大;压重和斜拉索张拉对合龙口竖向位移影响较大;采用移动吊机调整竖向位移可控性较差。根据敏感性分析,合龙前对跨中钢梁标高及转角、纵向位移、上下游高差及轴线偏位进行调整。最终通过在5号(3号)墩布置千斤顶整体纵向移动钢梁、对孔、安装冲钉实现跨中钢梁主动合龙。 相似文献
7.
G3铜陵长江公铁大桥主桥为跨径布置(127.5+131+988+131+127.5) m斜拉-悬索协作体系桥,结合斜拉-悬索协作体系桥结构特点,提出主梁跨中合龙和交叉区合龙2种方案。对于跨中合龙方案,无法实现直接跨中合龙,可采取合龙口两侧主梁压重或设置临时吊索施工措施进行合龙口调整实现跨中合龙,当采用压重措施时,全桥需压重2 450 t;当采用设置临时吊索措施时,全桥共需设置临时吊索44根。对于交叉区合龙方案,提出采用插值计算方法寻找主梁最优合龙口,该桥最优合龙口位于从桥塔往中跨方向第3根吊索之下,在交叉区最优合龙口合龙主梁不需要采用其它措施,合龙口两侧主梁线形可自动匹配。从结构受力、施工便捷性、工期等方面对2种方案进行对比,结果表明:主梁合龙口设置于交叉区时主梁受力较小,无需压重或设置临时吊索,且由于斜拉段和悬吊段主梁可以同步吊装,节约工期,因此该桥主梁采用交叉区合龙方案。大桥主梁推荐施工方案为先边跨钢梁顶推施工,再主跨钢梁单悬臂架设及缆载吊机吊装,最后在交叉区合龙。 相似文献
8.
新建商合杭铁路芜湖长江公铁大桥主桥为(99.3+238+588+224+85.3)m的钢箱板桁结合梁斜拉桥,主梁上层为板桁结合,下层为钢箱结合钢桁梁。该桥钢梁划分为89个铁路面梁段单元和94个公路面梁段单元,采用分段吊装施工,钢梁架设采用"浮吊辅助架设墩顶节段+桥面架梁吊机悬臂架设"的总体方案,设中跨合龙口。首先利用浮吊起吊,采用支架法架设2号和3号桥塔墩墩顶的3个钢梁节段,然后在公路桥面上各安装2台桥面架梁吊机进行双悬臂架设,悬臂架设至辅助墩前方时,利用浮吊起吊安装辅助墩墩顶钢梁节段;当悬臂架设至边墩前方时,采用"浮吊+支架"辅助桥面架梁吊机悬臂架设边墩墩顶钢梁节段;最后利用2号墩侧架梁吊机提升中跨合龙段进行中跨合龙。 相似文献
9.
杨泗港长江大桥主桥为单跨1 700m的地锚式悬索桥。加劲梁为华伦式钢桁梁,采用千吨级整体节段吊装、全焊结构新技术。单节段加劲梁采用2台900t缆载吊机抬吊安装,最大吊重约1 010t,全桥共配置4台吊机,由跨中向两岸桥塔逐段对称吊装。加劲梁按成桥线形制造安装,规避产生永久施工内力;加劲梁吊装过程中采取了部分配重+临时连接的最优临时连接方案。汉阳侧岸滩区域梁段采用荡移+滑移、墩顶无吊索区域梁段采用荡移、其余标准梁段均采用2台吊机垂直抬吊架设。主索鞍随着加劲梁的吊装分3个阶段顶推复位;采用预偏法施工合龙段;合龙后从跨中向两岸桥塔依次上下左右对称进行栓焊永久连接。 相似文献
10.
厦漳跨海大桥南汉主桥为双塔平行索面钢-混凝土结合梁斜拉桥.该桥原定中跨合龙采用配切合龙方案,但由于配切合龙对气温的预测要求较高、合龙开始时间不确定,最终确定该桥中跨合龙采用定时合龙技术.定时合龙技术在合龙口旁第2个梁段安装完后,对扩大的合龙口进行连续观测,对合龙段提前下料,在标准段安装完后,立即开始吊装合龙段.该技术以长圆孔工具板、临时连接件为辅助工具,先固定合龙口状态,再确定永久拼接板的尺寸,最后由永久拼接板替换工具板,完成合龙.该桥采用定时合龙技术顺利合龙,实践表明,该技术放宽了对体系变形预测准确性的要求,提高了合龙的可靠性、降低了结构的安全风险. 相似文献
11.
Four methods of erecting steel stiffening truss girder of suspension bridge,including the deck lifting gantry crane method,the cable-mounted crane method,the cantilever erection method with derrick crane and the incremental launching method,were studied Based on construction conditions of the bridge,according to the optimal combination of various factors such as construction safety,quality,period,environmental protection and economic performance,etc,the cantilever erection method with derrick crane was recommended for the bridge. On this basis,three categories of connection in cantilever erection methods,including the all hinged method,the successive fully splicing method and the successive splicing with temporary erection hinge method,were studied The successive splicing with temporary erection hinge method was recommended in the bridge with consideration of the requirements of construction safety,quality and time limit In addition,the traction method of hangers at the top end during cantilever erection was studied Finally,the erection method of three key
stages,including the first segment near the pylon,the standard segment,as well as the closure segment of steel stiffening truss girde,r was studied. The cantilever erection method with derrick crane provides a new way for design and construction of long-span suspension bridge with steel stiffening truss girder in the western area of China 相似文献
12.
南京长江第三大桥钢箱梁桥面吊机及梁段吊装工程 总被引:7,自引:0,他引:7
南京长江第三大桥钢箱梁吊装采用桥面吊机,吊装的提升、纵横坡及水平位移调整、吊机的移动等操作均通过液压系统完成,操作过程平稳、方便,可自由进行各项微调动作,安装精度高。对南京长江第三大桥桥面吊机的结构、使用和钢箱梁梁段吊装工艺和关键技术作简单介绍。 相似文献
13.
大跨度钢-混凝土组合结构连续箱梁施工线形控制 总被引:2,自引:0,他引:2
上海长江隧桥工程B4标钢-混凝土组合结构连续箱梁是国内最大的组合梁结构,采用梁场预制,浮吊安装的世界先进施工技术,组合梁设置了纵坡,并位于不同曲率半径的曲线上,线形控制非常复杂.介绍其钢梁节段拼装、整孔吊装段的总拼、钢-混凝土叠合、墩顶合龙等关键施工阶段的线形控制措施及效果. 相似文献
14.
黄冈公铁两用长江大桥桥塔墩顶4个节间钢梁架设方案 总被引:5,自引:5,他引:0
黄冈公铁两用长江大桥主桥钢梁总体架设采用散拼架设方案.为解决浮吊资源问题,结合钢梁总体架设方案,通过架梁吊机和临时支架的安装及架梁吊机在此站位情况下实现墩顶节间钢梁架设的可行性研究,确定该桥塔墩顶4个节间钢梁架设方案为:先利用浮吊趁高水位时在墩旁托架上安装1个临时支架,然后在此临时支架上安装1台WD70C型架梁吊机,利用该架梁吊机完成墩顶4节间钢梁的架设工作.目前,利用该方案已完成第1个节间的钢梁架设,验证了该方案的可行性. 相似文献
15.
连镇铁路五峰山长江大桥主桥为主跨1092 m的钢桁梁公铁两用悬索桥,加劲梁采用板桁结合钢桁梁结构,加劲梁恒载集度大(819.1 kN/m)。其中,一期恒载集度达501 kN/m;铁路桥面和公路桥面二期恒载集度分别为233.4 kN/m和84.7 kN/m。针对该桥特点,加劲梁采用整节段吊装,架设时采用不携带铁路二期恒载的方案施工。边跨加劲梁节段利用浮吊整体吊装至滑移支架上,再滑移至设计位置,连接成整体;中跨加劲梁节段采用2台900 t缆载吊机自跨中向两侧桥塔方向架设,节段间上弦设牛腿式临时铰进行铰接,待中跨80%节段吊装后再进行刚接;中跨加劲梁架设后,对边跨加劲梁整体姿态进行调整,通过顶、落梁与中跨加劲梁合龙,合龙后铺设铁路二期恒载。 相似文献
16.
武汉天兴洲公铁两用长江大桥钢桁梁整节段组拼技术 总被引:3,自引:3,他引:0
武汉天兴洲公铁两用长江大桥在国内首次采用了整节段钢桁梁架设工艺,详细介绍了钢桁梁整节段的组拼技术及板桁结合钢桁梁整节段的施工要点. 相似文献
17.
某铁路黄河特大桥为24×48 m上承式钢桁梁桥,建于1969年,因长期服役,梁体安全储备下降,现采用明桥面钢箱梁替换既有钢桁梁.换梁施工采用拖拉法,设置拼装支架、拖拉反力支架、跨线龙门吊等大型临时设施,分别完成钢箱梁拼装、既有钢桁梁拆除及钢箱梁提升上桥;利用PLC同步控制系统和大吨位拖拉牵引系统进行梁体单点单向整体纵向... 相似文献
18.
武汉天兴洲公铁两用长江大桥钢梁架设边跨合拢施工技术 总被引:1,自引:1,他引:0
武汉天兴洲公铁两用长江大桥主桥为3片主桁、三索面的钢桁梁斜拉桥,其边跨钢梁合拢架设中遇到钢桁梁刚度大、斜拉索对标高调节力度有限、合拢点多等技术难题. 经过现场监控测量与理论计算分析,采用了岸侧钢梁整体纵移、塔侧钢梁围绕塔墩支座适当转动、斜拉索微调等措施实现了边跨钢桁梁的高精度合拢. 相似文献
19.
上海崇明越江通道长江大桥105m钢-混凝土组合梁运输安装方案 总被引:1,自引:0,他引:1
上海崇明越江通道长江大桥工程B4标段105 m钢-混凝土组合梁吊装、运输和架设施工由3 000 t"天一"号海上运架梁专用起重船承担,介绍起重船码头取梁、组合梁与船体临时加固、运输途中加强安全监控和桥区抛锚定位架设等施工方案。 相似文献