首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到5条相似文献,搜索用时 0 毫秒
1.
The aim of this paper is to analyse and compare the methods used for calculating emissions of UK rolling stock based on their type and mode of operation. The three modes under comparison were; diesel, electric and bi-mode. As well as comparing these three modes of operation, a comparison between Conventional, Freight and High Speed Rail was made. Alternate fuels were considered for diesel and bi-mode locomotives and compared based on their environmental impact. The emissions of trains were studied using three methods. Specifically, the three chosen methods were used to calculate the emissions of each train and a comparison of these methods was made. In the current UK energy climate, diesel trains emit less emissions than electric trains when factoring in mechanical and air resistances. Bi-mode trains have their place in the UK network but with electrification of the network currently in place, this mode of operation will become redundant in the near future. High Speed Rail, although time efficient, releases high emissions due to energy consumption increasing with the square of speed. Alternative fuels, such as biodiesel, should be a consideration for the future of rail, as emissions fall dramatically with content of biodiesel in fuel blends.  相似文献   

2.
After a major service disruption on a single-track rail line, dispatchers need to generate a series of train meet-pass plans at different decision times of the rescheduling stage. The task is to recover the impacted train schedule from the current and future disturbances and minimize the expected additional delay under different forecasted operational conditions. Based on a stochastic programming with recourse framework, this paper incorporates different probabilistic scenarios in the rolling horizon decision process to recognize (1) the input data uncertainty associated with predicted segment running times and segment recovery times and (2) the possibilities of rescheduling decisions after receiving status updates. The proposed model periodically optimizes schedules for a relatively long rolling horizon, while selecting and disseminating a robust meet-pass plan for every roll period. A multi-layer branching solution procedure is developed to systematically generate and select meet-pass plans under different stochastic scenarios. Illustrative examples and numerical experiments are used to demonstrate the importance of robust disruption handling under a dynamic and stochastic environment. In terms of expected total train delay time, our experimental results show that the robust solutions are better than the expected value-based solutions by a range of 10-30%.  相似文献   

3.
Determining the initiation time of substitute bus (SB) services is critical for metro disruption management, especially under uncertain recovery time. This study develops a mathematical formulation to determine the optimal initiation time (OIT) of SB services by trading-off their initiation cost and passenger delay cost, thereby minimizing the total system cost. Given the probability distribution of metro disruption duration, we determine the OIT by formulating an optimization problem to minimize the expected total system cost. We then conduct sensitivity analyses of the initiation cost of SB services, passenger value of time, and SB services rate. The results show that SB services ought to be activated only if the metro incident lasts longer than a certain time interval, depending on the factors mentioned earlier, and the OIT should advance with the predicted incident duration. This paper derives analytical results for the case of linear passenger arrival, and determines the results numerically for the case of non-linear passenger arrival when analytical closed-form solutions are not available. The findings will facilitate transit operators to develop response plans in the aftermath of a metro disruption.  相似文献   

4.
According to the Belgrade Master Plan for 2021, the public transportation system for the city and its region will include three rail modes: a modernized existing tramway, regional rail, and a new light rail transit (LRT) mode. In the coming years all three rail modes should be developed simultaneously and in a coordinated manner. The introduction of LRT is to be realized in several phases, and its first line will partially follow the alignment of an existing tramway line. As the present tramway vehicles are obsolete, new rolling stock must be designed and purchased to be compatible with many of the elements of the LRT. Ways to adjust the new tramways to the LRT rolling stock represent the central topic of this paper. The basic technical and operating characteristics of the new tramway are defined with respect to their required compatibility with the LRT stock and infrastructure.  相似文献   

5.
"四化"管理作为一种理念,对公路工作有着很强的指导性和针对性。实施"四化"管理,对实现收费公路科学发展、和谐发展和可持续发展有着深远的意义。构建和谐征缴关系,最关键就是处理好征费管理者与服务对象的关系。理顺征缴关系,就是要理顺缴费群体和内部事务关系。抓住"以人为本",促进征缴双方和谐,才能实现通行费征收事业全面协调发展。  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号