首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
This paper questions some aspects of the technical soundness and public acceptability of environmental traffic management scheme of the kind advocated in the Buchanan report, Traffic in Towns. Practical studies have shown that in inner city areas in particular, and perhaps older built-up areas in general, the concept cannot be adequately defended against a wealth of variety of criticism from those whom it most directly affects, i.e. the public. Participation exercises have revealed public fears that the road closures associated with schemes will ruin the viability of local shops, worsen the environmental conditions along local roads chosen as distributors, cause even greater congestion on the main road network due to displaced traffic, and impede the accessibility of local people to their homes. In the light of these, it is suggested a flexible policy be adopted incorporating changes to the forms of vehicles and the manner in which they are used as well as changes to the physical form of the road network.The opinions expressed in this paper do not necessarily reflect those of the organisations to which the authors are attached.  相似文献   

2.
This paper investigates an issue largely ignored in the transport literature on cost overruns, namely, cost increases in the early project phase, long before the decision to build is made. This is the phase of project planning that is referred to as the front-end phase in the literature. The rationale of the study is that unless cost estimates during the front-end phase are relatively accurate, the wrong projects may be selected for further development. We first argue for why it is important to address cost escalation during the front-end phase of project planning. We then use Norwegian data to demonstrate the magnitude of cost escalations during the front-end phase of projects and in comparison to the implementation phase. We find that even in a sample of projects with relatively small cost overruns as in the case of Norway, there are substantial cost increases before the formal decision to build was made. This raises the issue of whether decisions and priorities taken at the early stages of project development are based on false information and whether this may lead to the wrong project concepts being selected.  相似文献   

3.
ABSTRACT

This narrative review synthesised the limited work that has been carried out into road safety education targeting parents. Parent education appeared to have a positive impact on child safety seat use and children’s bike helmet use, but results regarding the impact of parent education on pedestrian safety were mixed. The review highlighted important gaps in the literature. A key gap being identifying effective ways to engage parents of low socioeconomic and ethnic minority backgrounds. Further, another gap is understanding effective ways to engage and support parents of children with additional needs to build their children’s road safety skills. There is some evidence that parent education has a positive impact on these “at-risk” groups, but little work on how to engage with these groups and the type of parent education required.  相似文献   

4.
The most common daily trip for employed persons and students is the commute to and from work and/or place of study. Though there are clear environmental, health and safety benefits from using public transport instead of private vehicles for these trips, a high proportion of commuters still choose private vehicles to get to work or study. This study reports an investigation of psychological factors influencing students’ travel choices from the perspective of the Theory of Planned Behaviour (TPB). Students from three different university campuses (n = 186) completed a cross-sectional survey on their car commuting behaviour. Particular focus was given to whether car commuting habits could add to understanding of commuting behaviour over and above behavioural intentions. Results indicated that, as expected, behavioural intention to travel by car was the strongest TPB predictor of car commuting behaviour. Further, general car commuting habits explained additional variance over and above TPB constructs, though the contribution was modest. No relationship between habit and intentions was found. Overall results suggest that, although student car commuting behaviour is habitual in nature, it is predominantly guided by reasoned action. Implications of these findings are that in order to alter the use of private vehicles, the factors influencing commuters’ intentions to travel by car must be addressed. Specifically, interventions should target the perceived high levels of both the acceptability of commuting by car and the perceived control over travel undertaken by private vehicle.  相似文献   

5.
This study aims at investigating the impact and feasibility of charging taxis with toll fee in the pricing zone when designing congestion pricing scheme. A bi‐level programming model is developed to compare the maximum social welfares before and after the congestion charge is imposed on taxis. The lower level is a combined network equilibrium model formulated as a variational inequality program, which considers the logit‐based mode split, route choice, elastic demand, and vacant taxi distributions. The upper level is to maximize the social welfare when toll rates vary. The bi‐level problem can be solved by the genetic algorithm, whereas the lower level is solved by the block Gauss–Seidel decomposition approach together with the method of successive averages and diagonalization algorithm. An application with numerical examples is conducted to demonstrate the effectiveness of the proposed model and algorithm and to reveal some interesting findings. Copyright © 2014 John Wiley & Sons, Ltd.  相似文献   

6.

A methodology for comparing phased implementation plans for a new fixed guideway transit system in an urban area is presented. Four assumptions are made: (1) the guideway system replaces existing or planned bus service, (2) superior service on the new system results in increased ridership when compared to buses; (3) presence of the guideway facility redirects outward urban growth resulting in additional ridership, and (4) conversely, the absence of any action on the new guideway facility reinforces a diffuse urban growth pattern that creates an irreversible loss of transit ridership. The economic comparision of alternative plans includes total as well as “relative” inflation of principal cost components. A key feature of the proposed methodology is including in the comparisons the costs of private automobile mileage that could have been replaced by transit. These costs are expressed as “fuel” and “all other” automobile costs; favorable transit system implementation schedules can then be identified as a function of parametrically assumed values for these two unit costs. A hypothetical example demonstrates the proposed method.  相似文献   

7.
The new Badaling tunnel is the longest tunnel on the under-construction Beijing-Zhangjiakou highspeedrailway, with the Badaling Great Wall station to be built in the tunnel. This station, which is under the Badaling Great Wall historic site, is the world’s largest underground high-speed railway station with the most complicated structure and the largest overburden and excavation area. It is therefore a representative project for China’s highspeed railway development strategy, supporting infrastructure facilities for the Beijing Horticultural Expo 2019 and the 2022 Winter Olympics in Beijing, and it is important that it be of high quality and completed safely. In the de-sign and construction of the station, the glyphs of the Chinese characters of "中",”国”,”人”and”品”are used, re-spectively, along the station route, in the rescue and evacuation mode, auxiliary adit and partial excavation, which is a way to successfully integrate the art of Chinese characters into tunnel engineering. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

8.
Abstract

This paper examines 42 business‐as‐usual (BAU) scenarios for future transport and traffic development in the Netherlands from the period 1970 to 2000. An important aspect of these scenarios is that they indicate the potential future state of the transport system if the policies in place at the time continue unchanged, thus raising issues which may require a policy response. This paper shows that in most of the important BAU transport scenario results of the past in the Netherlands, such as future car use and transport emissions, the policy makers were not misled. The prognoses for traffic congestion are an important exception as they underestimated the congestion problems that would arise. This paper shows that, based on the research it examines, BAU transport forecasting is an inaccurate practice. It is recommended that the BAU scenario designer communicates this high inaccuracy, enabling the policy maker to include the inherent future uncertainty in their decision‐making.  相似文献   

9.
The newly-built tunnel passing closely under the existing station will inevitably lead to settlement of the existing station, and especially deformation joints are prone to differential settlement. Based on the Suzhoujie Station of Beijing Subway Line 16 passing closely under the existing Line 10, this paper analyzes the overall settlement of the existing station and the differential settlement at deformation joints through a combination of field measurement and numerical simulation. The study results show that installing jacks significantly prevents the settlement of the existing station, after installation of jacks the settlement of the existing station is reduced by about 58%, and the jacking force of the jack shall be controlled between 180-450 t; the impact of construction on the single-deck station structure side at deformation joints is greater than that on the double-deck station structure side, the stress on the socket is gradually increased with the excavation of the lower tunnel, and reduced after installation of jacks, indicating that the jack can effectively reduce the tensile stress of the existing station and maintain the safety of the existing station; with the action of the jacking force of jacks, the settlement curve of the existing station presents a stepwise change at the jack installation points, while the upper ground surface settlement is relatively uniform. © 2022, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

10.
Abstract

The economics literature offers many examples of studies of the economic impact of transportation infrastructure such as highways, ports, and airports; however, little attention has been paid to other types of infrastructure such as logistics platforms. This article is a first assessment of the economic effects of the largest logistics platform in Europe – PLAZA, the Zaragoza Logistics Platform – located in Spain. More precisely, this paper analyzes the economic significance of PLAZA on the economy of the Aragon region where it is located. The methodology is based on the application of input–output analysis to the final demand of logistics platform-based companies in a manner that is similar to well-established studies of the economic impacts of tourism on tourist expenditure. This makes it possible to quantify the various levels of economic effects (direct, indirect, and induced) in terms of jobs, salaries, and wages, turnover, gross operating surplus (GOS), and gross value added (GVA). The conclusions reveal the economic importance PLAZA has for the regional economy of Aragon, representing just over 2% of total GVA and 3% of turnover.  相似文献   

11.
The circulation system of a slurry shield is composed of a transportation system and a processing system.For shield construction, correct selection of the circulation system for the slurry shield is directly related to construc-tion speed. Using the Nanjing Yangtze tunnel as an example, the material balance calculation of the circulation sys-tem, sieving effect analysis, and analysis of the muck carrying ability of the dredging pipe are conducted for various strata. The practical results show that above mentioned calculations and analysis method provide a good reference for the proper selection of a slurry separation system and dredge pipe. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

12.
The circulation system of a slurry shield is composed of a transportation system and a processing system.For shield construction, correct selection of the circulation system for the slurry shield is directly related to construc-tion speed. Using the Nanjing Yangtze tunnel as an example, the material balance calculation of the circulation sys-tem, sieving effect analysis, and analysis of the muck carrying ability of the dredging pipe are conducted for various strata. The practical results show that above mentioned calculations and analysis method provide a good reference for the proper selection of a slurry separation system and dredge pipe. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

13.
14.
In order to study the impacts of the transient seepage on the stability of tunnel excavation face during the installation of lining segments, the fluid-solid coupling effect based numerical model of the tunnel excavation face was developed by the finite element software PLAXIS. With adoption of the variablecontrolling approach, the influences of the depth/diameter ratio (the ratio of the buried depth to diameter of the tunnel) and the support pressure ratio (the ratio of the face support pressure to water and soil pressures ahead of the excavation face) on the face stability and ground settlement were investigated, respectively. At same time, the failure modes of the excavation face under the fluid-solid coupling analysis were also discussed. The results show that:1) the transient seepage leads to the development of the soil arching at the front of the excavation face, in which the smaller deformation at the excavation face is achieved, and so less support pressure for the face stability is allowed. While for the plastic analysis without taking into account the effect of transient seepage, a higher support pressure is required to maintain the stability of the excavation face; 2) in the fluid-solid coupling analysis, the depth/diameter ratio has less impacts on the stability of the excavation surface, but has larger impacts on the ground settlement. The larger the depth/diameter ratio, the larger the ground surface settlement and the settlement profile; 3) however, with the combination of the decrease of the support pressure and the impact of transient seepage on the settlement of ground surface, the soil arching effect in front of the excavation face is gradually reduced. The deformation zone at the ground surface is then connected with the deformed part ahead of the tunnel face to form a wedge-shaped soil sliding zone. It is also observed that the wedge-shaped body tends to have a larger funnel-shaped failure mode than that in the plastic analysis without considering the transient seepage. The results show that the transient seepage has a great impact on the stability of tunnel excavation face in the soil condition with high permeability ratio. The fluid-solid coupling analysis should be adopted to evaluate the deformation of excavation face and ground settlement. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

15.
In order to further evaluate the intelligent degree of the coal mining face scientifically and reasonably, this paper constructs a gray relational analysis based comprehensive evaluation model for the intelligent degree of mining face by deeply analyzing the influencing factors on the intelligent degree of mining face, such as surrounding rock detection, mining equipment, production system, supporting production system, organization and management, etc. By quantifying and scoring factors affecting the intelligence degree of mining face, using the hierarchical analysis method to obtain the weights and determine the correlations, the intelligence degrees of mining face are classified into four levels: excellent, good, medium and poor. Using the comprehensive evaluation model to empirically verify the 802 working face of Shaanxi Huangling Mining Co., Ltd., the calculated correlation is 0.765 8, which indicates that the intelligent degree of 802 working face is excellent according to the rating criteria, and it is consistent with the actual situation. Therefore, the comprehensive evaluation model based on gray relational analysis can accurately and objectively evaluate the intelligent degree of the mining face. © 2022, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

16.
《运输评论》2012,32(1):76-94
ABSTRACT

This paper looks at the economics of ridesourcing (or app-based ride-hailing) with a particular focus on the US. It brings together the rather dispersed literature on the subject focusing on the economic characteristics of the underlying industry and sets this within the broader context of transportation economics. In particular, it sorts out the realities of ridesourcing from some of myths that were perpetrated in its early days and, in many cases, still persist. It considers some of the empirical evidence that has emerged regarding the key parameters that determine the way Uber and the like operate, and the welfare implications of this, together with comments on some of the regulatory reactions to the new transportation platform. It concludes by suggesting some ways in which recent developments in economic could move forward our understanding of the industry as technologies and markets change.  相似文献   

17.
Based on the Sutong GIL utility tunnel project, which is constructed by the shield machine under the river, and as for the overloading problem at the river bank slope during operating period, the refined threedimensional finite element model was established to study the deformation and cracking characteristics of the tunnel segment structure under different forms of overloading. The evolution laws of section convergence, joint opening and structural stress were analyzed, and the structure damage mechanisms were revealed under conditions of large area loading and local loading. The surface-surcharge control standard was proposed. For the big diameter shield tunneling crossing the silty clay, the research results show that: (1) the deformation failure process is divided into three stages under large area loading condition, taking the design load and compressive yield of rebars inside haunch as the critical points respectively. The first stage is characterized by the elastic stress, the second stage is in plastic state with fracture, and the third stage is accelerating deformation and instability stage. The vertical convergence is 110.5 mm with no opening of joints when rebars are yielded; (2)the deformation failure process under local loading condition is also divided into elasticity, plasticity and instability stages, taking the design load and tensile yield of rebars outside haunch as the critical points respectively. The vertical convergence is 152.6 mm with joint opening of 4.36 mm; (3) the early-warning values of additional stress on the ground under conditions of large area loading and local loading are 110 kPa and 70 kPa respectively. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

18.
Catling  Ian 《Transportation》1990,17(3):285-299
This chapter discusses the potential for co-ordinating developments in Road Transport Informatics (RTI) in what could otherwise be a number of fragmented approaches, in order to approach what the DRIVE programme calls the Integrated Road Transport Environment (IRTE). The discussion is presented with particular reference to European developments such as the PROMETHEUS and DRIVE research programmes, but is intended to encompass possible progress towards worldwide standardisation.The role of consensus formation in Europe in the DRIVE projects SECFO and TARDIS is described. The importance of dynamic route guidance and of automatic debiting systems are highlighted in identifying the likely impetus towards the implementation of RTI systems. Finally, some outstanding issues are presented briefly, and the possible emergence of international standards leading to compatible systems worldwide is discussed.  相似文献   

19.
‘Unconventional modes’ (UCMs) of public transport have been emerging steadily and unobtrusively in the United Kingdom over the last two decades, largely originating in rural areas. Since 1977, there has been a quickening expansion of numbers and diversification of types in the light of governments' increasing concern with the cost of supporting ‘conventional’ public transport and the search for cheaper alternatives. An essential part of this review is to establish a definition of ‘unconventional’ as an aid to classifying the wide and increasing diversity of modes, and clarifying terminology. UCMs overlap with ‘community transport,’ which caters for the mobility needs of elderly and handicapped persons. In the context of bus service deregulation in 1985/6, the UCM sector is expected to expand although its precise future role is unclear.  相似文献   

20.
The evaluation of the stability of a tunnel’s primary support is a crucial component of ensuring the safety of subsequent construction. In light of the measured clearance displacements of the Wushishan Tunnel, the reliabili-ty of the primary support is evaluated dynamically and the design of the support structure is optimized. The research results show that full displacement and ultimate displacement are two main parameters for tunnel reliability analy-sis: the former can be obtained by positive and negative analysis, and the latter can be acquired by simulating a field measurement of displacement. It is not sufficient to apply the data specified in the code for railway tunnel design re-liability regarding determination of the reliability of a road tunnel structure using reliability theory, and it is neces-sary to use reliability theory to amend the standard of allowable empirical displacement in the Code of Road Tunnel Design. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号