首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到5条相似文献,搜索用时 0 毫秒
1.
A method for modeling air carrier departure delays at commercial‐service airports as autoregressive random processes is presented. This method employs the correlation of a priori demand data to significantly reduce prediction error in the optimal least‐squares estimator for additive white noise. The reduction factor of the prediction error is demonstrated to be on the order of 102 over that of the unbiased estimator. Copyright © 2011 John Wiley & Sons, Ltd.  相似文献   

2.
Hub‐and‐spoke networking is a key feature of current aviation markets in which hubs, as connecting points, function to consolidate and redistribute flows. This indicates that observation of traffic on a segment does not necessarily convey information about the origin to destination routing of passenger journeys because of the unavoidable detours in the system. This paper examines the heterogeneity of the flow composition in domestic and international US markets, which in turn allows us to observe the variation of operations across major hubs. A modified Route Flow Estimator for origin–destination synthesis (or origin–destination matrix estimation) is designed to decompose the segment traffic into itinerary‐based passenger trips. Several public and commercial databases, which are easily accessible, are exploited (and reconciled) for the model in order to (i) generate possible trip itineraries using those segment markets, and (ii) link data‐driven operational conditions with the underlying segment flows. The results are validated with US domestic trip observations and empirical knowledge related to the air transportation system. Then, the variability of the hub operations is examined based on sensitivity tests using the model parameters. From the resolution of itinerary‐based estimates, we observe that major airports' hub operations are spatially uneven, particularly with respect to domestic and international connecting passengers. Copyright © 2017 John Wiley & Sons, Ltd.  相似文献   

3.
This paper applies multi-criteria decision-making (MCDM) methods to the evaluation of solutions and alternatives for matching airport system airside (runway) capacity to demand. For such a purpose, ‘building a new runway’ is considered as the solution and candidate airports of the system as alternatives for implementing the solution. The alternative airports are characterized by their physical/spatial, operational, economic, environmental, and social performance represented by corresponding indicator systems which, after being defined and estimated under given operating scenarios, are used as evaluation attributes/criteria by the selected MCDM methods. Two MCDM methods – Simple Additive Weighting and Technique for Order of Preference by Similarity to Ideal Solution – are applied to the case of the London airport system to rank and select the preferred alternative from three candidate airports – Heathrow, Gatwick, and Stansted – for where a new runway could be built.  相似文献   

4.
This paper presents an integrated framework for effective coupling of a signal timing estimation model and dynamic traffic assignment (DTA) in feedback loops. There are many challenges in effectively integrating signal timing tools with DTA software systems, such as data availability, exchange format, and system coupling. In this research, a tight coupling between a DTA model with various queue‐based simulation models and a quick estimation method Excel‐based signal control tool is achieved and tested. The presented framework design offers an automated solution for providing realistic signal timing parameters and intersection movement capacity allocation, especially for future year scenarios. The framework was used to design an open‐source data hub for multi‐resolution modeling in analysis, modeling and simulation applications, in which a typical regional planning model can be quickly converted to microscopic traffic simulation and signal optimization models. The coupling design and feedback loops are first demonstrated on a simple network, and we examine the theoretically important questions on the number of iterations required for reaching stable solutions in feedback loops. As shown in our experiment, the current coupled application becomes stable after about 30 iterations, when the capacity and signal timing parameters can quickly converge, while DTA's route switching model predominately determines and typically requires more iterations to reach a stable condition. A real‐world work zone case study illustrates how this application can be used to assess impacts of road construction or traffic incident events that disrupt normal traffic operations and cause route switching on multiple analysis levels. Copyright © 2014 John Wiley & Sons, Ltd.  相似文献   

5.
This paper presents a probabilistic delay model for signalized intersections with right‐turn channelization lanes considering the possibility of blockage. Right‐turn channelization is used to improve the capacity and to reduce delay at busy intersections with a lot of right‐turns. However, under heavy traffic conditions the through vehicles will likely block the channelization entrance that accrues delay to right‐turn vehicles. If the right‐turn channelization gets blocked frequently, its advantage in reducing the intersection delay is neglected and as a result the channelization lane becomes inefficient and redundant. The Highway Capacity Manual (HCM) neglects the blockage effect, which may be a reason for low efficiency during peak hours. More importantly, using HCM or other standard traffic control methods without considering the blockage effects would lead to underestimation of the delay. To overcome this issue, the authors proposed delay models by taking into account both deterministic and random aspects of vehicles arrival patterns at signalized intersections. The proposed delay model was validated through VISSIM, a microscopic simulation model. The results showed that the proposed model is very precise and accurately estimates the delay. In addition, it was found that the length of short‐lane section and proportion of right‐turn and through traffic significantly influence the approach delay. For operational purposes, the authors provided a step‐by‐step delay calculation process and presented approach delay estimates for different sets of traffic volumes, signal settings, and short‐lane section lengths. The delay estimates would be useful in evaluating adequacy of the current lengths, identifying the options of extending the short‐lane section length, or changing signal timing to reduce the likelihood of blockage. Copyright © 2016 John Wiley & Sons, Ltd.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号