首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 46 毫秒
1.
The effect of damaged transverse connection of diaphragm beams on the bearing capacity of prefabricated concrete T?beam bridges was studied through model experiment and finite element analysis On the basis of standard drawing of 16 m T?beam bridge,a refabricated concrete T?beam bridge model on the scale of 1 to 4 was designed by using of welding steel plate The impacts of different condition on transverse load distribution were discussed The result shows that (1) flange connection has little impact on the transverse load distribution when the diaphragm beams are connected reliably; (2) the damage of transverse connections has much influence on the transverse load distribution of adjacent girders but it has little effect on the girders apart from them; (3) if a certain transverse connection is damaged entirely except for that of the end diaphragm beams,the load distribution would not degenerate to the conditions determined by the flange connection because of the advantageous effects of the other diaphragm beams; (4) only when the bilateral diaphragms of one beam are damaged at the same time,the lateral load distribution will degenerate to the conditions determined by the flange connection  相似文献   

2.
To cope with the fatigue cracking occurred to the asphalt mixture on steel deck avement,it is put forward that the fatigue life of asphalt mixture can be improved by reducing the ailure energy of each hysteresis loop of asphalt mixture according to the cumulative dissipated energy and hysteresis loop theory in the principle of viscoelasticity for asphalt mixture Based on this principle,a kind of modified asphalt with high elasticity was developed,and its high and low temperature performances and fatigue performances were also tested The result shows that (1) low temperature deformability of the high?elastic modified asphalt mixture has remarkably improved and low temperature bending strain of girder at -10 ℃ is above 10 000 με; (2) the fatigue life of modified asphalt mixture with high elasticity has greatly improved by 4?point bending beam test compared with common modified asphalt mixture The fatigue life at 1 000 με deformability is about 19 million times which is about 20 times longer than that of ordinary asphalt mixture  相似文献   

3.
In the light of semi?rigid material as base course for perpetual asphalt pavement,the bearing capacity and fatigue life of asphalt pavement with semi-rigid base cause and different asphalt layer's thickness were computed with BISAR30 after chosen typical pavement The impact of thickened layer on the stress of the semi?rigid base,the dry shrinkage and temperature shrinkages of the material were analyzed,and its adaptability as base for perpetual pavement was studied The result shows that (1) under the same load,with thickening of the asphalt layer,the compressive stress on the top and the tensile stress at the bottom of the semi?rigid base decrease obviously and the fatigue life of  the base increases substantially; (2)the impact of temperature and humidity on the  semi-rigid base is remarkably weakened,which leads to the fractures,erosion and reflecting cracks of the semi?rigid base to be controlled effectively  相似文献   

4.
he prestressed concrete skewed box girder with transversely segmental construction was brought out on the basis of the need in the engineering,both model experiments and FE analysis of the presented construction and the beam box with integral construction were carried out With the analysis of the obtained data by mathematical statistics,comparison of table and graph,and the corresponding FE analysis,the difference of mechanical performances of both constructions was analyzed under various experimental loading cases The results show that (1) the deflection of the presented construction is about 53% larger than that of the beam box with integral construction,the longitudinal strain is 135% larger than that of the latter,and the longitudinal strain of the cast concrete is 59% as large as that of the same area at the beam box with integral construction before concrete cracking; (2) there exists stress redistribution in the cross-section of presented construction,which can restrain the tensional distortion of the wet?joint,and the value of the stress cannot be computed by the current FE program  相似文献   

5.
Impacts on asphalt mixture's high temperature performance with PR series additives added by means of rutting test and Repeated Shear Test (Constant Height) (RSCH) were investigated The analytic results of the two tests show that (1) rutting test is not suitable for the high temperature performance evaluation of asphalt mixture with PR series additives added for the reason of the conflict between dynamic stability and rut depth; (2) the results of RSCH,such as K1,K2,N and γ,show very well consistency which is suitable  for the high temperature performance evaluation of asphalt mixture with PR series additives  added The results of RSCH show that asphalt mixture with PR PLAST S (PRS)  added has the best performance,the PR FLEX MODULE (PRM) one is the next and t he original one is the worst for the high temperature anti?shear performance  相似文献   

6.
Confronted with accidents in a shallow?buried weak tunnel using the bench excavation method,such as great subsidence and cracks in the ground surface as well as those in the preliminary support,a double downside drifts construction method was presented The drifts were used to detect geological conditions and reinforce the lower parts of the tunnel Its construction procedures and load transiting mechanism were then described Its Construction behavior was also studied by numerical simulation using software MIDAS The results show that (1) double-side drifts can improve tunnel load,the key construction step is arch ring excavation and core soil is good to keep tunnel steady; (2) weak parts mainly l ocate at wall foot of drifts,wall foot and crown foot of tunnel,and the connections; (3) reinforcement of soil under the drifts has no apparent effect on improving rock deformation and support load Advice on construction was proposed that main parts to be reinforced are drifts (its foot depth,connection parts with tunnel,and its corners) and core soil should be kept if rock is unsteady and needs reinforcing  相似文献   

7.
In order to assess temperature field in microwave heating for recycling asphalt pavements,a 2D mathematic heat transfer model was developed based on Fourier heat transfer theory The microwave internal heat?generation was researched by using surface field of pyramidal horn replacing approximate radiation field In addition,the boundary conditions were built and normalization processing was implemented The control volume based finite differential method (CV-BDM) was used to establish the implicit discrete scheme of the conservation equations,and the numerical value simulation was employed By continuous or intermittent  radiation heating technique,a microwave heating experimental system at 2 145 GHz was carried out to investigate temperature variation characteristics of asphalt pavements along with heating time The result shows that (1) the increase of temperature of asphalt mixture during microwave heating is obviously nonlinear,the temperature rises slowly in the initial stage of the heating but increases rapidly in the late heating period; (2) the temperature distribution is non-uniform that the temperature in central area of the surface is higher while it is lower on edge; (3) the uniformity of temperature within asphalt mixtures can be improved by using intermittent heating technique,and the heating time must be reasonable The simulation results are in preferable agreement with the experiment  相似文献   

8.
To analyze influencing factors and evaluation method of low-temperature performance of porous asphalt mixture,first,three kinds of modified binder were chosen as original,thin film aging and pressure aging samples for customary index test and bending beam rheometer (BBR) test at -12 ℃ to evaluate low-temperature performance of these modified binders Then,evaluation of the low-temperature anti?cracking performance of different kinds of porous asphalt mixture was made by thermal stress restrained sample test (TSRST) At the sam e time,the result of abovementioned TSRST were compared with the TSRST result of  samples of the porous asphalt mixtures after long?term aging to evaluate the influence of  aging on low-temperature performance of porous asphalt mixtures The results show that (1) TSRST result of porous asphalt mixtures coincides with creep stiffnesses of BBR test of modified binders; (2) the fracture temperatures of the porous asphalt mixtures increase and their fracture stresses decrease after aging; (3) the fracture stresses of porous asphalt mixtures are just one-third of those of dense?gradation asphalt mixtures while the fracture temperatures almost the same,which indicates that their low?temperature performances are almost the same  相似文献   

9.
Shenzhen Zhongshan River crossing Link is the first super integrated project in the world that consists of four different types of structures, i.e. ultra long and wide immersed tunnels, super large span sea crossing bridges, deep water artificial islands and undersea interchanges. The river crossing is designed for two way and 8 lane as per highway technical standards. Based on project characteristics and its technical difficulties, engineering solutions and the associated technology innovations have been listed as follows: (1) Proposed a design concept of standardization, industrialization, intelligence and project integration, and completed the study of overall design of Shenzhen Zhongshan River Crossing Link. An immersed tunnel with a combined steel shell and concrete composite structure is designed and the width of tunnel elements is from 46 to 55.5 m; Lingdingyang Bridge has been designed as a suspension bridge with a 1 666 m main span and two 270 m high main bridge towers. For West Island, a temporary enclosure caisson structure made of ultra large steel cylinders with a diameter of 28 m is designed to achieve a rapid artificial island formation. (2) Summarized the design and construction solutions related to combined steel shell and concrete structural immersed tunnel, the mix design, batching and concrete casting methods of high strength self compacting fluidized concrete, concrete quality check and inspection, design and construction of deep cement mixed (DCM) pile foundation for immersed tunnels, design and construction of large scale undersea dimensional transport interchange, flutter and wind stability design for super large span suspension bridge with monobox girders, and key techniques related to design and construction of offshore anchorage in deep sea. Furthermore, an equipment is developed and innovated for not only transport, also for installation of immersed tunnel elements to ensure the implementation of the project in an effective and economical way.  相似文献   

10.
Mori-Tanaka equivalent inclusion micromechanics theory was employed to investigate the viscoelasticity of asphalt mixture Asphalt mixture was regarded as composites which treated coarse aggregate as a rigid inclusion and the mixture of fine aggregate,filler and binder as viscoelastic matrix The constitutive relations of coarse aggregate inclusion and fine aggregate-filler-binder matrix were converted into elastic problems by Laplace transformation Then the Mori-Tanaka equivalent inclusion and average theory were used to deduce the  viscoelastic performance of asphalt mixture based on that of asphalt mortar in  Laplace space The result shows that (1) coarse aggregate inclusion can enhance the viscoelastic performance of fine aggregate?filler?binder matrix and viscoelastic constitutive relation of asphalt mixtures can be expressed as the product of an enhancement coefficient of coarse aggregate and the viscoelastic constitutive relation of fine aggregate?filler?binder matrix; (2) the viscoelasticity of the complex asphalt mixture can be predicted from the viscoelasticity of the homogeneous fine aggregate?filler?binder matrix by using the nhancement coefficient; (3) the enhancement coefficient is higher than 10 and it rises with increasing of coarse aggregates' volumetric fraction or Poisson's ratio of fine aggregate-filler-binder matrix but the effect of the former is more important than that of the latter  相似文献   

11.
According to the features of high?liquid?limit foundation in southwest mountainous area and the characteristics of geogrid reinforced cushion,geogrid reinforced cushion was used to reinforce high?liquid foundation By using the elastic?plastic finite element analysis method,the mechanisms of the geogrid reinforced cushion were studied The results show that geogrid reinforced cushion can greatly reduce loading and deformation and improve the high?liquid foundation stability In addition,the effect of factors such as location,lay ers,stiffness,etc of geogrids on reinforcement and the regularity were discussed Compari son of centrifugal model test result with numerical calculation result indicates that the error is negligible between them,which shows that (1) constitutive relationship,calculation model and calculation parameters are reasonable; (2) numerical simulation reflects deformation behavior of high?liquid foundation improvement effectively and the results of numerical analysis are re liable  相似文献   

12.
Four methods of erecting steel stiffening truss girder of suspension bridge,including the deck lifting gantry crane method,the cable-mounted crane method,the cantilever erection method with derrick crane and the incremental launching method,were studied Based on construction conditions of the bridge,according to the optimal combination of various factors such as construction safety,quality,period,environmental protection and economic performance,etc,the cantilever erection method with derrick crane was recommended for the bridge. On this basis,three categories of connection in cantilever erection methods,including the all hinged method,the successive fully splicing method and the successive splicing with temporary erection hinge method,were studied The successive splicing with temporary erection hinge method was recommended in the bridge with consideration of the requirements of construction safety,quality and time limit In addition,the traction method of hangers at the top end during cantilever erection was studied Finally,the erection method of three key  stages,including the first segment near the pylon,the standard segment,as well as the closure segment of steel stiffening truss girde,r was studied. The cantilever erection method with derrick crane provides a new way for design and construction of long-span suspension bridge with steel stiffening truss girder in the western area of China  相似文献   

13.
Stresses of pavement with flexible base of LSAM-30,ATPB-30 and AC-30I at the most adverse point under the function of traffic load and temperature load as well as the coupling of them were calculated and compared by finite element method. The result indicates that flexible bases of LSAM?30 and ATPB?30 are more effective in the prevention of reflection crack Because of the great volume of coarse aggregate and large maximum nominal particle?size,the LSAM-30 thermal conductivity is greater,and the temperature shrinking coefficient is lower as well as the modulus of resilience,which could reduce the emperature gradient among the structure layers effectively and then minish the thermal stress At the  same time,the adequate flexibility performance of the LSAM may also absorb strain energy at the crack of the semi?rigid subbase sufficiently As a result,itpresented preferable reflection crack resistance A case study was conducted to do comparative analysis of anti?cracking performance of LSAM-30,ATPB-30 and AC-30I flexible bases A long?term follow?up observation of test roads with the three bases shows that the pavement with LSMA base is in good condition and no sign of crack found while pavements with ATPB?30 and AC?30I flexible bases have varying degrees of crack LSMA flexible base has an obvious performance of anti-crack  相似文献   

14.
Aiming to solve the problems of collaborative management of intelligent tunnel and tunnel management under different traffic conditions, the tunnel is regarded as a part of highway, and five features of the intelligence are proposed from the definition of intelligence. In order to realize a collaborative management of intelligent highway tunnel, the spatial extent of tunnel is defined at first. Then, a collaborative management road topology based on road critical nodes is proposed; and a holographic collaborative control information system based on tunnel structure, facilities, vehicle, operation, management, and environment is established. Finally, collaborative control of people, cars, roads and environment could be realized, so as to improve the management level of the intelligent highway tunnels.  相似文献   

15.
LI Jiangao  WANG Changhong 《隧道建设》2019,39(10):1678-1689
The project under study is an overlapping twisted shield bored tunnels in weak water rich strata. The purpose of the study is to solve the key technological problems in the construction of the project. The optimal construction sequence of the overlapping twisted shield tunnels is determined according to the engineering geological conditions, the surrounding working environment, and theoretical analysis on the spatial relationship of the four tunnels, and verification control are carried out via monitoring means. The tunnel construction is properly timed, smart self propelled movable support jumbo is adopted, and grouting reinforcement technology is used to ensure the construction safety of the overlapping twisted shield bored tunnels. The grouting pre reinforcement technology and the clay shock technology are adopted to ensure the safety of the surrounding buildings. The technologies for the construction of the overlapping twisted shield bored tunnels described in this paper is of great significance for the construction of similar overlapping tunnels with high shield launching/receiving risks and crossing under important structures with small clearance.  相似文献   

16.
SUN Jun 《隧道建设》2018,38(10):1592-1602
The author explains why a giant undersea immersed tube tunnel was selected for the sea area of the main channel of the east side of the Hong Kong Zhuhai Macao Fixed Link Project, instead of employing a bridge or shield tunnel; and summarizes several domestic and international leading innovative technologies applied in the island tunnel construction of the Hong Kong Zhuhai Macao Fixed Link Project, including the use of huge self stabilized steel cylinders as retaining structure of foundation pits for constructing the artificial islands, the large area and ultra deep "sand compaction pile (SCP) composite foundation" reinforcement technology, "semi rigid segment joints", "sandwich" steel RC combined inverted trapezoid closure joints, and crack control and anti corrosion/durability design for RC tube structure. All these technologies reflect Chinese wisdom and Chinese speed. The author also points out some technical issues to which attention should be paid after the immersed tube tunnel of the project is put into operation: (1) Will the post construction settlement and differential settlement of the immersed tube tunnel further develop after the project is open to traffic? How much is the final convergence value? If it exceeds the limit, what control measures should be taken?(2) How to deal with the issue that the joints of large/small elements or segments are open? How to ensure that all the large and small joints between segments of the tube are "watertight"? Furthermore, the author presents some suggestions and control measures: (1) For excessive post construction settlement (especially differential settlement) spotted on large joints, it is suggested to incorporate "micro disturbance grouting" for post treatment. (2) If a joint opens under the excessive positive bending moment at the floor slab, it is believed that the open joint on the floor slab can be closed again by cutting off some prestressed tendons in the roof slab of the segment to reduce the positive bending moment of the section.  相似文献   

17.
The large scale diversion tunnel of Baihetan Hydropower Station has complex geological conditions, thus various problems of rock mechanics appeared during the process of excavation. Typical damage and fracture mechanics are analyzed in depth, including the collapse along weak rock joint, stress controlled spalling, failure modes of fractured rock mass, relaxation damage of fractured rock columnar joints, localized stress affected by structural surfaces and stress controlled problems of superior fracture combinations. Engineering countermeasures are also summarised, which includes supporting measures, construction methods, supporting time, and monitoring and feedback methods for different types of failure. Through these measures, rock mechanics problems are successfully solved. Stability control of the surrounding rock of underground caverns under complicated geological conditions are achieved, ensuring successful completion of the enormous diversion tunnel of Baihetan.   相似文献   

18.
Seven tunnels across Jinping Mountain are arranged for Jinping Ⅱ Hydropower Station, with a total length of about 120 km. Among them, four headrace tunnels have a length of 16.67 km, an excavated diameter of 12.4-14.6 m, and a cover depth of 1 500-2 000 m in general. The maximum cover depth is 2 525 m, and the maximum external water pressure is more than 10 MPa. The tunnels are featured by great length, great depth and large diameter. It is the largest and most difficult among the underground tunnel groups built or under construction in China and even the world. With complex hydrogeological conditions and special topographical conditions along the tunnels, many challenging problems, such as rock burst under high in situ stresses, groundwater inrush in karst strata and failure of loading bearing structure, were encountered during construction. A great amount of groundbreaking studies were carried out regarding these problems. The key technical problems during construction of extremely large and deep tunnels were solved successfully. Safe and rapid tunnel construction and stable operation were achieved. The hydropower station started operation in 2014 and has been in a safe and stable operation state. The successful construction of headrace tunnels of Jinping Ⅱ Hydropower Station can provide some experiences and reference for deep tunnel projects in the world.  相似文献   

19.
Two major concerns have been drawn in the process of shield construction: one is the difficulty in selecting a shield machine; the other is the high risk of opening for cutterhead changing. Based on the existing shield systems, a parallel dual mode shield with freezing cutterhead is developed by optimising internal structure and equipment and carrying the freezing device. The dual mode shield construction technology and freezing cutterhead technology are successfully carried out on project cases including Guangzhou Metro Line 9, Guangzhou Metro Line 21 and 220 kV Shijing Huanxi Electric Tunnel (Xiwan Road Shisha Road Section). The parallel dual mode slurry/EPB shield not only has the functions and advantages of slurry shield and EPB shield but also can switch into slurry/EPB mode for different strata and environments easily. Thus, it can achieve rapid shield tunneling. By combining the shield with the freezing system, the soil around cutterhead can be frozen to provide conditions for chamber opening under atmospheric condition. Meanwhile, it is also compatible with dual mode shield.  相似文献   

20.
宋媛 《中国电动车》2007,(7):174-175
Harry Potter booksare great successes, enjoyed by readers' all over the world. Harry Potter and the Philosopher's Stone is the debut of the sequel books, which is about magic and the magical life a little boy-Harry Potter, a born wizard. People are always curious and eager to discover the secrets of magic, to meet the end of the heroes' fates, but not many of them pay attention to the book's language. Actually, I think it is the skillful use and application of language that make the book outstanding. Therefore, this paper mainly discussesthe language features of Harry Potter and Philosopher's Stone from these four as-pects: speech sounds, choice of vocabulary, sentence structures and figures of speech, aiming at exploring and revealing the charmsof the magic book.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号