首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
More than 9 million passengers take Shanghai’s subway system every work day. The system’s air quality has caused widespread concern because of the potential harm to passengers’ health. We measured the particulate matter (PM) concentrations at three kinds of typical underground platform (side-type, island-type, and stacked-type platforms) and inside the trains in Shanghai’s metro during 7 days of measurements in April and July 2015. Our results demonstrated that the patterns of air quality variation and PM concentrations were similar at the side-type and island-type platforms. We also found that the PM concentrations were higher on the platforms than inside the train and that the PM concentrations in the subway system were positively correlated with those in the ambient air. Piston wind generated by vehicle motion pushes air from the tunnel to the platform, so platform PM concentrations increase when trains approach the platform. However, the piston wind effect varies greatly between locations on the platform. In general, the effect of the piston wind is weaker at the middle of the platform than at both ends. PM concentrations inside the train increase after the doors open, during which time dirty platform air floods into the compartments. PM1.0 and PM2.5 were significantly correlated both inside the train and on the platforms. PM1.0 accounted for 71.9% of PM2.5 inside the train, which is higher than the corresponding platform values. Based on these results, we propose some practical suggestions to minimize air pollution damage to passengers and staff from the subway system.  相似文献   

2.
Although people are often encouraged to use public transportation, the riding experience is not always comfortable. This study uses service items to measure passenger anxieties by applying a conceptual model based on the railway passenger service chain perspective. Passenger anxieties associated with train travel are measured using a modern psychometric method, the Rasch model. This study surveys 412 train passengers. Analytical results indicate that the following service items cause passenger anxiety during trains travel: crowding, delays, accessibility to a railway station, searching for the right train on a platform, and transferring trains. Empirical results obtained using the Rasch approach can be used to derive an effective strategy to reduce train passenger anxiety. This empirical study also demonstrates that anxiety differs based on passenger sex, age, riding frequency, and trip type. This information will also prove useful for transportation planners and policy-makers when considering the special travel needs of certain groups to create a user-friendly railway travel environment that promotes public use.  相似文献   

3.
If railway companies ask for station capacity numbers, their underlying question is in fact one about the platformability of extra trains. Train platformability depends not only on the infrastructure, buffer times, and the desired departure and arrival times of the trains, but also on route durations, which depend on train speeds and lengths, as well as on conflicts between routes at any given time. We consider all these factors in this paper. We assume a current train set and a future one, where the second is based on the expected traffic increase through the station considered. The platforming problem is about assigning a platform to each train, together with suitable in- and out-routes. Route choices lead to different route durations and imply different in-route-begin and out-route-end times. Our module platforms the maximum possible weighted sum of trains in the current and future train set. The resulting number of trains can be seen as the realistic capacity consumption of the schedule. Our goal function allows for current trains to be preferably allocated to their current platforms.Our module is able to deal with real stations and train sets in a few seconds and has been fully integrated by Infrabel, the Belgian Infrastructure Management Company, in their application called Ocapi, which is now used to platform existing and projected train sets and to determine the capacity consumption.  相似文献   

4.
We report tunnel measurements, where abrasion particles from different types of trains are measured in two situations and emission factors are calculated from these. The measurements show significantly elevated particle concentrations in train passages that last for about a minute and are accompanied by increased airflow. The emission of particles for each train passage was obtained by summing the product of the particle concentration and the airflow and then multiplying with the tunnel area. The average emission factors were calculated for three categories freight trains, commuter trains and regional trains and found to be 2.9 g/train-km (0.7 – 9), 0.48 (0.1 – 1.6) and 0.24 (0.05–0.9), respectively. The number in brackets refers to the range of values observed. The size-resolved data showed maxima around 1 μm for all three train types.  相似文献   

5.
This paper proposes a mathematical model for the train routing and timetabling problem that allows a train to occasionally switch to the opposite track when it is not occupied, which we define it as switchable scheduling rule. The layouts of stations are taken into account in the proposed mathematical model to avoid head-on and rear-end collisions in stations. In this paper, train timetable could be scheduled by three different scheduling rules, i.e., no switchable scheduling rule (No-SSR) which allows trains switching track neither at stations and segments, incomplete switchable scheduling rule (In-SSR) which allows trains switching track at stations but not at segments, and complete switchable scheduling rule (Co-SSR) which allows trains switching track both at stations and segments. Numerical experiments are carried out on a small-scale railway corridor and a large-scale railway corridor based on Beijing–Shanghai high-speed railway (HSR) corridor respectively. The results of case studies indicate that Co-SSR outperforms the other two scheduling rules. It is also found that the proposed model can improve train operational efficiency.  相似文献   

6.
In this study, real-time monitoring campaigns were conducted in two tunnels (Line A and Line B) at a subway station in Shanghai, including temperature, relative humidity, PM1, PM2.5 and PM10, in order to understand the climate and PM characteristics in the transportation microenvironment. In addition, collected floor dust particles in the tunnel were analyzed by ICP for their metal elemental composition. Strong correlations occurred between all PM levels and meteorological parameters in the tunnel of Line A (with platform screen doors), in comparison with the weak correlations between such parameters in the tunnel of Line B (without platform screen doors). PM2.5 and PM10 between peak hours and off-peak hours for both lines presented significant differences (p < 0.05), respectively. Nevertheless, PM1 showed a different pattern, with p > 0.05 for Line A and p < 0.05 for Line B, respectively. In addition, statistical results concluded that PM had an evident weekly variation for both lines. Friday was the highest day of all particulate matters in monitoring periods for both lines. Ratios of PM1/PM10 and PM2.5/PM10 were high when trains were out of service and low when trains were in service. Relative abundance of metal elements detected from floor dust particles proved that floor dust particles in tunnels might be a major source of airborne PM in the subway microenvironments, with Fe as the most abundant metal element, followed by Ca, Al, Mg, Mn, Zn, Cu, Cr, Ni, Pb and Hg.  相似文献   

7.
目前我国高速铁路的日间行车能力已得到了较为充分的利用,而如何组织好高铁夜间垂直天窗与夜行列车之间的耦合关系、用好高铁夜间能力,是适应多样化市场需求的需要,也是进一步提升高铁经营效益的有效途径。对此,本文提出了动卧列车和货运动车组两种相对可行的高铁夜间运输产品,分别对其产品特征进行了分析,充分考虑高铁夜间天窗制约下两种列车的开行模式,基于市场需求提出了列车开行策略,并在充分对比两种产品的经济效益、客(货)源组织、能力分配等因素的基础上,给出了高铁夜间能力发展建议。  相似文献   

8.
The train standing-time at a station is a determinant of the line capacity and the necessary fleet-size. Its determination is usually based on the assumption that boarding and alighting is uniform at all doors of a train. Uniform boarding and alighting is conceivable if passengers distribute themselves uniformly on station platforms while waiting for trains. The validity of the uniformity assumptions is tested using data from two stations (one CBD, one suburban) of the Calgary, Alberta LRT system. It is shown that passenger distribution on the platform, alighting and boarding is not uniform and is closely related to the location of platform access points. Some strategies that will encourage uniformity are discussed. However, procedures that can estimate the standing time for non-uniform boarding and alighting need to be developed.  相似文献   

9.
Modelling route choice behaviour in multi-modal transport networks   总被引:1,自引:0,他引:1  
The paper presents new findings on the influence of multi-modal trip attributes on the quality and competitiveness of inter-urban multi-modal train alternatives. The analysis covers the entire trip from origin to destination, including access and egress legs to and from the train network. The focus is on preferences for different feeder modes, railway station types and train service types as well as on the relative influence of time elements and transfer penalties. Data from dedicated surveys are used including individual objective choice sets of 235 multi-modal homebound trips in which train is the main transport mode. The observed trips have origins and destinations within the Rotterdam–Dordrecht region in The Netherlands with an average total trip time of 50 minutes. Hierarchical Nested Logit models are estimated to take account of unobserved similarities between alternatives at the home-end and the activity-end of the trip respectively, resulting in two-level nesting structures which differentiate between intercity (IC) and non-intercity railway station types at the upper level and between transit and private access modes at the lower level. In order to reflect the multi-dimensional structure of the data a more advanced so-called Multi-Nested GEV model according to the Principles of Differentiation has been estimated which significantly improves the explanatory power and stresses the importance of the home-end of the multi-modal trip.  相似文献   

10.
Safe and reliable coupling and decoupling of cars from a moving train is feasible with further developments in linear motor propulsion and control of transit vehicles. This allows the last car of a train to decouple and stop at a station for a relative long dwell time, before it accelerates and is coupled to a following train. Controlled doors in front and rear of the transit vehicle permit passengers to walk through the train to the car which stops at their destination. A proposed transit system using these features is described and compared to Bombardier's Advanced Rapid Transit. Potential advantages are high schedule speed, uncrowded trains, smaller and more stations, low energy requirements and a smaller vehicle fleet.  相似文献   

11.
We address the problem of simultaneously scheduling trains and planning preventive maintenance time slots (PMTSs) on a general railway network. Based on network cumulative flow variables, a novel integrated mixed-integer linear programming (MILP) model is proposed to simultaneously optimize train routes, orders and passing times at each station, as well as work-time of preventive maintenance tasks (PMTSs). In order to provide an easy decomposition mechanism, the limited capacity of complex tracks is modelled as side constraints and a PMTS is modelled as a virtual train. A Lagrangian relaxation solution framework is proposed, in which the difficult track capacity constraints are relaxed, to decompose the original complex integrated train scheduling and PMTSs planning problem into a sequence of single train-based sub-problems. For each sub-problem, a standard label correcting algorithm is employed for finding the time-dependent least cost path on a time-space network. The resulting dual solutions can be transformed to feasible solutions through priority rules. Numerical experiments are conducted on a small artificial network and a real-world network adapted from a Chinese railway network, to evaluate the effectiveness and computational efficiency of the integrated optimization model and the proposed Lagrangian relaxation solution framework. The benefits of simultaneously scheduling trains and planning PMTSs are demonstrated, compared with a commonly-used sequential scheduling method.  相似文献   

12.
This paper deals with the real-time problem of scheduling and routing trains in a railway network. In the related literature, this problem is usually solved starting from a subset of routing alternatives and computing the near-optimal solution of the simplified routing problem. We study how to select the best subset of routing alternatives for each train among all possible alternatives. The real-time train routing selection problem is formulated as an integer linear programming formulation and solved via an algorithm inspired by the ant colonies’ behavior. The real-time railway traffic management problem takes as input the best subset of routing alternatives and is solved as a mixed-integer linear program. The proposed methodology is tested on two practical case studies of the French railway infrastructure: the Lille terminal station area and the Rouen line. The computational experiments are based on several practical disturbed scenarios. Our methodology allows the improvement of the state of the art in terms of the minimization of train consecutive delays. The improvement is around 22% for the Rouen instances and around 56% for the Lille instances.  相似文献   

13.
This article discusses approaches to the determination of railway capacity and the significance of the following factors on capacity: mix of trains, length and weight of trains, direction of train travel, acceleration and deceleration, stopping protocols of trains, location and length of crossing loops, location of signals, length of sections, dwell times and sectional running times. A more accurate method to calculate railway capacity is developed using previously unaddressed aspects for capacity determination. Capacity and pricing are two key issues for organizations involved with open track access regimes. A train access charging methodology is therefore developed and incorporated into a railway capacity determination model.  相似文献   

14.
In case of railway disruptions, traffic controllers are responsible for dealing with disrupted traffic and reduce the negative impact for the rest of the network. In case of a complete blockage when no train can use an entire track, a common practice is to short-turn trains. Trains approaching the blockage cannot proceed according to their original plans and have to short-turn at a station close to the disruption on both sides. This paper presents a Mixed Integer Linear Program that computes the optimal station and times for short-turning the affected train services during the three phases of a disruption. The proposed solution approach takes into account the interaction of the traffic between both sides of the blockage before and after the disruption. The model is applied to a busy corridor of the Dutch railway network. The computation time meets the real-time solution requirement. The case study gives insight into the importance of the disruption period in computing the optimal solution. It is concluded that different optimal short-turning solutions may exist depending on the start time of the disruption and the disruption length. For periodic timetables, the optimal short-turning choices repeat due to the periodicity of the timetable. In addition, it is observed that a minor extension of the disruption length may result in less delay propagation at the cost of more cancellations.  相似文献   

15.
The most natural and popular dispatching rule for double-track segments is to dedicate one track for trains traveling in one direction. However, sometimes passenger trains have to share some portions of the railway with freight trains and passenger trains are traveling faster and faster nowadays. The major drawback of this dedicated rule is that a fast train can be caught behind a slow train and experience significant knock-on delay. In this paper, we propose a switchable dispatching policy for a double-track segment. The new dispatching rule enables the fast train to pass the slow train by using the track traveled by trains in the opposite direction if the track is empty. We use queueing theory techniques to derive the delay functions of this policy. The numerical experiments show that a switchable policy can reduce the fast train knock-on delay by as high as 30% compared to a dedicated policy. When there are crossovers at the middle of the double-track segment, our proposed switchable policy can reduce the delay of the fast trains by as high as 65%.  相似文献   

16.
Level 3 of the ERTMS/ETCS improves the capacity of railways by replacing fixed-block signalling, which prevents a train to enter a block occupied by another train, with moving block signalling, which allows a train to proceed as long as it receives radio messages ensuring that the track ahead is clear of other trains. If messages are lost, a train must stop for safety reasons within a given deadline, even though the track ahead is clear, making the availability of the communication link crucial for successful operation.We combine analytic evaluation of failures due to burst noise and connection losses with numerical solution of a non-Markovian model representing also failures due to handovers between radio stations. In so doing, we show that handovers experienced by a pair of chasing trains periodically affect the availability of the radio link, making behavior of the overall communication system recurrent over the hyper-period of periodic message releases and periodic arrivals at cell borders. As a notable aspect, non-Markovian transient analysis within two hyper-periods is sufficient to derive an upper bound on the first-passage time distribution to an emergency brake, permitting to achieve a trade-off between railway throughput and stop probability. A sensitivity analysis is performed with respect to train speed and headway distance, permitting to gain insight into the consequences of system-level design choices.  相似文献   

17.
This paper investigates the coordinated cruise control strategy for multiple high-speed trains’ movement. The motion of an ordered set of high-speed trains running on a railway line is modeled by a multi-agent system, in which each train communicates with its neighboring trains to adjust its speed. By using the potential fields and LaSalles invariance principle, we design a new coordinated cruise control strategy for each train based on the neighboring trains’ information, under which each train can track the desired speed, and the headway distances between any two neighboring trains are stabilized in a safety range. Numerical examples are given to illustrate the effectiveness of the proposed methods.  相似文献   

18.
A key factor in determining the performance of a railway system is the speed profile of the trains within the network. There can be significant variation in this speed profile for identical trains on identical routes, depending on how the train is driven. A better understanding and control of speed profiles can therefore offer significant potential for improvements in the performance of railway systems. This paper develops a model to allow the variability of real-life driving profiles of railway vehicles to be quantitatively described and predicted, in order to better account for the effects on the speed profile of the train and hence the performance of the railway network as a whole. The model is validated against data from the Tyne and Wear Metro, and replicates the measured data to a good degree of accuracy.  相似文献   

19.
随着集装箱物流的发展,部分既有铁路要改造为双层集装箱运输通道,然而既有铁路的隧道限界大多为隧限-2,不能满足双层集装箱运输隧道建筑限界。文章通过对限界、接触网悬挂方式及隧道处理措施等方面的研究,提出了隧限-2B隧道通行双层集装箱列车是可行的结论。  相似文献   

20.
This paper examines some key aspects of a charging system for promoting railway transport, including charges reflecting a clear relationship with costs (transparency) and charges reflecting the quality of the infrastructure manager's service. Train running charges recover track-related costs and can help to develop a charging system that meets these requirements. To orient train running charges to the market, a method for processing track maintenance and renewal costs is proposed whereby the quality of the service provided by an infrastructure is measured according to its utility to the railway undertaking. To achieve transparency, a single indicator is used for cost planning and the subsequent levying of costs on railway undertakings. The paper includes an example of how proposed train running charges would be calculated according to data from 14 European countries. The example shows that short-distance trains generate the lowest maintenance and renewal costs, followed by long-distance trains and freight trains.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号