首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
The impacts of the already decided increase in rail infrastructure charges in Sweden are described for various market segments within the rail transport system and on the aggregate level for society as a whole. The need for complementary measures in the road transport system is also discussed. Likewise, the paper also mentions the impact of increased rail infrastructure charges on certain significant industrial sectors. An increase in rail charges may reduce social welfare even though the reduction in rail transport mileage is small. This is mainly due to large non-internalised absolute externalities for road freight. For commuter trains, the infrastructure charges' share of the costs of rail transport is expected to rise to 13 percent, which in an international perspective still will be small.  相似文献   

2.
The significant effects of competition, franchising and vertical separation of rail infrastructure from train operation on the level of transaction costs are often anecdotally described in the literature. Although it has been shown that franchising has an effect on total costs, there is very little empirical evidence on whether franchising has an impact on the level of transaction costs over time. One reason for this is, of course, the limited systematic work on the measurement of transaction costs in railways. This paper builds on recent work that applied a top-down approach to transaction cost measurement to identify the size of the transaction sector within rail firms in different EU countries. In cross-country comparison particularly, British train operators turned out to be associated with high levels of transaction costs. However, since the previous work focused on a single fiscal year it did not show any longitudinal effects within one institutional environment or country. Therefore, this paper focuses on British franchised passenger train operating firms and aims to reveal how the transaction sector within those firms has changed over the period 1996/1997-2007/2008 and whether the franchise contract details, such as contract length or the franchising regime, matter. It also aims to estimate the resulting changes in the level of transaction costs and their share in total operating costs for the first time.  相似文献   

3.
Britain's national rail system was ‘privatised’ as a result of the 1993 Railways Act, with most of the organisational and ownership changes implemented by 1997. This paper examines the long term impacts of these changes. A key issue when examining long term changes is that of the counterfactual – what would have happened if the changes had not occurred? A simple econometric model of the demand for passenger rail services was developed and used in conjunction with extrapolative methods for key variables such as fares and train km to determine demand-side counterfactuals. Extrapolative methods were also used to determine counterfactual infrastructure and train operation costs. Although our results are sensitive to the assumptions we have made concerning the counterfactual they suggest a number of impacts. Since privatisation, rail demand has grown strongly but our analysis indicates that transitional disruptions suppressed demand by around 9% over a prolonged period (1992/3 to 2005/6), whilst the Hatfield accident reduced demand by about 5%, albeit over a shorter period (2000/1 to 2006/7). A welfare analysis suggests that although consumers seem to have gained as a result of privatisation, for most years this has been offset by increases in costs. An exception is provided by the two years immediately before the Hatfield accident. Overall the loss in welfare since the reforms were introduced far exceeds the net receipts from the sale of rail businesses. Thus although the reforms have had advantages in terms of lower fares and better service levels than otherwise would have been the case, this appears to have been offset by increased infrastructure and train operations costs. The source of these high costs remains an area of speculation but appear to be related to aspects of both market and regulatory failure.  相似文献   

4.
It is about 20 years since the rail reform process in Europe began with the separation of infrastructure from operations in Sweden. This paper reviews the entire process, examining the objectives of reform, the different models adopted, and the key elements of separation of infrastructure from operations, competition both through open access and franchising and regulation and infrastructure charging. It is concluded that separation of infrastructure from operations involves costs, but is the most effective way of achieving within mode competition. Where operations do not greatly overlap and open access passenger and freight are unimportant, leasing infrastructure to passenger franchisees may be effective, but the model of vertical integration as separate subsidiaries within a holding company structure makes it difficult to ensure a level playing field for new entrants and is only effective where the vertically integrated operator remains dominant.  相似文献   

5.
Transportation sector, including maritime transport, exerts significant environmental impact. Public procurement as a policy strategy instrument which applies to the purchase of transport means, construction of infrastructure and the provision logistic services in supplying the goods, services and executing of works must integrate environmental considerations in the contract award procedures. While conventional life-cycle costing (LCC) is based on four categories to be assessed e.g. investment, operation, maintenance and end-of-life disposal expenses, the environmental LCC method also takes into account the external environmental costs. The paper is focused on sustainable public procurement and environmental life-cycle costing aspects of EU 2014 Directive. Analysis is made of the real cost of procurement, the externalities and the impact of maritime transport sector on the environment. The purpose of this research is to propose the framework for assessment of integral impact on the environment which combines environmental LCC approach with TBL concept using non-monetary units for measuring externalities. The authors advocate clean and energy-efficient maritime transport ensuring effective implementation of environmental policy objectives and targets and emphasize the role of public authorities and entities in fostering the inclusion of environmental externalities in calculation of LCC.  相似文献   

6.
This paper presents an overview of the principles and technologies relating to railway infrastructure. Specifically this paper includes rail–wheel contact, inspection and maintenance of rail. Intelligent transport systems (ITS) and their applications for the purposes of the railway transport in Europe are discussed. The potential, levels of development, technological and operational characteristics of the European Railway Traffic Management System (ERTMS) are presented. Finally, a discussion on methodologies, principles and current practices for access charging in Europe is provided.  相似文献   

7.
A model to compare three alternative forms of public transport - light rail, heavy rail and bus rapid transit - is developed for an urban network with radial lines emanating from the borders to the city centre. The theoretical framework assumes an operation aimed at minimising the total cost associated with public transport service provision, which encompasses both operator and users costs. The decision variables are the number of lines (network density) and the frequency per period for each mode. This approach has no prejudices a priori in respect of whether a specified delivery scenario is aligned with existing modal reputation. Rather, we establish the conditions under which a specific transit mode should be preferred to another in terms of the operator (supply) and user (demand) side offerings. The model is applied using data from Australian cities, suggesting that in most of the scenarios analysed a high standard bus service is the most cost-effective mode, because it provides lower operator costs (infrastructure, rolling stock and operating cost), access time costs (due to a larger number of lines) and waiting time cost (due to larger frequencies of operation). A rail mode, such as light rail or heavy rail, may have a lower total cost only if it is able to run faster than bus rapid transit, and the difference in speed is enough to outweigh the bus advantage on operator cost and access and waiting times.  相似文献   

8.
Abstract

The National Park Service is required by law to conserve nationally significant resources for public benefit. Susceptibility to local short‐term economic pressures and a lack of understanding of resource dynamics can jeopardize mandate compliance. Assateague National Seashore is an example of a dynamic barrier island where early understanding of ecologic factors should have preceded its establishment and must precede its management and development. Research conducted on a similar system has demonstrated the dramatic environmental impacts and high maintenance costs associated with an inappropriate recreation management scheme. Alternatives are available which minimize resource degradation and maintenance costs without restricting visitation. To better ensure incorporation of long‐run ecologic and economic criteria into the decision‐making process, a proposal is put forward which recognizes the need for an expanded research effort and close adherence to early planning steps.  相似文献   

9.
Whilst the emphasis of European Union rail legislation to date has been on freight, measures such as separation of infrastructure from operations, infrastructure charging regimes and regulation have major implications for the passenger sector. But implementation of these measures in many countries has been inadequate. Crucial to overcoming these problems is the establishment of strong independent regulators in all member states. There is currently no requirement for competition in the passenger sector except for international services, but there is experience both of open access for commercial services and of competitive franchising. However, even where permitted open access competition has been very limited and there is evidence that undesirable cream skimming may be a problem. Experience of franchising has generally been positive, but in some cases it has failed to drive down costs. It is concluded that a combination of more sensible risk sharing, a determination not to renegotiate, longer franchises and limited open access competition where justified by benefits is likely to be the best way forward.  相似文献   

10.
Recent transport sector liberalisation, as well as global economic crisis, is favouring the implementation of transport infrastructure projects through Public–Private Partnerships (PPP). However, there is a debate as to whether PPP schemes are a better option than conventional procurement. To this end, an evaluation framework is proposed, to assess which of these two alternative schemes for transport projects financing is preferable for the public. The proposed framework is complimentary to the Value for Money (VfM) approach and is based on a Multi Criteria Analysis (MCA). The first step is the estimation of the Public Sector Comparator (PSC) for the case of conventional procurement, dealing with construction, maintenance and operation costs revenues, as well as any costs associated with risks undertaken by the public. As for the PPP case, it includes any payments by the public sector and related risks costs. The MCA is then applied only if the PPP is found preferable for the public sector. The latter considers additional impacts, including among others the social attributes of a particular scheme, job creation, environmental impacts and safety and security aspects. The proposed framework was applied to a pilot Bus Rapid Transit (BRT) corridor infrastructure project in the city of Indore, India, in order to demonstrate its validity. The framework and its application could provide useful guidance when considering PPP for a transport project, since it demonstrates in a transparent way the society's attitude towards this project, something that is critical to its acceptance.  相似文献   

11.
This paper examines the effect of transportation (road and rail) infrastructure on economic growth in India over the period 1970–2010. Using Vector Error Correction Model (VECM), the paper finds bidirectional causality between road transportation and economic growth. It also finds bidirectional causality between road transportation and capital formation, bidirectional causality between gross domestic capital formation and economic growth, unidirectional causality from rail transportation to economic growth and unidirectional causality from rail transportation to gross capital formation. The paper suggests that expansion of transport infrastructure (both road and rail) along with gross capital formation will lead to substantial growth of the Indian economy. Therefore, within its stated scope, this study suggests that a suitable transport policy should be retained to boost transportation infrastructure and hence sustainable economic growth in India.  相似文献   

12.
In this paper, an approach for integrating the data obtained from structural health monitoring (SHM) in the life-cycle performance assessment of ship structures under uncertainty is presented. Life-cycle performance of the ship structure is quantified in terms of the reliability with respect to first and ultimate failures and the system redundancy. The performance assessment of the structure is enhanced by incorporating prior design code-based knowledge and information obtained by SHM using Bayesian updating concepts. Advanced modeling techniques are used for the hull strength computations needed for the life-cycle performance analysis. SHM data obtained by testing a scaled model of a Joint High-speed Sealift Ship is used to update its life-cycle performance.  相似文献   

13.
This paper provides an up-to-date review of the previous literature concerning the impact of passenger rail franchising on productivity and costs in Britain, and also presents important new evidence. In particular, the extension in time of previously-used datasets offers the first opportunity to study the impacts of re-franchising. The previous literature emphasised the failure of franchising to produce sustained productivity gains, with a sharp deterioration in productivity after 2000. The new evidence presented offers a somewhat more positive view of the British experience. It suggests that part of what was previously considered to be falling productivity may in fact be due to exogenous changes in diesel prices. Further, new data suggests that the recent increases in costs have resulted in higher quality of service. Finally, competitive re-franchising, and the associated unwinding of short-term management and re-negotiated contracts, seems to have led to improvements in productivity between 2006 and 2008. Nevertheless, it remains the case that passenger rail franchising in Britain has failed to reduce costs in the way experienced in many other industries and in rail in other European countries. The evidence is that somewhat larger franchises, avoiding overlapping and optimising train density and length, should reduce costs. We also speculate that the major increase in wages and conditions of staff might be moderated by longer franchises, although that remains to be proved. This re-appraisal of the British case is important in the context of the wider international interest in the use of franchising in passenger rail, and its relevance to the current review of ways of introducing competition into the domestic rail passenger market in Europe.  相似文献   

14.
The first railway package is being recast by the legislative bodies of the European Union. One point of departure in this paper is how Swedish agencies treat issues concerning marginal cost based charges, financing charges and allocation of scarce capacity and it discusses these issues from a welfare point of view, partly by use of theoretical modelling. It is seen here that the Swedish infrastructure manager (the Swedish Transport Administration) so far has no method for calculation of marginal costs as a base for charging, especially for costs of scarce capacity, and that the infrastructure manager is applying or discussing various methods for allocations of scarce track capacity. The EU-recast gives no guidance on principles for calculation of charges for scarce capacity, so we recommend the Swedish Transport Administration to develop such charges. The Administration seems to ignore important externalities that should be taken into consideration from a welfare point of view, with respect both to efficient charging and to allocation of scarce capacity. The analytical modelling part of the paper aims to derive these charges in principle, taking these externalities into account. If financing charges exceeding social marginal costs are applied, the model shows how to minimise the welfare loss of these increases. It also shows that financing charges should primarily be applied to market segments that cause large external costs from the operation of the train, where its customers have low valuation of wait time and delay time, where customers of other segments have high valuations of delay and where increased profits for other operators are induced.  相似文献   

15.
This paper studies the external costs of surface freight transport in Spain and finds that a reduction occurred over the past15 years. The analysis yields two conclusions: trucks have experienced a reduction in external costs, and rail has lower externalities. The external costs of road freight transport decrease between 1993 and 2007 (44%). The external costs of rail freight increase by 12%. During this period, the external costs of road freight related to climate increase by 16%, oppositely than those from air pollution and accidents (51 and 44%). The external costs of rail related to pollutant emissions and climate increase by 4% and 43%. Oppositely, the external costs related to accidents decrease by 27%. Road freight generates eight times the external costs of rail, 2.35 Euro cents per tonne kilometre in 2005 (5.6% accidents, 74.7% air pollution and 19.7% climate) vs. 0.28 (13.4% accidents, 53.9% air pollution and 32.7% climate).  相似文献   

16.
Despite the many socio-economic similarities between Sweden and Norway, differences in jurisdiction, organisation, cooperation, and financing of long-distance passenger train and coach services have led to the development of four distinctively different ways of serving the markets. This paper describes how the train and coach markets have developed in the two countries, with emphasis on regulatory and industrial structure and a couple of performance variables.Looking at passenger rail, both countries separated infrastructure from operation over a decade ago. However, while Norwegian rail is characterised by an almost monopoly supplier, rail services in Sweden are partly decentralised to the responsibility of county authorities and are widely subjected to competitive tendering. The rest of the network is about to be opened up for on-the-track competition. Swedish Rail (SJ) has spent the last decades consolidating its core business (passenger rail) and sold out its other businesses. In contrast, the Norwegian state rail (NSB) has expanded its business to become a major bus operator and property owner, with extensions also into the Swedish market.The coach industry was more recently deregulated in both countries. The Swedish coach market is dominated by privately owned companies operating services to and from Stockholm. In Norway, state-owned NSB is a major coach operator on medium distance routes, and is also the largest partner of Nor-Way Bussekspress which totally dominates long-distance coach services. Further, the Norwegian coach market is characterised by cross-ownership and cooperation which has enabled an extensive route network which covers most of Norway.We find distinct differences in achievements in the two modes and in the two countries. Swedish rail services have succeeded in winning market shares and in renewing and developing both infrastructure and service levels to a greater extent than the Norwegian model. On the other hand, the Norwegian coach market seems to be more developed and efficient compared to its Swedish counterpart.The paper concludes with a discussion on the possible links between the different approaches and the performance observed, with the aim to stimulate further and more detailed research on some important issues.  相似文献   

17.
船体结构腐蚀模型对检测及维修规划的影响   总被引:1,自引:0,他引:1  
提出了基于风险的船体结构腐蚀优化检测及维修的基本理论框架.最优的检测及维修,是在保证结构在设计工作寿命内的可靠指标大于最低可靠指标的基础上,使结构生命周期内总的期望费用最小.建立了检测、维修及失效事件的安全余量方程,推导了失效及维修概率的计算公式.在此基础上,以船体结构两种常用的腐蚀模型Paik模型和Guedes Soares模型为例,分析了两种模型对最优检测及维修策略的影响.其结果表明,腐蚀模型对最优的检测及维修次数和时间有明显的影响,但是对总的期望费用及失效概率影响不大,而且两种腐蚀模型得出的最优失效概率都是10-3.  相似文献   

18.
PPP contracts most often have durations of between 20 and 35 years, but in some cases even longer. The main reason for this is the wish of the Public side to minimize its financial contribution, by including in the contract many years of revenue generation by the project to help cover the investment contribution of the private partner. Implicit however is the need to fully amortize the initial investment, which in many countries is even included in the relevant legislation.PPP contracts are normally framed around the delivery of a range of services during the lifetime of the contract, those services requiring the initial construction or recovery of an expensive infrastructure. The specification of the financial clauses of the contract requires the estimation of demand for those services over the period of the contract and this is usually taken as the major incidence of uncertainty in the contract. Indeed, experience shows that demand forecasts often fail substantially, in many cases by more than 20%, mostly by excess, as State side project promoters (and the bidding private partners) tend to be excessively optimistic about the development of such demand.But when we consider the nature of these contracts we should recognize the existence of at least two other very important types of uncertainty: first, the socially desirable scope and specification of the services to be offered as technology and social preferences evolve; and second, the policy guidelines relative to the total quantity and the social distribution of those services, as that quantity may be causing congestion in other parts of the system, or it may become important to (positively or negatively) discriminate some user segments.In both cases, it is almost impossible to foresee at the time of writing the initial contract if, when and in what direction such types of socially beneficial changes in the provision of the services would intervene, but this rigidness may bear a great loss of social welfare in relation to a more adjustable framework. This criticism affects not only PPPs but all kinds of concession contracts with long duration, so it is not the “partnership” element that must be questioned but rather the duration of the contract.An alternative way is relatively straightforward: abandon the assumption that these contracts must provide full amortization of the infrastructure, which allows adoption of contracts with a shorter life, and the use of multiple such contracts over the lifecycle of the infrastructure.The first generation contract would still have to face the full cost of the construction, but the private partner would receive the unamortized part at the end of that contract, to be paid by the State, directly from the public budget if no more private participation is wanted, or indirectly through the acquisition fee for the contract to be paid by the partner to the second life segment. But, crucially, the State recovers the right to re-specify the terms of the service to be provided without the need for any indemnity, and also the uncertainty associated with the evolution of demand in that period will be much smaller, as this will be my then a mature system in operation.This may seem to increase the transaction costs for the State as more contracts (although of a similar type, especially from the second onwards) may have to be negotiated and signed. But if we take into consideration the difficulties of the frequently needed renegotiations of long duration contracts and the conditions of asymmetry of information in which the State normally finds itself in such cases, we will conclude that, besides avoiding the loss of welfare due to the poor fit of the contract after 20 years or so, this solution after all may also reduce the transaction costs associated with negotiations over the duration of the traditional contracts.  相似文献   

19.
传统沉箱重力式码头施工中,护舷位置在胸墙上,安装方便,施工简单;后轨道梁座于沉箱上,前后轨道梁不存在沉降差异;轨道连接以闪光对焊为主,施工效率低、质量受焊工的焊接水平影响较大;面层裂缝是码头施工中的常见质量通病,直接影响码头表观质量。以锦州港第二港池集装箱码头二期工程为例,对低高程重力式码头护舷口、沉箱背后回填棱体(后轨道梁基础)夯实、钢轨连接及胸墙面层防裂施工工艺进行了优化调整,取得良好的效果。  相似文献   

20.
泰国曼谷机场快线,全线以高架车站为主,桥上采用支撑块式无砟轨道结构。为避免简支梁与车站横梁变形不一致对轨道结构造成破坏,通过结构受力分析,设计采用一种桥接轨道板结构实现了轨道结构的连续铺设。并且说明在无砟轨道结构高度受限条件下,桥接轨道板采用钢筋混凝土结构是可行的。  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号