首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
The district modified stiffness method (DMSM) considers the effect of joints and hand holes on the stiff-ness of the lining ring, assuming the stiffness around the joint and hand hole is to be reduced and the stiffness else-where is not changed. Considering the stiffness reduction of the lining ring caused by the segment’s circumferential joint, the internal force of the lining structure, the ground surface settlement and the displacement response of the surrounding soil body induced by shield driving are analyzed by an HS small strain constitutive model, and a 3D FEM model is established to analyze the interactions among the tunnel, soil body and building to apply to the dou-ble-line running tunnel of Shanghai Metro Line 11, which crosses under a historic building. In contrast, a 3D numeri-cal model based on the routine method (RMM) is set up and a comparison with the site measured data is conducted,with results indicating that they agree very well. The simulation results show that the existing building not only changes the surface settlement trough but also largely reduces horizontal displacement at the corresponding measuring points of the settlement trough; the distortion values of the existing building are related to the positions of the tunnel face and the location of the building; and the final distortion doesn’t decrease after completion of tunnel construction, but major residual distortion remains. This simulation method provides a reference for the control of disturbances during shield construction in soft rock. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

2.
The earth pressure acting on a shield tunnel is intrinsically related to synchronous grouting, the position of the shield machines, the rigidity of the segment and stratum, etc. Existing theoretical formulas and empirical methods couldn′t exactly reflect the actual state of the segment of a shield tunnel during construction due to the com⁃plexities mentioned above. Based on earth pressure data measured at 52 monitoring sections in 35 tunnels, the distri⁃bution laws and influential factors are analyzed. The results show that: 1) the earth pressure scope is 0 to 400 kPa for over 90% of the total samples, but is recommended to be 0.3 to 0.4 MPa for the empirical grouting pressure; 2)the earth pressure on the segment and the buried depth approximately have an exponential relationship, with the dif⁃ference between the max. earth pressure and the stable earth pressure decreasing with an increase of the buried depth; 3) the lateral pressure coefficient range is 0.5 to 2.3, which is partially out of the scope of recommended values(0.5 to 1.0) of surrounding rock of grade Ⅵ, so it is not appropriate to follow the recommended values in the specifi⁃cation; 4) the relationship of the earth pressure and the segment/soil stiffness ratio presents a quadratic function, and the most reasonable value for the stiffness ratio of the segment/soil is 1.0; and 5) there are four typical stages of the spatial distribution of earth pressure on a segment in clay stratum—the erection stage, the grouting influence stage,the consolidation contraction stage and the recovery stage, with the distribution of the circumferential earth pressure being asymmetrical. The distribution curves of the earth and water pressure in sand and soil layers are classified as a“weak decay pulse fluctuation”and“double hump,”respectively. After stabilizing, the circumferential earth pressure is notably in a symmetrical distribution, and the water pressure exhibits a light bulb shaped distribution (large at the lower part and small at the upper part). These conclusions provide a reference for studying the mechanism of earth pressure functions and perfecting the design of segments for shield tunnelling. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

3.
The large settlements of tracks will emerge due to multiple disturbances in the construction of over- lapped shield tunnels, which affects the running safety of trains. Based on the overlapped Sungang station-Honghu station shield running tunnels of Shenzhen Metro line 7 passing underneath 26 tracks of high speed railways, a rein- forcement technology system consisting of”track support + subgrade reinforcement + interlayer soil consolidation + internal support of the lower tunnel”was developed. The settlements of tracks were mainly monitored automatically with manual monitoring as an auxiliary one. The results show that the maximum settlement of main track caused by constructing overlapped shield tunnels is -5.9 mm which is less than the control value of 10 mm, ensuring the opera- tion safety and verifying the reliability and practicability of the reinforcement technology system. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

4.
Waterseepageofakarsttunnelsectioninsoilsurroundingrockispronetosurfacesubsidence.Considering the settlement caused by descending of water level due to water leakage, a method of surface settlement estimation under steady seepage of phreatic water was proposed. Based on the seepage and consolidation theory, the changes of dead-weight and seepage effective stress of soil unit in surrounding rock was analyzed in condition of water seepage, and the settlement zone of surrounding rock was divided by taking the funnel curve of precipitation as the boundary line. A two-dimension plane was established based on the excavation cross section and the estimation formula for surface settlement due to seepage effect was deduced by means of double integral. On the basis of Yaozhai tunnel of Liuzhai-Hechi Expressway in Guangxi Zhuang Autonomous Region, the surface settlement of soil surrounding sec⁃ tion was predicted by field measurement and formula estimation respectively. Facts and figures show that the mea⁃ sured values are mainly consistent with the estimation ones, while the measured values are larger than the estima⁃ tion ones within the scope 3 m away from the excavation face along the horizontal radial direction. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

5.
Based on an introduction to the construction and application of the early warning control platform for the tunnel and subway engineering, an overall analysis of the related data during tunnel and subway construction was conducted in order to give a better reference for the site construction, to guarantee safe and rapid qualified construc⁃tion, and to improve management efficiency. Based on red line control, deformation thresholds of surrounding rock, allowances of construction material and advanced geological prediction, a dual early warning system with automatic trigging and manual prejudging was adopted to control the quality of tunnels and subways and to guarantee safe con⁃ struction; through the platform a centralized management is realized, all the construction information and effective data are transmitted instantaneously by internet, decreasing management cost and increasing work efficiency. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

6.
Zhang M.  Zhang Z.  Chen F. 《现代隧道技术》2018,(6):197-203and209
A variety of construction problems, such as bad cutting effects of cutters, unreasonable boring parame- ters and blowout, are often encountered during shield tunnelling under unfavorable geological conditions. Aimed at these construction difficulties of high pressure, abundant underground water, fractured rock stratum, long distance and small-radius curves of Fuzhou metro, the mechanical behaviors of cutting tools were analyzed through theoreti- cal calculations of cutter cutting force, then the reasonable cutter configuration, tunneling parameters and the proper time for cutter replacement were presented. Some measures, such as screw conveyor renovation, mucking control and lowering of groundwater, were adopted for controlling blowout based on practice. The stability of excavation face was analyzed by numerical simulation, and the measures for shield boring and posture control in the long distance and small radius curved tunnels were summarized. The conclusions are as follows: 1) when shield machine is driven in fractured stratum, the effect of lateral impact force produced by spalling rock on cutter will be very large and rein- forcement is needed for cutter; 2) cutter replacement should be taken at proper time based on muck samples in con- ditions of increasing of total shield thrust by 4 000-7 000 kN, cutter torque by 1 000-1 500 kN•m and driving speed smaller than 10 mm/min; 3) adopting screw conveyor device with innovative anti-blowout devices and control measures for ground precipitation and mucking, it controls blowout effectively; 4) the maximum axis offset and the height offset of segment meet the requirements of shield construction specifications during shield construction of long distance small-radius curved tunnel. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

7.
The strata of Chengershan tunnel is mainly consist of the slightly cemented tertiary sandstone, the tun⁃ nel body passes through F 2 fault core zone. Geological disasters of mud outburst, sand gushing and extrusion of work face occurred several times during tunnel construction, so the risks are very high. In view of the core zone of F 2 fault with high pressure and abundant water, a variety of construction schemes were compared and analyzed in terms of technology, feasibility and safety, and vertical freezing technique was used for stratum reinforcement in the railway tunnel for the first time, furthermore the freezing scheme and tunnel support measures were studied, providing refer⁃ ence and guidance for similar tunnel construction.Mountain railway tunnel; Fault zone; Tertiary sandstone; Vertical freezing technique; Application © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

8.
The limit states of railway tunnel portal structure including compression, tensile, anti-overturning, antisliding and bearing capacity of foundation should be considered when portal structure is designed based on the prob⁃ ability limit state method. In order to evaluate the reliability of portal structure, the reliability index and limit state of bearing capacities of different limit states need to be calculated. The traditional methods generally use hand compu⁃ tation combined with MATTLAB, ANSYS, EXCEL and other softwares, which has low computation efficiency and poor practicality. In view of above problems, a calculating software for portal structure was developed based on the probability limit state method and Visual Basic platform, which realizes the function of rapid calculation of reliabili⁃ ty index and limit state of bearing capacities under five limit states of portal structure, offers three methods to calcu⁃ late the reliability index including JC method, fractile method and Monte-Carlo method. Moreover, the calculation results can be written in the EXCEL template file, greatly improving the efficiency of tunnel portal structure calcula⁃ tion. The accuracy of the software is verified by comparing with the results of hand calculation. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

9.
It's really challenging for shield driving when hard rock partially intrudes into the excavation section of metro tunnels. Abnormal cutter wear is excessive during shield excavation in hard rock and comprehensive perfor⁃ mance of excavation system decreases greatly, resulting in abnormal advancing parameter, small penetration rate and low advance rate. Taking Shenzhen Metro line 9 project as the background, the main difficulties encountered for the compound EPB shield during driving in high-strength granite and the reasons were analyzed, the corresponding countermeasures were presented. EPB shield drove through the hard rock section safely and smoothly attributed to reasonable cutter configuration, in-time cutter replacement and proper advancing parameters. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

10.
Jacking force is the most important parameter in jacking pipe engineering, and reasonable calculation of jacking forces plays an important role in safe and smooth pipe jacking construction. There are many calculation methods for pipe jacking force at present, and the calculation results may be affected to some extent by different cal⁃ culation methods. For this reason, calculation methods of jacking force (frictional resistance) were collected and a comparative analysis was conducted with aspects to the advantages, disadvantages and applicabilities. The results show that as for the jacking force calculated by empirical formulae, the soil layer classifications corresponding to giv⁃ en frictional force per unit area and relevant factors to be considered are different, and the values of frictional force per unit area between pipe and soil in the same soil layer are also different; as for the jacking force calculated by theo⁃ retical formulae, the calculation methods for vertical earth pressure at crown are different and much effected by the pipe buried depth; as for the jacking force calculated by numerical simulation, the selected theories for the simula⁃ tion program and the construction factors to be considered during simulation are different. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

11.
Yu T.  Li J.  Jing L.  Xu S.  Xu J. 《现代隧道技术》2018,(6):33-41and52
The problems of TBM construction data loss, information barriers and absence of data mining have con⁃ strained the advancement of basic technologies in TBM field. Aimed at building a cloud computation platform for TBM operation information, a new concept of 3B, i. e. Born by digit, Born in format and Born to the cloud, was pre⁃ sented, the issues of information acquisition, transmission and storage during TBM operation were solved, and massive heterogeneous information intelligent transmission system and big data warehouse of TBM group were established. A structure model of cloud computation platform was designed by taking Hadoop system as ecosphere, and a cloud computation platform was built to deploy related algorithm, realizing on-line monitoring and data sharing, further⁃ more the data law mining of interaction of rock mass versus TBM machine was conducted based on big data tech⁃ nique, exploring the development direction of the information platform. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

12.
The Olympic Park Station crossing the existing Datun-Road tunnel covers a long distance and closely approaches an existing metro tunnel. Initially, the PBA construction method was adopted with eight pilot tunnels. In light of the tunnel group cavern effect and the surrounding soft silty clay with abundant water, the construction risks were very. Optimization of the metro station construction scheme was conducted, and the four pilot tunnels at the downside were cancelled and replaced with long drill hole grouting piles. Construction technology for a large-diame-ter pile for a bored pilot tunnel was adopted based on the engineering characters of the PBA method using four pilot tunnels. Monitoring on the Datunlu tunnel structure was performed during metro station construction and the results indicate that the construction scheme for the station’s main structure was rational; the new construction technology ensures construction safety for the existing tunnel and metro structure. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

13.
Improvements of management mode and application level of informationization techniques are the key factors to safe and efficient construction of the high-speed railway tunnels considering the complexity and diversity of construction techniques, unpredictable risk factors and varied geological conditions. In the paper it proposed a management mode for lean construction of high-speed railway tunnels, studied the in-depth integration and applica⁃ tion of key technologies of BIM, advance geological prediction, tunnel surrounding rock measurement, 3D laser scan⁃ ning, etc. in the lean construction management of high-speed railway tunnels, and developed the light portal APP and cloud-based information management system. Through the verification of practical engineering application, it re⁃ alized good monitoring of key risk resources in tunnel construction, redline control for key tasks and effective manage⁃ ment of safety and quality, increased efficiency of collaborative operation of all parties involved and reached the goal of lean construction and management. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

14.
Falling-off of rock piece at tunnel arch and invert heave are the main potential safety problems affecting normal operation of the railway tunnel. The reasons causing falling-off of rock piece include squeezing by lining trol⁃ ley at construction joint, concrete cutting by cantilever end of water stop at construction joint, construction cold joint at arch, concrete quality deficiency and so on. To eliminate the falling-off of rock piece at tunnel arch caused by rig⁃ id overlap, modification of lining trolley and the flexible overlap technique combining tray with rubber gasket were adopted during the construction of Nuwashan tunnel on China-Laos railway, and the potential quality problem due to rigid overlap at construction joint of tunnel lining were effectively solved. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

15.
The evaluation of the stability of a tunnel’s primary support is a crucial component of ensuring the safety of subsequent construction. In light of the measured clearance displacements of the Wushishan Tunnel, the reliabili-ty of the primary support is evaluated dynamically and the design of the support structure is optimized. The research results show that full displacement and ultimate displacement are two main parameters for tunnel reliability analy-sis: the former can be obtained by positive and negative analysis, and the latter can be acquired by simulating a field measurement of displacement. It is not sufficient to apply the data specified in the code for railway tunnel design re-liability regarding determination of the reliability of a road tunnel structure using reliability theory, and it is neces-sary to use reliability theory to amend the standard of allowable empirical displacement in the Code of Road Tunnel Design. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

16.
The new Badaling tunnel is the longest tunnel on the under-construction Beijing-Zhangjiakou highspeedrailway, with the Badaling Great Wall station to be built in the tunnel. This station, which is under the Badaling Great Wall historic site, is the world’s largest underground high-speed railway station with the most complicated structure and the largest overburden and excavation area. It is therefore a representative project for China’s highspeed railway development strategy, supporting infrastructure facilities for the Beijing Horticultural Expo 2019 and the 2022 Winter Olympics in Beijing, and it is important that it be of high quality and completed safely. In the de-sign and construction of the station, the glyphs of the Chinese characters of "中",”国”,”人”and”品”are used, re-spectively, along the station route, in the rescue and evacuation mode, auxiliary adit and partial excavation, which is a way to successfully integrate the art of Chinese characters into tunnel engineering. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

17.
Light distribution (LD) and installation style of luminaires affect the utilization factor (UF) of luminaires, and the UF affects the luminaire power and road pavement illuminance and further the power consumption of illu- minating system and the luminous effect of road pavement. An UF model of tunnel lighting was established based on the luminaire LD data and installation parameters, in which four LD styles were adopted. For each LD the parame- ters optimization and simulation were conducted regarding four installation styles, e.g. central style, offset-of-vault style, symmetric style and staggered style. The energy-saving and the lighting effects of each LD and luminaire in- stallation style at the tunnel middle zone were studied. The results show that symmetric luminaire installation is the most energy-saving style and has the best lighting effect than the other three luminaire installation styles; the lighting effect of central luminaire installation is the second best; staggered luminaire installation is the most energy-intensive style and has the worst lighting effect except for some special-shaped LD; waterdrop-shaped LD is the most suitable one along transverse direction of tunnel and applicable to the central, offset-of-vault and symmetric luminaire instal- lation styles; symmetric butterfly-shaped LD is the most suitable one along longitudinal direction of tunnel and appli- cable to the central, offset-of-vault, staggered and symmetric luminaire installation styles; with waterdrop-shaped LD along transverse direction and symmetric butterfly-shaped LD along longitudinal direction, they are suitable for the above four luminaire installation styles, and have better energy-saving and lighting effect; as for the LD with symmetric and oblique curve, it’s better for the profile of oblique luminaire distribution to be comply with that along tunnel transverse direction, and it is suitable for the symmetric and offset-of-vault luminaire installation styles. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

18.
In a perspective of modern tunnelling philosophy, some problems on conventional tunnelling in soft rock mass were discussed. The development process of rock mechanical behavior and deformation caused by excava⁃ tion is attributed to the change course from yielding to discrete. Some effective control means were presented as well and the effect of advanced support system was evaluated. As to the deformation controlling technology for squeezing ground, the theory and design principle of yielding support system were introduced. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

19.
A scheme for stopping water by freezing liquid nitrogen and replacing the tail brush is presented in light of the situation encountered at the Nanjing Weisanlu river-crossing tunnel, a long-distance shield driving tunnel characterized by serious water leakage, sand gushing and water inflow at the shield tail brush. The law of the tempera-ture change of the master outlet circuits and each branch circuit when using liquid nitrogen freezing to stop water un-der high water pressures and the temperature change law for the soil body at different depths are analyzed. The re-sults show that: the temperature difference of the liquid nitrogen is large at the inlet and outlet of the freezing pipe,and it reaches around 35℃ after 6 days; the temperature drops fastest in the pebble layer, and the second fastest in the gravel sand layer, with the temperature cooling slowest in the silty fine sand layer; the average velocities at the frontal surface of the frozen soil in the pebble layer, gravel sand layer and silty fine sand layer are 15.5 cm/d, 12.5 cm/d and 8.3 cm/d, respectively, within the range 600 mm away from the frozen pipe; and affected by heat and air convection in the tunnel, the temperature at the junction of the segment and soil is higher than that in the soil layer.A complete frozen wall takes shape after 13 days of liquid nitrogen freezing, and tail brush replacement takes 22 days from freezing. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

20.
Gong C.  Luo Y.  Zhang J. 《现代隧道技术》2018,(6):210-216and221
Defects of tunnel lining, such as inadequate thickness, voids, cracks, rock falling and water leakage etc., endanger the safety of railway tunnel operation. Based on the site construction, an analysis of the reasons for lining defects was conducted; technical measures against lining defects were proposed and tests were carried out at site. The results show that these measures are reliable and effective, and the purposes of prevention and treatment are re⁃ alized. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号