首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
The shield tunnel is an ultra-long linear space. It will cause a lot of dust during the tunnel maintenance and overhaul operation, which is extremely unfavorable to the physical and mental health of the construction personnel and the environment outside the tunnel. It is difficult to guarantee the ventilation effect of the linear space using the conventional dust removal technology, which directly affects the construction safety and overhaul period. Therefore, based on the overhaul of a cross-river tunnel in Shanghai, combined with Computational Fluid Dynamics (CFD) simulation, device optimization and process combination, a three-stage dust reduction standardization process for tunnel overhaul construction is proposed, namely taking a water sprayer at the working point to control the dust at the source (primary protection); installing electrostatic dust removal and water filtration dust removal equipment in the tunnel(secondary protection); and installing two sets of water curtain spray device at the two tunnel exits to prevent dusts from diffusing into the atmosphere. It explores the actual dust-reducing effects of different dust-removing measures and layout combinations, laying a technical foundation for green and efficient dust reduction. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

2.
Based on a shield-driven running tunnel project of Hangzhou Metro Line 2, this paper carries out field measuring of the ground surface deformation caused by two different shield machines in double-tube tunnelling in soft soil areas, obtains the laws of the surface deformation caused by shield-driven double-tube tunnelling and verifies the applicability of the modified Peck formula to double-tube tunnelling. The results show that in soft soil areas the impacts on ground surface deformation caused by different shield construction parameters in the previously and subsequently excavated tunnels are different, while the surface deformation changes sharply before and after the shield machine passing through the cutting face, and a rebound phenomenon occurs when the shield tail passes through the cutting face due to the influence of the grouting; The cutterhead torque of the shield machine in soft soil areas can be composed of five calculation factors, and the calculation results are in good agreement with the measured values. The larger the opening rate of the shield cutterhead is, the larger the average torque value will be, the higher the percentage of large ground loss rate will be, and the larger the maximum ground surface settlement will be; The ratio of cutterhead torque T to mucking volume per ring Q is used as the control parameter for analyzing the ground surface settlement, and a certain positive correlation between the ratio and the surface settlement value is determined, the smaller the cutterhead opening rate is, the more accurate the fitting results will be. © 2022, Editorial Office of Modern Tunnelling Technology. All right reserved.  相似文献   

3.
In a perspective of modern tunnelling philosophy, some problems on conventional tunnelling in soft rock mass were discussed. The development process of rock mechanical behavior and deformation caused by excava⁃ tion is attributed to the change course from yielding to discrete. Some effective control means were presented as well and the effect of advanced support system was evaluated. As to the deformation controlling technology for squeezing ground, the theory and design principle of yielding support system were introduced. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

4.
After 1975, the appearance of finite element numerical limit method and the application and development of computer technology have brought the elastic-plastic analytical calculation of engineering materials into a new era of numerical limit calculation. The new methods, namely, strength reduction method and load increment method, as well as the recently proposed ultimate strain method, are adopted in the rock tunnels studied in this paper. To solve the uncertainty of mechanical parameters of surrounding rock in rock tunnels and provide more scientific and reasonable mechanical parameters of surrounding rock, the surrounding rock classification must be made combining theory, investigation and experience. Taking the surrounding rock classification in rail transit tunnels as an example, the improvement of the classification level includes improving the strength index, mainly adopting the quantitative classification method, reasonably determining the basic index BQ value of rock mass quality, increasing the number of surrounding rock classifications, formulating the surrounding rock classification tables for the running tunnel and the station tunnel, and achieving the coordination and unification of qualitative and quantitative classification methods. Finally, the quantitative indexes of surrounding rock self-stability are determined, and the more scientific and reasonable physical and mechanical parameters of surrounding rocks are put forward through back calculation. © 2022, Editorial Office of Modern Tunnelling Technology. All right reserved.  相似文献   

5.
Combining the present situation and development trend of different tunnel support technologies at home and abroad, this paper analyzes the problems of rockburst in hard rock tunnels and large deformation in soft rock tunnels caused by high ground stress. It is concluded that: 1) regarding the rockburst problem, the current support technology is mainly influenced by the rock burst mechanism which is dominated by static factors, and so the used support components are generally of smaller deformation performance and "passive support" properties; 2) as the rockburst is the result of dynamic-static stress coupling, and only the anchor bolt has the "active support" attribute in the current "shotcrete+anchor bolt+wire net" support system, so the best support system should have the two functions of active support and energy release in terms of the rockburst problem, and the key focus of the research and development is anchorage members; 3) there are three main support types for large deformation in soft rock tunnels, e.g. the heavy support, layered support and yielding support. Among them, the heavy support system in underground cavern with large deformation is easy to induce excessive surrounding rock pressure, and so the applicable conditions are limited. The layered support system is still not the best choice due to its immature theoretical study, difficult determination of the thickness value and the installation time of each support layer and the interference to construction progress. With the characteristics of timely support and yielding while supporting, the yielding support system can give full play to the performance values of surrounding rocks and supporting materials, and make both of them reach the optimal state, so it is the best choice for supporting the soft rock tunnels with large deformations. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

6.
In order to study the impacts of the transient seepage on the stability of tunnel excavation face during the installation of lining segments, the fluid-solid coupling effect based numerical model of the tunnel excavation face was developed by the finite element software PLAXIS. With adoption of the variablecontrolling approach, the influences of the depth/diameter ratio (the ratio of the buried depth to diameter of the tunnel) and the support pressure ratio (the ratio of the face support pressure to water and soil pressures ahead of the excavation face) on the face stability and ground settlement were investigated, respectively. At same time, the failure modes of the excavation face under the fluid-solid coupling analysis were also discussed. The results show that:1) the transient seepage leads to the development of the soil arching at the front of the excavation face, in which the smaller deformation at the excavation face is achieved, and so less support pressure for the face stability is allowed. While for the plastic analysis without taking into account the effect of transient seepage, a higher support pressure is required to maintain the stability of the excavation face; 2) in the fluid-solid coupling analysis, the depth/diameter ratio has less impacts on the stability of the excavation surface, but has larger impacts on the ground settlement. The larger the depth/diameter ratio, the larger the ground surface settlement and the settlement profile; 3) however, with the combination of the decrease of the support pressure and the impact of transient seepage on the settlement of ground surface, the soil arching effect in front of the excavation face is gradually reduced. The deformation zone at the ground surface is then connected with the deformed part ahead of the tunnel face to form a wedge-shaped soil sliding zone. It is also observed that the wedge-shaped body tends to have a larger funnel-shaped failure mode than that in the plastic analysis without considering the transient seepage. The results show that the transient seepage has a great impact on the stability of tunnel excavation face in the soil condition with high permeability ratio. The fluid-solid coupling analysis should be adopted to evaluate the deformation of excavation face and ground settlement. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

7.
Deep-buried water-storage and drainage shield tunnels, which are different from road and subway shield tunnels in terms of computation theory, construction technology and operation maintenance, would bear high inner water pressure and large earth pressure. In view of the change of the bearing mode for the lining structure of water-storage and drainage shield tunnels, a full-ring test and numerical analysis are carried out to study the influence of inner water pressure, staggered joint assembly and bolt installation types on the behaviors of water-storage and drainage shield tunnels. The results show that the deformation of the straight-jointed water-storage and drainage shield tunnel varies greatly from the state of empty water to that of full water; and the vertical and horizontal convergence deformations of the tunnel with inner water pressure of 0.6 MPa are 2.2 times and 3.2 times of that without inner water pressure, respectively. The convergence deformation, and the maximum joint opening and bolt tension of stagger-jointed lining structure decrease by 15%-25% and 25%- 40%, respectively, compared with that of the straight-jointed water-storage and drainage shield tunnel. The bolts at the segmental joints will yield because of the increase of inner water pressure and the first occurrence of bolt yield phenomenon is located near the position on the lining structure which is under the action of maximum negative bending moment; because the failure of shield tunnel is always caused by the yield of joint bolts, this position is the weak point for the deep-buried water-storage and drainage shield tunnel. For the water-storage and drainage shield tunnel based on the connection with double rows of bolts, the bolts near the outer arc surface of segmental joints in the area of 90 degree in the vault and arch bottom can be removed; the bolts near the inner arc surface of the segmental joints within the 90 degree of the haunch must be installed, otherwise, the tensile force of the bolts at the segmental joint near the maximum negative bending moment will increase by 5%-14%. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

8.
Based on an analysis of monitoring data of surface settlement in the construction of a shield running tunnel of Beijing metro, an improved hyperbolic model was proposed to fit the ground subsidence law, and the characteris⁃ tic factor M S was used to evaluate the stratum under the condition of shield construction. The relationship between stratum parameters and surface settlement was studied, with the results indicate that the surface settlement caused by shield construction complies with hyperbolic distribution and it is basically stable at 30 days, the larger the value of M S is, the better the conditions of the stratum is and the smaller the settlement is; a certain correlation exists be⁃ tween the parameters of improved hyperbolic model and the characteristic value M S . © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

9.
The circulation system of a slurry shield is composed of a transportation system and a processing system.For shield construction, correct selection of the circulation system for the slurry shield is directly related to construc-tion speed. Using the Nanjing Yangtze tunnel as an example, the material balance calculation of the circulation sys-tem, sieving effect analysis, and analysis of the muck carrying ability of the dredging pipe are conducted for various strata. The practical results show that above mentioned calculations and analysis method provide a good reference for the proper selection of a slurry separation system and dredge pipe. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

10.
Rockburst is one of the main disasters for tunnelling under high ground stress. Taking the rockburst section of Ping'an Tunnel with high ground stress, which is located on Chengdu-Lanzhou Railway, as the study object, this paper adopts combined methods of filed measurement, numerical analysis, and laboratory test, and with respect to rockburst development mechanism, energy density change and rockburst strength it comprehensively analyzes the impact of two construction schemes (single-tube double-track tunnel system and double-tube single-track tunnel system) on the rockburst in deep-buried extra-long tunnels with high ground stress. The study results show that the order relation of maximum energy density at various locations of the tunnel is Uside wall >Uhance >Utunnel face >Uvault, and rockburst easily occurs at the working face of the tunnel section to be excavated and both side walls of excavated and supported section; compared with vault, hance, side wall and other locations, more energy would be released at the tunnel face, and the stress release holes shall be reasonably installed in the process of excavation; the doubletube single-track tunnel system scheme can effectively reduce the rockburst intensity and the rockburst hazards, so as to better avoid the occurrence of rockburst. © 2022, Editorial Office of Modern Tunnelling Technology. All right reserved.  相似文献   

11.
The circulation system of a slurry shield is composed of a transportation system and a processing system.For shield construction, correct selection of the circulation system for the slurry shield is directly related to construc-tion speed. Using the Nanjing Yangtze tunnel as an example, the material balance calculation of the circulation sys-tem, sieving effect analysis, and analysis of the muck carrying ability of the dredging pipe are conducted for various strata. The practical results show that above mentioned calculations and analysis method provide a good reference for the proper selection of a slurry separation system and dredge pipe. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

12.
The district modified stiffness method (DMSM) considers the effect of joints and hand holes on the stiff-ness of the lining ring, assuming the stiffness around the joint and hand hole is to be reduced and the stiffness else-where is not changed. Considering the stiffness reduction of the lining ring caused by the segment’s circumferential joint, the internal force of the lining structure, the ground surface settlement and the displacement response of the surrounding soil body induced by shield driving are analyzed by an HS small strain constitutive model, and a 3D FEM model is established to analyze the interactions among the tunnel, soil body and building to apply to the dou-ble-line running tunnel of Shanghai Metro Line 11, which crosses under a historic building. In contrast, a 3D numeri-cal model based on the routine method (RMM) is set up and a comparison with the site measured data is conducted,with results indicating that they agree very well. The simulation results show that the existing building not only changes the surface settlement trough but also largely reduces horizontal displacement at the corresponding measuring points of the settlement trough; the distortion values of the existing building are related to the positions of the tunnel face and the location of the building; and the final distortion doesn’t decrease after completion of tunnel construction, but major residual distortion remains. This simulation method provides a reference for the control of disturbances during shield construction in soft rock. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

13.
The large settlements of tracks will emerge due to multiple disturbances in the construction of over- lapped shield tunnels, which affects the running safety of trains. Based on the overlapped Sungang station-Honghu station shield running tunnels of Shenzhen Metro line 7 passing underneath 26 tracks of high speed railways, a rein- forcement technology system consisting of”track support + subgrade reinforcement + interlayer soil consolidation + internal support of the lower tunnel”was developed. The settlements of tracks were mainly monitored automatically with manual monitoring as an auxiliary one. The results show that the maximum settlement of main track caused by constructing overlapped shield tunnels is -5.9 mm which is less than the control value of 10 mm, ensuring the opera- tion safety and verifying the reliability and practicability of the reinforcement technology system. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

14.
For the restricted construction site of a Beijing metro station surrounded by many important buildings and characterized by complex staggered underground pipelines, many construction difficulties and a high level of re-quired management, settlement monitoring is necessary for the sake of construction safety. A 3D model of the metro,a model of the specially shaped structure and models of many details of the metro were established using the BIM technique, allowing for: creation of a 3D presentation, extraction of construction quantities, construction conse-quence optimization, guidance of construction endeavors, simulation of the construction process, 4D dynamic con-struction management and 4D dynamic settlement monitoring. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

15.
Combining with the borehole gas concentration tests for the Sichuan red-bed section of the Chengdu-Guiyang Railway, this paper analyzes its correlation with the stratum chronology geological structure, and tunnel depth on the basis of data statistics, and puts forward the suggestion to qualitatively and quantitatively divide gas working areas. The results show that the correlation between the tunnel gas concentration and the stratum chronology is not significant in the Sichuan red-bed section of the Chengdu-Guiyang Railway (except coal-bearing strata); geological structure plays a controlling role in gas transport and accumulation; and the positive correlation between the gas concentration and the tunnel depth is significant. According to the above conclusions, it could qualitatively divide the gas working areas according to the geological structure and mapping information collected during the survey stage, and quantitatively divide the gas working areas according to the gas concentration test results. The final categorization of gas working areas can be determined by combining the qualitative and quantitative results. © 2022, Editorial Office of Modern Tunnelling Technology. All right reserved.  相似文献   

16.
This paper presents the technology measures, equipment selection and required grout properties and re-lated techniques for the grouting base-station arrangement of the drag reduction system of the Fuchun River pipe jacking project, which is characterized by a combined stratum, a longitudinal curve with a large falling head, a large gradient and high water pressure. Drag reduction by grouting can effectively reduce the friction coefficient in pipe jacking construction, decrease the time and frequency of the relay station, improve construction efficiency, and re-duce the grout loss along the stratum fissure while guaranteeing grouting pressure of the terminal, is favorable for sta-ble annular bentonite grouting between the stratum fissure and the segment. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

17.
With the development of the tunnel technology in China, the shield tunnel will become an important way to build the Sea-crossing channel. Taking the current largest diameter Shantou Bay shield tunnel in China as the engineering background, this paper introduces the challenges faced by the construction of the shield launching shaft in the reclamation cofferdam: e.g. deep, irregular excavation, deep silt layer and great influence of the seawater. Based on the practical conditions, a top-down construction technique of large ring beam considering two working conditions of foundation pit excavation and shield launching is proposed. Based on three-dimensional finite element analysis and field measurement, the stress characteristics and soil deformation of foundation pit are studied. The results show that the top-down construction technique of large ring beam can effectively control the deformation of the foundation pit and save construction time. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

18.
Adopting Hardening-Soil finite element model based on soil unloading conditions, the influence of external wall insertion ratio on deformation of retaining structure and soil was studied taking the foundation pit of a metro transfer station of Suzhou metro line 1 as background. The results show that the maximum lateral displace- ment of external wall decreases with an increase of insertion ratio within the range of 30-35 mm, and the lateral de- formation at the foot of wall increases significantly in a linear form; the lateral deformation at the top of internal wall obviously increases linearly, while the maximum of lateral wall deformation of wall body increases slowly and there is almost no change at the bottom of wall; the uplift at the internal pit bottom is more than 90 mm and it is slightly effected by the insertion ration of external wall while the uplift at the external pit bottom is more than 70 mm and it increases with an decrease of the distance away from the external wall; soil mass settlement at the back of the exter- nal pit is obvious and it decreases with an increases of insertion ratio of external wall within the range 14 m away from the external wall, and the settlement reaches the maximum when the insertion ratio of external wall is 0.25 while the tendency of settlement develops reversely when the distance from the external wall is beyond 14 m. To en- sure the safety and reduce environmental impact, it is significant to determine a reasonable insertion ratio of exter- nal wall regarding the pit-in-pit excavation. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

19.
The numerical simulation was carried out based on tensile test of the embedded components in segment joints of the deep buried storage and drainage shield-driven tunnel in Shanghai in order to study the numerical approach for mechanical analysis of segment joints of the tunnel. Using the concrete damage plasticity model and nonlinear springs, the 3D refined numerical model was established, in which the embedded components with complex geometries and the bond-slip behaviors between the concrete and bars were taken into consideration. Three kinds of embedded component models with different degrees of refinement were established and simply loaded. By comparing the calculation results and considering the spent time and the accuracy of calculation, the simplified form of the embedded components used in the overall model was determined. Nonlinear springs between anchor bars and concrete were set in the model in order to simulate the bond-slip behavior between them. In addition, two contrast models were also established using binding constraint and face-face contact constraint between concrete and anchor bars respectively. The three types of models were loaded in accordance with the test conditions. Comparing the results of the numerical calculation with the test results, it is shown that the "nonlinear spring model", which takes the bond-slip behavior into consideration, is more consistent with the test results than the "face to face contact model" and "binding model". And the model also reflects the failure mode very well. It indicates that the three dimensional refined modeling method used in this paper is applicable for similar tensile tests. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

20.
In order to further evaluate the intelligent degree of the coal mining face scientifically and reasonably, this paper constructs a gray relational analysis based comprehensive evaluation model for the intelligent degree of mining face by deeply analyzing the influencing factors on the intelligent degree of mining face, such as surrounding rock detection, mining equipment, production system, supporting production system, organization and management, etc. By quantifying and scoring factors affecting the intelligence degree of mining face, using the hierarchical analysis method to obtain the weights and determine the correlations, the intelligence degrees of mining face are classified into four levels: excellent, good, medium and poor. Using the comprehensive evaluation model to empirically verify the 802 working face of Shaanxi Huangling Mining Co., Ltd., the calculated correlation is 0.765 8, which indicates that the intelligent degree of 802 working face is excellent according to the rating criteria, and it is consistent with the actual situation. Therefore, the comprehensive evaluation model based on gray relational analysis can accurately and objectively evaluate the intelligent degree of the mining face. © 2022, Editorial Office of Modern Tunnelling Technology. All right reserved.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号