首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到6条相似文献,搜索用时 0 毫秒
1.
In this paper the numerical simulation analysis of the effect of explosion in the gas pipeline compartment of a utility tunnel on neighboring metro tunnels was conducted using the software AUTODYN. The results show that the TNT equivalent in a fireproof partition with length of 200 m is 41.6 kg when the gas concentration in the gas pipeline compartment reaches 10%; the blast wave has much effect on the crown and arch waist of the round metro tunnel and it’s necessary to take some protective measures in both areas; when the surrounding soil is sand, the utili- ty tunnel is above the round metro tunnel and their alignments are in the same direction, the greater the vertical spacing between the utility tunnel and the metro tunnel, the smaller the effect of the blast wave on the metro tunnel; when the vertical spacing is 7.2 m, the maximum dynamic tensile stress is 1.86 MPa (including the static stress value of 1 MPa in the tunnel segment) and it is slightly smaller than the designed tensile strength of metro tunnel (about 1.89 MPa). The maximum vibration velocity and the maximum displacement meet the structural stability require- ments, so it is suggested the vertical spacing between the utility tunnel and metro tunnel shall not be less than 7.2 m. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

2.
The new Badaling tunnel is the longest tunnel on the under-construction Beijing-Zhangjiakou highspeedrailway, with the Badaling Great Wall station to be built in the tunnel. This station, which is under the Badaling Great Wall historic site, is the world’s largest underground high-speed railway station with the most complicated structure and the largest overburden and excavation area. It is therefore a representative project for China’s highspeed railway development strategy, supporting infrastructure facilities for the Beijing Horticultural Expo 2019 and the 2022 Winter Olympics in Beijing, and it is important that it be of high quality and completed safely. In the de-sign and construction of the station, the glyphs of the Chinese characters of "中",”国”,”人”and”品”are used, re-spectively, along the station route, in the rescue and evacuation mode, auxiliary adit and partial excavation, which is a way to successfully integrate the art of Chinese characters into tunnel engineering. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

3.
In order to study the laws of core rock deformation and’lost’rock deformation in soft rock tunnels with high ground stress, the deformations of core rocks in front of the working face and surrounding rocks are monitored by model test method, and the tunnel excavation process is simulated in detail under different high ground stress levels and working conditions with/without lining. The results show that: (1) the ground stress plays a key role in determining the installation time of soft rock tunnel support; (2) the advance deformation within 0.5D in front of the face accounts for about 2/3 of the total advance deformation; (3) the’lost’deformation behind the tunnel face has a great impact on the monitoring and measurement. With a certain high ground stress, there is a power function relationship between the’lost’deformation and the distance from the tunnel face. With the high ground stress greater than 20 MPa, it has little impact on the’lost’deformation; (4) in order to effectively control the advance deformation in soft rock tunnels with high ground stress, it is necessary to reinforce the core rock mass within 0.5D in front of the tunnel face. For the core rock mass within 0.5D~1D in front of the tunnel face, the reinforcement depends on the actual situation. © 2022, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

4.
The earth pressure acting on a shield tunnel is intrinsically related to synchronous grouting, the position of the shield machines, the rigidity of the segment and stratum, etc. Existing theoretical formulas and empirical methods couldn′t exactly reflect the actual state of the segment of a shield tunnel during construction due to the com⁃plexities mentioned above. Based on earth pressure data measured at 52 monitoring sections in 35 tunnels, the distri⁃bution laws and influential factors are analyzed. The results show that: 1) the earth pressure scope is 0 to 400 kPa for over 90% of the total samples, but is recommended to be 0.3 to 0.4 MPa for the empirical grouting pressure; 2)the earth pressure on the segment and the buried depth approximately have an exponential relationship, with the dif⁃ference between the max. earth pressure and the stable earth pressure decreasing with an increase of the buried depth; 3) the lateral pressure coefficient range is 0.5 to 2.3, which is partially out of the scope of recommended values(0.5 to 1.0) of surrounding rock of grade Ⅵ, so it is not appropriate to follow the recommended values in the specifi⁃cation; 4) the relationship of the earth pressure and the segment/soil stiffness ratio presents a quadratic function, and the most reasonable value for the stiffness ratio of the segment/soil is 1.0; and 5) there are four typical stages of the spatial distribution of earth pressure on a segment in clay stratum—the erection stage, the grouting influence stage,the consolidation contraction stage and the recovery stage, with the distribution of the circumferential earth pressure being asymmetrical. The distribution curves of the earth and water pressure in sand and soil layers are classified as a“weak decay pulse fluctuation”and“double hump,”respectively. After stabilizing, the circumferential earth pressure is notably in a symmetrical distribution, and the water pressure exhibits a light bulb shaped distribution (large at the lower part and small at the upper part). These conclusions provide a reference for studying the mechanism of earth pressure functions and perfecting the design of segments for shield tunnelling. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

5.
Based on an introduction to the construction and application of the early warning control platform for the tunnel and subway engineering, an overall analysis of the related data during tunnel and subway construction was conducted in order to give a better reference for the site construction, to guarantee safe and rapid qualified construc⁃tion, and to improve management efficiency. Based on red line control, deformation thresholds of surrounding rock, allowances of construction material and advanced geological prediction, a dual early warning system with automatic trigging and manual prejudging was adopted to control the quality of tunnels and subways and to guarantee safe con⁃ struction; through the platform a centralized management is realized, all the construction information and effective data are transmitted instantaneously by internet, decreasing management cost and increasing work efficiency. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

6.
Waterseepageofakarsttunnelsectioninsoilsurroundingrockispronetosurfacesubsidence.Considering the settlement caused by descending of water level due to water leakage, a method of surface settlement estimation under steady seepage of phreatic water was proposed. Based on the seepage and consolidation theory, the changes of dead-weight and seepage effective stress of soil unit in surrounding rock was analyzed in condition of water seepage, and the settlement zone of surrounding rock was divided by taking the funnel curve of precipitation as the boundary line. A two-dimension plane was established based on the excavation cross section and the estimation formula for surface settlement due to seepage effect was deduced by means of double integral. On the basis of Yaozhai tunnel of Liuzhai-Hechi Expressway in Guangxi Zhuang Autonomous Region, the surface settlement of soil surrounding sec⁃ tion was predicted by field measurement and formula estimation respectively. Facts and figures show that the mea⁃ sured values are mainly consistent with the estimation ones, while the measured values are larger than the estima⁃ tion ones within the scope 3 m away from the excavation face along the horizontal radial direction. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号