 共查询到20条相似文献,搜索用时 15 毫秒
1.
Gong C.  Luo Y.  Zhang J. 《现代隧道技术》2018,(6):210-216and221
Defects of tunnel lining, such as inadequate thickness, voids, cracks, rock falling and water leakage etc., endanger the safety of railway tunnel operation. Based on the site construction, an analysis of the reasons for lining defects was conducted; technical measures against lining defects were proposed and tests were carried out at site. The results show that these measures are reliable and effective, and the purposes of prevention and treatment are re⁃ alized. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

2.
The Dazhushan tunnel of Dali-Ruili railway is located in an area with complex geological structures,dense faults, various lithologies, fractured soft rock, developed karst and an underground water pressure of up to 3 MPa. Serious mud bursts and water inflow occured during the construction of the parallel adit passing through the Yanziwo fault. The water-stopping technique of grouting reinforcement is studied in light of this high-pressure fault with abundant water; sectional water drainage for moving water and polymerized grouting with super high pressure are presented; and the key points of the grouting reinforcement scheme, construction equipment configuration, criti-cal technology parameters and construction organization are described in detail. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

3.
The shield tunnel is an ultra-long linear space. It will cause a lot of dust during the tunnel maintenance and overhaul operation, which is extremely unfavorable to the physical and mental health of the construction personnel and the environment outside the tunnel. It is difficult to guarantee the ventilation effect of the linear space using the conventional dust removal technology, which directly affects the construction safety and overhaul period. Therefore, based on the overhaul of a cross-river tunnel in Shanghai, combined with Computational Fluid Dynamics (CFD) simulation, device optimization and process combination, a three-stage dust reduction standardization process for tunnel overhaul construction is proposed, namely taking a water sprayer at the working point to control the dust at the source (primary protection); installing electrostatic dust removal and water filtration dust removal equipment in the tunnel(secondary protection); and installing two sets of water curtain spray device at the two tunnel exits to prevent dusts from diffusing into the atmosphere. It explores the actual dust-reducing effects of different dust-removing measures and layout combinations, laying a technical foundation for green and efficient dust reduction. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

4.
Rockburst is one of the main disasters for tunnelling under high ground stress. Taking the rockburst section of Ping'an Tunnel with high ground stress, which is located on Chengdu-Lanzhou Railway, as the study object, this paper adopts combined methods of filed measurement, numerical analysis, and laboratory test, and with respect to rockburst development mechanism, energy density change and rockburst strength it comprehensively analyzes the impact of two construction schemes (single-tube double-track tunnel system and double-tube single-track tunnel system) on the rockburst in deep-buried extra-long tunnels with high ground stress. The study results show that the order relation of maximum energy density at various locations of the tunnel is Uside wall >Uhance >Utunnel face >Uvault, and rockburst easily occurs at the working face of the tunnel section to be excavated and both side walls of excavated and supported section; compared with vault, hance, side wall and other locations, more energy would be released at the tunnel face, and the stress release holes shall be reasonably installed in the process of excavation; the doubletube single-track tunnel system scheme can effectively reduce the rockburst intensity and the rockburst hazards, so as to better avoid the occurrence of rockburst. © 2022, Editorial Office of Modern Tunnelling Technology. All right reserved.  相似文献   

5.
Waterseepageofakarsttunnelsectioninsoilsurroundingrockispronetosurfacesubsidence.Considering the settlement caused by descending of water level due to water leakage, a method of surface settlement estimation under steady seepage of phreatic water was proposed. Based on the seepage and consolidation theory, the changes of dead-weight and seepage effective stress of soil unit in surrounding rock was analyzed in condition of water seepage, and the settlement zone of surrounding rock was divided by taking the funnel curve of precipitation as the boundary line. A two-dimension plane was established based on the excavation cross section and the estimation formula for surface settlement due to seepage effect was deduced by means of double integral. On the basis of Yaozhai tunnel of Liuzhai-Hechi Expressway in Guangxi Zhuang Autonomous Region, the surface settlement of soil surrounding sec⁃ tion was predicted by field measurement and formula estimation respectively. Facts and figures show that the mea⁃ sured values are mainly consistent with the estimation ones, while the measured values are larger than the estima⁃ tion ones within the scope 3 m away from the excavation face along the horizontal radial direction. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

6.
With a total length of about 22 km, Tianshan Shengli Tunnel on Urumqi-Yuli Expressway is currently the longest expressway tunnel under construction in the world. It adopts the construction scheme of 3 tunnels (2 D& B main tunnels and 1 TBM-driven middle pilot tunnel) + 4 shafts, which is characterized by great construction difficulty and high technical standard requirements. The tunnel construction is faced with technical challenges such as TBM passing through large fault fracture zones, long-distance construction ventilation in three tunnels, deep and large shaft construction and logistics organization in two-main tunnel construction assisted by middle pilot tunnel. In the parallel three-tunnel method design of Tianshan Shengli Tunnel, the TBM-driven middle pilot tunnel can not only play the role of advanced pilot tunnel, but also assist the construction of the two main tunnels and speed up the construction progress. For the middle pilot tunnel, the TBM excavation diameter is 8.4 m, and the initial support is designed as 100% force-bearing capacity in construction period, which can meet the requirements for two-way material transportation, ventilation and belt mucking in the pilot tunnel. Vault suspension scheme is adopted for the continuous belt conveyor, which can reduce the impact on the material flow organization in the cross passages. Multifunctional service vehicles (MSVs) independently developed by CCCC Group are used for the transportation of TBM materials and prefabricated inverted arch blocks, which can realize double-headed driving. TBM will pass through two large fault fracture zones F6 and F7. According to the stability of the surrounding rock at the tunnel face, the targeted treatment measures would be adopted. If necessary, the scheme of steel segment + extruded concrete shall be used for the initial support. In case of serious machine jamming or rock collapse, the heading expansion excavation method or bypass heading method shall be used. Tianshan Shengli Tunnel adopts phased forced ventilation option, and the ventilation mode is designed in stages with the change of tunnel construction stage. The fans and air pipes used are imported ones, and a ventilation management team is set up to strengthen ventilation management and ensure ventilation quality. Highly mechanized construction is used for the two D& B main tunnels, the application of equipment such as three-arm rock drilling jumbo and wet shotcrete machine is promoted, so as to reduce the number of workers and labor intensity, and improve work efficiency. The deep shafts of Tianshan Shengli Tunnel are constructed by short-section excavation and lining mixed operation method, and the initial support is lined by formwork pouring concrete, so as to realize safe and rapid excavation. According to the research results, the construction technology scheme for Tianshan Shengli Tunnel can meet the needs of tunnel construction. The research results can be directly used to guide the construction of Tianshan Shengli Tunnel, and provide reference for the construction of extra long highway tunnels in high-altitude areas. © 2022, Editorial Office of Modern Tunnelling Technology. All right reserved.  相似文献   

7.
The strata of Chengershan tunnel is mainly consist of the slightly cemented tertiary sandstone, the tun⁃ nel body passes through F 2 fault core zone. Geological disasters of mud outburst, sand gushing and extrusion of work face occurred several times during tunnel construction, so the risks are very high. In view of the core zone of F 2 fault with high pressure and abundant water, a variety of construction schemes were compared and analyzed in terms of technology, feasibility and safety, and vertical freezing technique was used for stratum reinforcement in the railway tunnel for the first time, furthermore the freezing scheme and tunnel support measures were studied, providing refer⁃ ence and guidance for similar tunnel construction.Mountain railway tunnel; Fault zone; Tertiary sandstone; Vertical freezing technique; Application © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

8.
Based on the Sutong GIL utility tunnel project, which is constructed by the shield machine under the river, and as for the overloading problem at the river bank slope during operating period, the refined threedimensional finite element model was established to study the deformation and cracking characteristics of the tunnel segment structure under different forms of overloading. The evolution laws of section convergence, joint opening and structural stress were analyzed, and the structure damage mechanisms were revealed under conditions of large area loading and local loading. The surface-surcharge control standard was proposed. For the big diameter shield tunneling crossing the silty clay, the research results show that: (1) the deformation failure process is divided into three stages under large area loading condition, taking the design load and compressive yield of rebars inside haunch as the critical points respectively. The first stage is characterized by the elastic stress, the second stage is in plastic state with fracture, and the third stage is accelerating deformation and instability stage. The vertical convergence is 110.5 mm with no opening of joints when rebars are yielded; (2)the deformation failure process under local loading condition is also divided into elasticity, plasticity and instability stages, taking the design load and tensile yield of rebars outside haunch as the critical points respectively. The vertical convergence is 152.6 mm with joint opening of 4.36 mm; (3) the early-warning values of additional stress on the ground under conditions of large area loading and local loading are 110 kPa and 70 kPa respectively. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

9.
Falling-off of rock piece at tunnel arch and invert heave are the main potential safety problems affecting normal operation of the railway tunnel. The reasons causing falling-off of rock piece include squeezing by lining trol⁃ ley at construction joint, concrete cutting by cantilever end of water stop at construction joint, construction cold joint at arch, concrete quality deficiency and so on. To eliminate the falling-off of rock piece at tunnel arch caused by rig⁃ id overlap, modification of lining trolley and the flexible overlap technique combining tray with rubber gasket were adopted during the construction of Nuwashan tunnel on China-Laos railway, and the potential quality problem due to rigid overlap at construction joint of tunnel lining were effectively solved. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

10.
For the restricted construction site of a Beijing metro station surrounded by many important buildings and characterized by complex staggered underground pipelines, many construction difficulties and a high level of re-quired management, settlement monitoring is necessary for the sake of construction safety. A 3D model of the metro,a model of the specially shaped structure and models of many details of the metro were established using the BIM technique, allowing for: creation of a 3D presentation, extraction of construction quantities, construction conse-quence optimization, guidance of construction endeavors, simulation of the construction process, 4D dynamic con-struction management and 4D dynamic settlement monitoring. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

11.
Based on the background of the first phase project of the R3 line of Jinan Rail Transit, and in view of the metro shield tunnel passing under the existing railway bridge and subgrade, this paper uses Abaqus to establish a numerical model to simulate the deformation of the existing bridge and subgrade of the Jiaoji railway line under the two conditions of non-active reinforcement and reinforcement. The results show that under the condition of no reinforcement, the maximum settlement of the top bridge on the pier is -5.88 mm, and the maximum settlement difference is 5.16 mm, which exceed the deformation control requirements of the 5 mm regarding the bridge pier of the railway with ballast track. The maximum lateral displacement and longitudinal displacement of the pier are 0.28 mm and -3.01 mm, respectively. After the reinforcement measures of the bored piles are adopted, the maximum settlement of the top bridge on the pier is -1.71 mm, and the maximum settlement difference is 1.16 mm, which fully meet the bridge pier deformation control standard. The maximum lateral displacement and longitudinal maximum displacement are -0.245 mm and -2.83 mm, respectively, which meet the requirements of the control standard. The vertical settlement of the railway subgrade is relatively small. The maximum settlement values under the two working conditions are -12.31 mm and -11.97 mm, respectively, which meet the subgrade settlement control requirement of 20 mm. It is proved that the reinforcement effect of the bored pile is good, and the reinforcement scheme is safe and feasible. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

12.
By scale model tests, it proves the mechanism mode of shear resistance borne by friction of contact area and concrete shear key in different contact stress states and cushion thicknesses of shear key. The results show that friction plays a significant role on shear resistance of element joint. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

13.
The large settlements of tracks will emerge due to multiple disturbances in the construction of over- lapped shield tunnels, which affects the running safety of trains. Based on the overlapped Sungang station-Honghu station shield running tunnels of Shenzhen Metro line 7 passing underneath 26 tracks of high speed railways, a rein- forcement technology system consisting of”track support + subgrade reinforcement + interlayer soil consolidation + internal support of the lower tunnel”was developed. The settlements of tracks were mainly monitored automatically with manual monitoring as an auxiliary one. The results show that the maximum settlement of main track caused by constructing overlapped shield tunnels is -5.9 mm which is less than the control value of 10 mm, ensuring the opera- tion safety and verifying the reliability and practicability of the reinforcement technology system. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

14.
In order to study the influence of spray-applied waterproofing membrane layer on the mechanical properties of tunnel lining structure, a numerical calculation model of composite lining, spray-applied waterproofing lining and single-shell lining is established according to the mechanical parameters and interface parameters of waterproofing membrane measured by tests, and comparative analysis is made on the mechanical properties of the three types of lining structures. The research results show that: (1) compared with the composite lining, the stress of the secondary lining in the spray-applied waterproofing lining structure is significantly reduced, and the stress of the initial support has little change, but the displacement of both the initial support and the secondary lining increases; (2) in the spray-applied waterproofing lining structure, the whole section of the secondary lining is in the state of small eccentric compression, and the safety factor is greatly improved; (3) spray-applied waterproofing membrane layer can improve the cooperative force-bearing capacity of initial support and secondary lining, and improve the stress state of secondary lining, which is beneficial to improve the safety of secondary lining; and (4) with the increase of the cooperative force-bearing capacity of spray-applied waterproofing lining structure, the internal force of spray-applied waterproofing lining structure will be infinitely close to that of single-shell lining structure. © 2022, Editorial Office of Modern Tunnelling Technology. All right reserved.  相似文献   

15.
The limit states of railway tunnel portal structure including compression, tensile, anti-overturning, antisliding and bearing capacity of foundation should be considered when portal structure is designed based on the prob⁃ ability limit state method. In order to evaluate the reliability of portal structure, the reliability index and limit state of bearing capacities of different limit states need to be calculated. The traditional methods generally use hand compu⁃ tation combined with MATTLAB, ANSYS, EXCEL and other softwares, which has low computation efficiency and poor practicality. In view of above problems, a calculating software for portal structure was developed based on the probability limit state method and Visual Basic platform, which realizes the function of rapid calculation of reliabili⁃ ty index and limit state of bearing capacities under five limit states of portal structure, offers three methods to calcu⁃ late the reliability index including JC method, fractile method and Monte-Carlo method. Moreover, the calculation results can be written in the EXCEL template file, greatly improving the efficiency of tunnel portal structure calcula⁃ tion. The accuracy of the software is verified by comparing with the results of hand calculation. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

16.
The operation safety of the public transport is seriously threaten by the occurrence of defects and damages in existing urban tunnels, which affects the quality of traffic, and will shorten the service life of urban tunnels. Therefore, it is of great significance to evaluate the damages of the tunnel lining structure quickly and accurately. The damage evaluation methods of the existing urban tunnel lining structure are investigated and analyzed in this paper, and a combination method of the macroscopic evaluation of the existing damaged urban tunnel and the damage mechanism of the lining structural material is proposed. Among them, the assessment method specified in the national criterion is selected to evaluate the damages of the lining structure for the macroscopic evaluation, and the classification of tunnel health levels is optimized. Meanwhile, the damage modulus based on the elastic modulus is selected, and the concept of elastic modulus reduction rate is introduced for the mechanism of damage. Furthermore, the assumed function relationship between the health level and the damage degree of existing urban tunnels is proposed and established, which provides a new idea for structural damage assessment of existing urban tunnels. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

17.
Studying the in-situ stress distribution at a tunnel site is very important to determine surrounding rock characteristics, the engineering design and the construction scheme. By using the multiple linear regression method based on the least square algorithm, the initial geostress field is analyzed and the corresponding regression coefficients are obtained. The ground stress obtained from the proposed back analysis is reasonable and can meet the demands of the engineering applications. From the rockburst risk level distribution diagram, it is speculated that the Wunvfeng tunnel is in the high filed stress area. Field monitoring should be strengthened and emergency plans should be made to cope with the rockburst risks during the construction process. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

18.
The evaluation of the stability of a tunnel’s primary support is a crucial component of ensuring the safety of subsequent construction. In light of the measured clearance displacements of the Wushishan Tunnel, the reliabili-ty of the primary support is evaluated dynamically and the design of the support structure is optimized. The research results show that full displacement and ultimate displacement are two main parameters for tunnel reliability analy-sis: the former can be obtained by positive and negative analysis, and the latter can be acquired by simulating a field measurement of displacement. It is not sufficient to apply the data specified in the code for railway tunnel design re-liability regarding determination of the reliability of a road tunnel structure using reliability theory, and it is neces-sary to use reliability theory to amend the standard of allowable empirical displacement in the Code of Road Tunnel Design. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

19.
In order to study the impacts of the transient seepage on the stability of tunnel excavation face during the installation of lining segments, the fluid-solid coupling effect based numerical model of the tunnel excavation face was developed by the finite element software PLAXIS. With adoption of the variablecontrolling approach, the influences of the depth/diameter ratio (the ratio of the buried depth to diameter of the tunnel) and the support pressure ratio (the ratio of the face support pressure to water and soil pressures ahead of the excavation face) on the face stability and ground settlement were investigated, respectively. At same time, the failure modes of the excavation face under the fluid-solid coupling analysis were also discussed. The results show that:1) the transient seepage leads to the development of the soil arching at the front of the excavation face, in which the smaller deformation at the excavation face is achieved, and so less support pressure for the face stability is allowed. While for the plastic analysis without taking into account the effect of transient seepage, a higher support pressure is required to maintain the stability of the excavation face; 2) in the fluid-solid coupling analysis, the depth/diameter ratio has less impacts on the stability of the excavation surface, but has larger impacts on the ground settlement. The larger the depth/diameter ratio, the larger the ground surface settlement and the settlement profile; 3) however, with the combination of the decrease of the support pressure and the impact of transient seepage on the settlement of ground surface, the soil arching effect in front of the excavation face is gradually reduced. The deformation zone at the ground surface is then connected with the deformed part ahead of the tunnel face to form a wedge-shaped soil sliding zone. It is also observed that the wedge-shaped body tends to have a larger funnel-shaped failure mode than that in the plastic analysis without considering the transient seepage. The results show that the transient seepage has a great impact on the stability of tunnel excavation face in the soil condition with high permeability ratio. The fluid-solid coupling analysis should be adopted to evaluate the deformation of excavation face and ground settlement. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

20.
In order to compare the ventilation efficiency and air speed of the tunnel for different parameters of ventilation openings, the acrylic board is used to build a 1:15 tunnel model and carry out the proportional model test. Four working conditions are set up to compare the ventilation in the tunnel under different ventilation openings in terms of number, length and height. The experimental results show that the air velocity distribution and ventilation efficiency change significantly under different ventilation openings in terms of number, length and height. Based on the test results, the best setting pattern of the ventilation opening is proposed in this paper. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   