首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 0 毫秒
1.
In order to study the influence of spray-applied waterproofing membrane layer on the mechanical properties of tunnel lining structure, a numerical calculation model of composite lining, spray-applied waterproofing lining and single-shell lining is established according to the mechanical parameters and interface parameters of waterproofing membrane measured by tests, and comparative analysis is made on the mechanical properties of the three types of lining structures. The research results show that: (1) compared with the composite lining, the stress of the secondary lining in the spray-applied waterproofing lining structure is significantly reduced, and the stress of the initial support has little change, but the displacement of both the initial support and the secondary lining increases; (2) in the spray-applied waterproofing lining structure, the whole section of the secondary lining is in the state of small eccentric compression, and the safety factor is greatly improved; (3) spray-applied waterproofing membrane layer can improve the cooperative force-bearing capacity of initial support and secondary lining, and improve the stress state of secondary lining, which is beneficial to improve the safety of secondary lining; and (4) with the increase of the cooperative force-bearing capacity of spray-applied waterproofing lining structure, the internal force of spray-applied waterproofing lining structure will be infinitely close to that of single-shell lining structure. © 2022, Editorial Office of Modern Tunnelling Technology. All right reserved.  相似文献   

2.
Studying the in-situ stress distribution at a tunnel site is very important to determine surrounding rock characteristics, the engineering design and the construction scheme. By using the multiple linear regression method based on the least square algorithm, the initial geostress field is analyzed and the corresponding regression coefficients are obtained. The ground stress obtained from the proposed back analysis is reasonable and can meet the demands of the engineering applications. From the rockburst risk level distribution diagram, it is speculated that the Wunvfeng tunnel is in the high filed stress area. Field monitoring should be strengthened and emergency plans should be made to cope with the rockburst risks during the construction process. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

3.
Rockburst is one of the main disasters for tunnelling under high ground stress. Taking the rockburst section of Ping'an Tunnel with high ground stress, which is located on Chengdu-Lanzhou Railway, as the study object, this paper adopts combined methods of filed measurement, numerical analysis, and laboratory test, and with respect to rockburst development mechanism, energy density change and rockburst strength it comprehensively analyzes the impact of two construction schemes (single-tube double-track tunnel system and double-tube single-track tunnel system) on the rockburst in deep-buried extra-long tunnels with high ground stress. The study results show that the order relation of maximum energy density at various locations of the tunnel is Uside wall >Uhance >Utunnel face >Uvault, and rockburst easily occurs at the working face of the tunnel section to be excavated and both side walls of excavated and supported section; compared with vault, hance, side wall and other locations, more energy would be released at the tunnel face, and the stress release holes shall be reasonably installed in the process of excavation; the doubletube single-track tunnel system scheme can effectively reduce the rockburst intensity and the rockburst hazards, so as to better avoid the occurrence of rockburst. © 2022, Editorial Office of Modern Tunnelling Technology. All right reserved.  相似文献   

4.
Waterseepageofakarsttunnelsectioninsoilsurroundingrockispronetosurfacesubsidence.Considering the settlement caused by descending of water level due to water leakage, a method of surface settlement estimation under steady seepage of phreatic water was proposed. Based on the seepage and consolidation theory, the changes of dead-weight and seepage effective stress of soil unit in surrounding rock was analyzed in condition of water seepage, and the settlement zone of surrounding rock was divided by taking the funnel curve of precipitation as the boundary line. A two-dimension plane was established based on the excavation cross section and the estimation formula for surface settlement due to seepage effect was deduced by means of double integral. On the basis of Yaozhai tunnel of Liuzhai-Hechi Expressway in Guangxi Zhuang Autonomous Region, the surface settlement of soil surrounding sec⁃ tion was predicted by field measurement and formula estimation respectively. Facts and figures show that the mea⁃ sured values are mainly consistent with the estimation ones, while the measured values are larger than the estima⁃ tion ones within the scope 3 m away from the excavation face along the horizontal radial direction. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

5.
In order to explore the control method of the intake air state in utility tunnels when the outside fresh air humidity is too high, taking the ventilation works of a utility tunnel section in Pingtan comprehensive experimental area as the research background, this paper proposes the control method of intake air state parameters for ventilation and dehumidification in utility tunnels under normal and accident conditions, by means of the effective ventilation and dehumidification duration prediction model, the evolutionary multi-objective algorithm (EMOA), and in combination with the ventilation control requirements. The results show that the intake air state parameter controller can be adjusted freely according to the different requirements of decision makers for ventilation fan working duration and dehumidifier working temperature and moisture content, and the optimized appropriate control objectives can be achieved, which is conducive to the real-time decision-making of the intake air state parameter control for ventilation and dehumidification in utility tunnels. © 2022, Editorial Office of Modern Tunnelling Technology. All right reserved.  相似文献   

6.
In this paper the numerical simulation analysis of the effect of explosion in the gas pipeline compartment of a utility tunnel on neighboring metro tunnels was conducted using the software AUTODYN. The results show that the TNT equivalent in a fireproof partition with length of 200 m is 41.6 kg when the gas concentration in the gas pipeline compartment reaches 10%; the blast wave has much effect on the crown and arch waist of the round metro tunnel and it’s necessary to take some protective measures in both areas; when the surrounding soil is sand, the utili- ty tunnel is above the round metro tunnel and their alignments are in the same direction, the greater the vertical spacing between the utility tunnel and the metro tunnel, the smaller the effect of the blast wave on the metro tunnel; when the vertical spacing is 7.2 m, the maximum dynamic tensile stress is 1.86 MPa (including the static stress value of 1 MPa in the tunnel segment) and it is slightly smaller than the designed tensile strength of metro tunnel (about 1.89 MPa). The maximum vibration velocity and the maximum displacement meet the structural stability require- ments, so it is suggested the vertical spacing between the utility tunnel and metro tunnel shall not be less than 7.2 m. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

7.
Combining the present situation and development trend of different tunnel support technologies at home and abroad, this paper analyzes the problems of rockburst in hard rock tunnels and large deformation in soft rock tunnels caused by high ground stress. It is concluded that: 1) regarding the rockburst problem, the current support technology is mainly influenced by the rock burst mechanism which is dominated by static factors, and so the used support components are generally of smaller deformation performance and "passive support" properties; 2) as the rockburst is the result of dynamic-static stress coupling, and only the anchor bolt has the "active support" attribute in the current "shotcrete+anchor bolt+wire net" support system, so the best support system should have the two functions of active support and energy release in terms of the rockburst problem, and the key focus of the research and development is anchorage members; 3) there are three main support types for large deformation in soft rock tunnels, e.g. the heavy support, layered support and yielding support. Among them, the heavy support system in underground cavern with large deformation is easy to induce excessive surrounding rock pressure, and so the applicable conditions are limited. The layered support system is still not the best choice due to its immature theoretical study, difficult determination of the thickness value and the installation time of each support layer and the interference to construction progress. With the characteristics of timely support and yielding while supporting, the yielding support system can give full play to the performance values of surrounding rocks and supporting materials, and make both of them reach the optimal state, so it is the best choice for supporting the soft rock tunnels with large deformations. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

8.
Immersed tube tunnels are recognized to have many advantages, such as adaptability to geological condi-tions, a high utilization rate of the tunnel section, reliable waterproofing and quick construction. The Qianhaiwan tunnel of the Mawan channel connects the north-side and south-side artificial reclamation zones. It is a large-scale urban underground road engineered for cargo evacuation that crosses a harbor, is deeply buried and extremely long,and encounters a complex environment and difficult geological conditions. It is an expensive investment, features high technical difficulty and, therefore, high risks. For all of these reasons, it is necessary to study the adaptability and feasibility of immersed tube construction in this case. The climatic conditions of the marine environment, geologi-cal conditions and harbor and waterway conditions are presented for the Qianhaiwan tunnel, and the overall design and construction methods for different sections are proposed. In light of the overall process of the immersed tube method, the key points and design difficulties and corresponding technical solutions for the immersed tube tunnel are analyzed. It is concluded that the immersed tube tunnel method is technically feasible but there is a series of problems that needs to be addressed. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

9.
In order to study the impacts of the transient seepage on the stability of tunnel excavation face during the installation of lining segments, the fluid-solid coupling effect based numerical model of the tunnel excavation face was developed by the finite element software PLAXIS. With adoption of the variablecontrolling approach, the influences of the depth/diameter ratio (the ratio of the buried depth to diameter of the tunnel) and the support pressure ratio (the ratio of the face support pressure to water and soil pressures ahead of the excavation face) on the face stability and ground settlement were investigated, respectively. At same time, the failure modes of the excavation face under the fluid-solid coupling analysis were also discussed. The results show that:1) the transient seepage leads to the development of the soil arching at the front of the excavation face, in which the smaller deformation at the excavation face is achieved, and so less support pressure for the face stability is allowed. While for the plastic analysis without taking into account the effect of transient seepage, a higher support pressure is required to maintain the stability of the excavation face; 2) in the fluid-solid coupling analysis, the depth/diameter ratio has less impacts on the stability of the excavation surface, but has larger impacts on the ground settlement. The larger the depth/diameter ratio, the larger the ground surface settlement and the settlement profile; 3) however, with the combination of the decrease of the support pressure and the impact of transient seepage on the settlement of ground surface, the soil arching effect in front of the excavation face is gradually reduced. The deformation zone at the ground surface is then connected with the deformed part ahead of the tunnel face to form a wedge-shaped soil sliding zone. It is also observed that the wedge-shaped body tends to have a larger funnel-shaped failure mode than that in the plastic analysis without considering the transient seepage. The results show that the transient seepage has a great impact on the stability of tunnel excavation face in the soil condition with high permeability ratio. The fluid-solid coupling analysis should be adopted to evaluate the deformation of excavation face and ground settlement. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

10.
Gong C.  Luo Y.  Zhang J. 《现代隧道技术》2018,(6):210-216and221
Defects of tunnel lining, such as inadequate thickness, voids, cracks, rock falling and water leakage etc., endanger the safety of railway tunnel operation. Based on the site construction, an analysis of the reasons for lining defects was conducted; technical measures against lining defects were proposed and tests were carried out at site. The results show that these measures are reliable and effective, and the purposes of prevention and treatment are re⁃ alized. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

11.
The strata of Chengershan tunnel is mainly consist of the slightly cemented tertiary sandstone, the tun⁃ nel body passes through F 2 fault core zone. Geological disasters of mud outburst, sand gushing and extrusion of work face occurred several times during tunnel construction, so the risks are very high. In view of the core zone of F 2 fault with high pressure and abundant water, a variety of construction schemes were compared and analyzed in terms of technology, feasibility and safety, and vertical freezing technique was used for stratum reinforcement in the railway tunnel for the first time, furthermore the freezing scheme and tunnel support measures were studied, providing refer⁃ ence and guidance for similar tunnel construction.Mountain railway tunnel; Fault zone; Tertiary sandstone; Vertical freezing technique; Application © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

12.
Surrounding rocks are the main bearing structure of underground caverns, and mechanical parameters used in design and analysis affect the result reliability directly. Based on the monitoring data of surrounding rocks of a water diversion tunnel and genetic algorithm, secondary development of software ABAQUS was conducted, related genetic algorithm was programmed to back analyze the mechanical parameters of surrounding rocks of underground caverns, then a comparison between the calculated parameters and the designed parameters was taken to discuss the rationality of the designed parameters. The results show that the inversion values are larger than the designed ones, and the displacements calculated by the inversion parameters are smaller than that of the original parameter values, showing that the parameters adopted in design are safe. The analysis results prove that the method proposed in this paper is available for parameter analysis in similar projects. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

13.
Based on an analysis of monitoring data of surface settlement in the construction of a shield running tunnel of Beijing metro, an improved hyperbolic model was proposed to fit the ground subsidence law, and the characteris⁃ tic factor M S was used to evaluate the stratum under the condition of shield construction. The relationship between stratum parameters and surface settlement was studied, with the results indicate that the surface settlement caused by shield construction complies with hyperbolic distribution and it is basically stable at 30 days, the larger the value of M S is, the better the conditions of the stratum is and the smaller the settlement is; a certain correlation exists be⁃ tween the parameters of improved hyperbolic model and the characteristic value M S . © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

14.
Segmental linings in shield tunnelling are composed of segments and joints. Mechanical behaviors of the joints govern overall behaviors of tunnel linings. Two new types of joints are adopted in Shanghai Metro Line 18, including the fast-insertion joints for adjacent rings, and the fast-slide joints for adjacent segments. In order to explore the overall behavior of segmental linings with these new types of joints, the full-scale tests are carried out for new lining structure with aligned and staggered longitudinal joints. The mechanical behaviors of the tunnel linings under different loading conditions are obtained. Furthermore, the calculation models of the tunnel linings are discussed, and regarding the modified routine method, the structural design parameters under different loading conditions are calculated, which provides a reference for the design and the comparison of the assembly method of the tunnel linings with new types of joints. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

15.
The application of prefabricated tunnel technology has been become a new research field both in China and abroad. Based on the running tunnel between Yufuhe station and Wangfuzhuang station of Jinan rail transit line R1, a new prefabricated tunnel construction technology, the PBA method is presented. This paper makes a detailed discussion on section form, supporting scheme and construction process of the PBA method. In this study, 3D a new 3D numerical model for PBA method is presented by finite difference numerical simulation software Flac and the construction processes are modeled. The rule of ground surface settlement, ground deformation and structural stress caused by PBA method is studied in detail. Results show that the structure of PBA method can effectively control the deformation magnitude and scope. Stress concentration appears at the prefabricated connection parts and the reinforcement needs to check. The total assembled structure forms the load-bearing system after the completion of the lateral wall. The built-in depth of the precast pile and pile bottom grouting quality should to be ensured to control the displacement of the precast piles. The results of this study will be a useful reference for similar projects in the future. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

16.
In recent years, large shield tunnels with internal double-decked lanes have been developing rapidly in the field of highway tunnels, and prefabricated elements are increasingly adopted in internal structure. Based on the columns-base joint in Zhuguanglu tunnel, which is under construction, 2 full-scale specimens are designed for the quasi-static test, one specimen is connected with grout sleeve splicing and the other is cast in place. The test results show that: the bearing capacity of specimen with grout sleeve splicing is equal to that of cast-in-situ specimen, but its ductility and energy dissipation capacity are worse than that of the cast-in-situ specimen. And for the specimen with grout sleeve splicing, there exists crack concentration on the area above the sleeve. The crack width is too larger in this area. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

17.
The limit states of railway tunnel portal structure including compression, tensile, anti-overturning, antisliding and bearing capacity of foundation should be considered when portal structure is designed based on the prob⁃ ability limit state method. In order to evaluate the reliability of portal structure, the reliability index and limit state of bearing capacities of different limit states need to be calculated. The traditional methods generally use hand compu⁃ tation combined with MATTLAB, ANSYS, EXCEL and other softwares, which has low computation efficiency and poor practicality. In view of above problems, a calculating software for portal structure was developed based on the probability limit state method and Visual Basic platform, which realizes the function of rapid calculation of reliabili⁃ ty index and limit state of bearing capacities under five limit states of portal structure, offers three methods to calcu⁃ late the reliability index including JC method, fractile method and Monte-Carlo method. Moreover, the calculation results can be written in the EXCEL template file, greatly improving the efficiency of tunnel portal structure calcula⁃ tion. The accuracy of the software is verified by comparing with the results of hand calculation. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

18.
The shield tunnel is an ultra-long linear space. It will cause a lot of dust during the tunnel maintenance and overhaul operation, which is extremely unfavorable to the physical and mental health of the construction personnel and the environment outside the tunnel. It is difficult to guarantee the ventilation effect of the linear space using the conventional dust removal technology, which directly affects the construction safety and overhaul period. Therefore, based on the overhaul of a cross-river tunnel in Shanghai, combined with Computational Fluid Dynamics (CFD) simulation, device optimization and process combination, a three-stage dust reduction standardization process for tunnel overhaul construction is proposed, namely taking a water sprayer at the working point to control the dust at the source (primary protection); installing electrostatic dust removal and water filtration dust removal equipment in the tunnel(secondary protection); and installing two sets of water curtain spray device at the two tunnel exits to prevent dusts from diffusing into the atmosphere. It explores the actual dust-reducing effects of different dust-removing measures and layout combinations, laying a technical foundation for green and efficient dust reduction. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

19.
Adopting Hardening-Soil finite element model based on soil unloading conditions, the influence of external wall insertion ratio on deformation of retaining structure and soil was studied taking the foundation pit of a metro transfer station of Suzhou metro line 1 as background. The results show that the maximum lateral displace- ment of external wall decreases with an increase of insertion ratio within the range of 30-35 mm, and the lateral de- formation at the foot of wall increases significantly in a linear form; the lateral deformation at the top of internal wall obviously increases linearly, while the maximum of lateral wall deformation of wall body increases slowly and there is almost no change at the bottom of wall; the uplift at the internal pit bottom is more than 90 mm and it is slightly effected by the insertion ration of external wall while the uplift at the external pit bottom is more than 70 mm and it increases with an decrease of the distance away from the external wall; soil mass settlement at the back of the exter- nal pit is obvious and it decreases with an increases of insertion ratio of external wall within the range 14 m away from the external wall, and the settlement reaches the maximum when the insertion ratio of external wall is 0.25 while the tendency of settlement develops reversely when the distance from the external wall is beyond 14 m. To en- sure the safety and reduce environmental impact, it is significant to determine a reasonable insertion ratio of exter- nal wall regarding the pit-in-pit excavation. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.  相似文献   

20.
With a total length of about 22 km, Tianshan Shengli Tunnel on Urumqi-Yuli Expressway is currently the longest expressway tunnel under construction in the world. It adopts the construction scheme of 3 tunnels (2 D& B main tunnels and 1 TBM-driven middle pilot tunnel) + 4 shafts, which is characterized by great construction difficulty and high technical standard requirements. The tunnel construction is faced with technical challenges such as TBM passing through large fault fracture zones, long-distance construction ventilation in three tunnels, deep and large shaft construction and logistics organization in two-main tunnel construction assisted by middle pilot tunnel. In the parallel three-tunnel method design of Tianshan Shengli Tunnel, the TBM-driven middle pilot tunnel can not only play the role of advanced pilot tunnel, but also assist the construction of the two main tunnels and speed up the construction progress. For the middle pilot tunnel, the TBM excavation diameter is 8.4 m, and the initial support is designed as 100% force-bearing capacity in construction period, which can meet the requirements for two-way material transportation, ventilation and belt mucking in the pilot tunnel. Vault suspension scheme is adopted for the continuous belt conveyor, which can reduce the impact on the material flow organization in the cross passages. Multifunctional service vehicles (MSVs) independently developed by CCCC Group are used for the transportation of TBM materials and prefabricated inverted arch blocks, which can realize double-headed driving. TBM will pass through two large fault fracture zones F6 and F7. According to the stability of the surrounding rock at the tunnel face, the targeted treatment measures would be adopted. If necessary, the scheme of steel segment + extruded concrete shall be used for the initial support. In case of serious machine jamming or rock collapse, the heading expansion excavation method or bypass heading method shall be used. Tianshan Shengli Tunnel adopts phased forced ventilation option, and the ventilation mode is designed in stages with the change of tunnel construction stage. The fans and air pipes used are imported ones, and a ventilation management team is set up to strengthen ventilation management and ensure ventilation quality. Highly mechanized construction is used for the two D& B main tunnels, the application of equipment such as three-arm rock drilling jumbo and wet shotcrete machine is promoted, so as to reduce the number of workers and labor intensity, and improve work efficiency. The deep shafts of Tianshan Shengli Tunnel are constructed by short-section excavation and lining mixed operation method, and the initial support is lined by formwork pouring concrete, so as to realize safe and rapid excavation. According to the research results, the construction technology scheme for Tianshan Shengli Tunnel can meet the needs of tunnel construction. The research results can be directly used to guide the construction of Tianshan Shengli Tunnel, and provide reference for the construction of extra long highway tunnels in high-altitude areas. © 2022, Editorial Office of Modern Tunnelling Technology. All right reserved.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号