首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
Transit textbooks and engineering manuals indicate that the capacity of Bus Rapid Transit –BRT – systems does not exceed 20,000 passengers per hour per direction. The implementation of the TransMilenio BRT System, in Bogotá, Colombia, showed that the systematic combination of multiple platforms at stations, overtaking lanes, level boarding, prepayment, large buses with multiple doors, express and local services, and traffic engineering measures at intersections, allow for very large passenger throughput. Measurements indicate actual throughput of 43,000 passengers per hour per direction with average bus occupancy of 150 passengers per articulated bus, and a commercial speed of 22–24 km/h. According to special formulas developed for the analysis of high capacity BRT corridors, the critical section of TransMilenio has a practical capacity of 48,000 passengers per hour per direction with its existing infrastructure and 150 passengers per bus – 35,000 passengers per hour per direction with 110 passengers per bus. Changes in existing infrastructure, such as additional platforms, higher capacity vehicles, non-grade facilities at critical intersections, among other improvements, may increase the capacity, speed, reliability and quality of service of the system.  相似文献   

2.
A survey of Bus Rapid Transit BRT and Bus of High Level of Service BHLS around the world indicates that there are about 120 cities with bus corridors, with 99 of the cities entering into the list in the last 12 years. The existing bus corridors comprise about 280 corridors, 4300 km, 6700 stations and use 30,000 buses, serving about 28 million passengers per day. In 2010–2011, 19 cities completed new systems − 16 in the developing world – and seven cities expanded their current systems. By late 2011, about 49 new cities were building systems, 16 cities were expanding their corridors, and 31 cities were in initial planning. This impressive growth may be attributed in part to the successes of Curitiba, Bogotá, México City, Istanbul, Ahmedabad and Guangzhou. These cities show low cost, rapid implementation and high performance BRTs, with significant positive externalities. Interesting trends are emerging, such as the implementation of citywide integrated bus systems, improved processes for private participation in operations, increased funding from national governments, and growth of bus manufacturers and technology providers. Despite the growth, there are some outstanding issues: BRT and BHLS do not have a single meaning and image and are often regarded as a “second best” as compared to rail alternatives. In addition several systems in the developing world suffer problems resulting from poor planning, implementation and operation, due to financial, institutional and regulatory constraints. The BRT and BHLS Industry are in their “infancy” and there is need for consolidation and concerted effort.  相似文献   

3.
The South African government in 2006 initiated an urban public transport reform programme reliant on the introduction of new bus rapid transit (BRT) systems. Affected paratransit operators can opt to be incorporated in these systems by forming new operating companies, but must withdraw their existing services from proposed routes. Cape Town's first phase of BRT operations came online in 2011, and operator engagement has focussed on this phase. The attitudes within this city's paratransit sector in relation to future phases, and to the broader reform policy, remain largely untested. In view of this sector's past resistance to government-led proposals, and the current phase avoiding areas with the highest concentrations of operators, the current engagement process's outcomes may not be adequate indicators of future prospects.  相似文献   

4.
In the 1970s, Brazil was leading the implementation of high-flow bus priority schemes, but now cities are less capable of financing public infrastructures. This paper explores the private sector participation in the provision of transit infrastructure based on Public-Private Partnerships (PPP) for Bus Rapid Transit (BRT). The Porto Alegre BRT contemplates interchange terminals planned to accommodate retail and service activities. It is expected that these areas shall generate enough revenues to remunerate private investors, under a PPP scheme, for the construction of terminals and part of the infrastructure required to upgrade some sections of the existing busways to BRT standards.  相似文献   

5.
The paper presents the main characteristics, costs and impacts of TransMilenio, the bus based mass transit system of Bogotá, using BRT corridors and feeder services. An ex-post cost-benefit analysis is done, including monetary valuation of direct impacts on travel time and travel cost and externalities, such as improved road safety and air quality. Impacts on crime, land values, employment and tax revenue are also presented. The results are positive and robust; nevertheless, it is important to recognize that user perception has declined and there is urgent need to introduce service improvements. The paper also includes an ex-ante evaluation of the projected expansion using current costs, which indicates the need to limit construction capital costs. The results are an indication of the potential of BRT, and the evaluation methodology is applicable to other transit projects.  相似文献   

6.
Workshop 2 focused on the role of BRT as part of enhanced public transport service provision. Discussion topics included case studies around the world; improved performance and operations; and better contracts, institutional settings and enhanced policies. BRT was identified as a vital component of modern public transport systems due to its ability to provide high performance and rapid implementation at a lower cost than comparable rail transit. The participants concluded that on top of improving trunk transit corridors, it is important to look to the first and last kilometers and the connections among transport modes. In addition, it is important to consider all dimensions, not just the technical issues. The workshop identified the desirable ingredients for BRT success, created a table of bus based options for different applications and a list of research topics.  相似文献   

7.
针对快速公交(BRT)停靠站发展过程中的定位不清晰、标准不统一、衔接不顺畅等问题,基于站台线型、横向位置、纵向位置等不同的分类标准,研究了不同类型公交停靠站的特点、优缺点和适用性。  相似文献   

8.
The City of Johannesburg, South Africa, implemented the first phase of its Bus Rapid Transit (BRT) system named Rea Vaya between 2009 and 2011. The system design and organisational arrangements drew heavily on precedents from South America, especially insofar as BRT is used as an instrument for securing the transformation and formalisation of a fragmented and problematic informal public transport industry. Despite the inevitable transition problems, the formalisation scheme appears to be generally successful – an outcome that surprised many analysts as it follows a long history of mistrust, resistance, and unsuccessful interventions between government and the minibus taxi industry. The paper offers an analysis of the reasons for the successful transformation of participating taxi operators, by using a life-cycle analogy. We argue that the minibus-taxi industry in South Africa has reached a state of stasis and maturity, with limited opportunities for further growth in its present form. BRT, as it is implemented locally, offers opportunities for re-invention – for moving onto new a potential growth trajectory – by overcoming the binding constraints of informality and by opening up new markets to operators. The life-cycle analysis also offers some insights into critical success factors that, if not met in the long run, could jeopardise the longevity and scalability of the formalisation project. The paper concludes with insights regarding the planning and management of BRT systems to maximise their potential for leveraging the formalisation of informal operators, both in South Africa and in other developing countries.  相似文献   

9.
Land development impacts of mass transit have long been studied in the developed economies. Yet relatively little is known by the outside world about the Chinese experience due to China's rather short history in the development of modern mass transit and land/property market. This paper attempts to fill the gap by presenting evidence from China, with a detailed case study of Beijing. Selecting three newly built suburban transit lines in Beijing, the study examined land development context and estimated hedonic housing price models to measure the proximity premiums associated with these three lines. The empirical evidence in Beijing, one of the first tier mass transit cities in China, shows that investments in mass transit can have significant and positive impacts on land development. Properties with transit proximity enjoy sizable price or value premiums. The study also confirms the international experience: transit impacts on land development are unlikely to occur automatically; they rely greatly on supportive regional and site conditions. Integrated planning and design for mass transit and land development are critical to expand and maximize the return of transit investments.  相似文献   

10.
Abstract

Although New Zealand has a population of 3 million and a coastline of about 10,000 miles there are already heavy pressures on some parts of it. Historically, subdivisions of less than 10 acres require the setting aside of a one‐chain esplanade reserve as part of a general reserve contribution. Some national and regional parks also include significant areas of coast. Recently the Lands and Survey Department has commenced a detailed study of the coastline. Another very recent development is the requirement of an Environmental Impact Report for all major government works. The Waitemata Harbour has been the subject of a detailed study and the reports are now beginning to appear. There has been a heavy demand for shallow bays and estuaries for sanitary land fill, as well as for dredge fill. The main pressure on the coast at present is for holiday cottage sites and some legislative changes may be necessary. In the future new marinas will probably be considered particularly in relation to the extent they provide for the general public rather than a selected few. Industry is only just beginning to make an impact upon the coast. New power stations, natural gas or thermonuclear, are likely to be located on the coastline and this would bring some environmental problems. Recently, it has been argued that to ensure wise use of the coastline there should be national, rather than local or regional, control by a specially appointed Coastal Commission.  相似文献   

11.
Bus Rapid Transit (BRT) systems are undergoing rapid development in many countries due to the unique characteristics of this form of mass transit. In China, BRT schemes are being adopted as a key strategy for relieving traffic problems. As a case-study, this paper examines the performance and impacts of BRT in Beijing, the first full-featured BRT system in China. It considers in turn the role of ITS technology in influencing the operational efficiency, technical performance and cost issues associated with BRT. Particular attention is given to the consequent impacts of BRT on travel behaviour change, traffic environment and property development. While some challenges remain, the early performance of BRT suggests that it is one of the key measures for promoting sustainable mobility.  相似文献   

12.
This research focuses on coral reef health in the South Pacific region, an area of high global coral diversity. Coral reef health surrounding two study sites in Rarotonga, Cook Islands, has been assessed in areas that have not been previously surveyed. Each study site has distinct differences based upon marine management practices. Marine management practices are identified and described and some historical reasons as why they exist are discussed. Data are also presented on the ecological condition (coral coverage, number of coral species, clonal condition, disease, and presence and absence of bioindicators). This interdisciplinary research methodology includes both ecological and social data collection to further understand human- environment interactions. In comparing the reefs with different management practices, I argue that the implementation of traditional marine social institutions as exemplified in this case study of the Ra'ui in Rarotonga, Cook Islands, is an effective conservation management tool and is improving coral reef health. The Ra'ui site has significantly higher species diversity/Mortality Index ( F = 2.63).  相似文献   

13.
Abstract

In this article we consider a linear programming model for assessing the aggregate impact of land‐use activities scattered over a large area on the resultant pollutant concentrations in coastal waters. The dispersion to coastal waters of the adverse environmental loads generated by the land uses is described by a set of transport coefficients that measure the attenuation of pollutants, such as industrial BOD, carried to the coast along surface drainage basins. Further dispersion in the waters caused by tidal action is then described by the simple procedure know as “pollution susceptibility.”; The model seeks to minimize the steady‐state concentrations of pollutants by establishing an optimal spatial configuration of residential, commercial, and industrial land uses. This configuration is constrained by a number of restrictions based on local and regional targets for growth and development. The methodology discussed in this article is intended to be useful to regional planners, and is based on a study conducted for the Long Island area.  相似文献   

14.
针对船舶耐撞特性研究问题的特点,提出进行结构碰撞相似律研究的必要性和重要性。利用相似理论分析了碰撞过程的相似参数,建立了船舶结构耐撞性研究中的相似律关系。在此基础上以平板结构撞击特性研究为计算模型,应用显式有限元程序MSC/Dytran对满足比例关系的撞击过程进行数值仿真计算。计算结果表明,原型与比例模型的撞击响应特性符合相似律。考虑到船用材料的率相关性,针对相似加筋圆柱壳结构进行撞击比较分析,认为由于高强度低合金结构钢的率效应不敏感,且撞击载荷速度较低,相似律仍然成立。  相似文献   

15.
结合厦门的城市规模及经济水平、居民的出行方式、城市道路条件等自身条件,对厦门快速交通系统(BRT)进行了合理的功能定位,并介绍了厦门BRT一期工程情况。实践证明,厦门BRT定位准确,对改善出行条件、缓解交通拥堵及提高出行效率起到很大作用,为破解城市交通难问题做出了有益尝试,充分体现了BRT“大容量、安全、便捷、准时、舒适”的特点。  相似文献   

16.
This paper compares recent experiences in contract negotiation and subsequent commitment in public air services with the bus industry. The heart of the paper is a survey of European and Australian regional airlines, which we mirror with revealed experiences of bus operators. We aim to identify a number of elements in the contracting regimes that have exposed ambiguity and significant gaps in what the principal (e.g., transport department) expected, and what the agent (airline or bus operator) believed they were obliged to deliver. Ultimately airline and bus services are similar in that public authorities procure transport services that are desirable for the society but would be unprofitable without government involvement. In both sectors (theoretically fairly similar) public transport contracts are used, and those usually include obligations and performance measurements. In terms of similarities, one of the surveyed contract details that had a perceived high clarity in both industries was “payment procedures” and amongst those with rather poor clarity was also in both industries “incentives to improve performance and grow patronage”. We also show differences between regional air services and bus operations with regard to performance measurement and pre-specified obligations. Because of the strong safety culture around air services we find that regulation and trusting partnerships are even more important to aviation than to the bus sector. Because of the high level of trust but also because of simpler and more complete contracts in aviation, there is much less (re-)negotiation going on compared to the bus operations.  相似文献   

17.
This paper reviews a number of themes that have played a crucial role in the debate on alternative contracting regimes for the provision of urban bus services. We have selected four crucial issues to reflect on: (i) contractual regimes (in particular competitive tendering as compared to negotiated performance-based contracts, as means to award the rights to provide service); (ii) contract completeness (focussing on ex ante and ex post elements); (iii) building trust through partnership; and (iv) tactical or system level planning for bus services. Experience in these areas suggests that competitive tendering has frequently not lived up to expectations and that negotiation is likely in many circumstances to deliver better value for money.  相似文献   

18.
The local bus market in Japan was deregulated in 2002. This study examines the impact of this deregulation on the market structure and the operators' cost efficiency over the last ten years. First, we perform a qualitative before-and-after-deregulation analysis of Japan's bus market, finding that there has been little change in the structure of the Japanese bus market so far. Second, we investigate the effectiveness of the deregulation and internal organisational factors by using a dataset of publicly owned (municipal) bus companies. We estimate the total cost frontier functions in order to examine their effects, showing that it is the internal organisational factors (i.e. governance structure) that affect the operator's efficiency, not deregulation. In fact, the coefficient of subsidies to companies is positive, with statistical significance, thereby suggesting that cost efficiency decreases as the subsidy ratio increases. The coefficient of the contracting-out (MCGL) dummy also obtains statistically significant results; thus, we provide an account of how contracting out clearly improves operators' cost efficiency. The deregulation variable did not show significant results.  相似文献   

19.
Adelaide's bus system has been transformed from a government monopoly operation to a competitively tendered system with services provided by private operators under contract. The ‘Adelaide model’ has unique features, and has been considered in several international reviews of urban bus service procurement. The paper reviews the experience in Adelaide up to 2006/07. It updates previous evidence that focused on technical efficiency impacts. It particularly examines the development of the system to address allocative efficiency, in terms of the quantity, quality and market orientation of the services provided, and the consequent effects on patronage.  相似文献   

20.
宋波 《船电技术》2014,34(8):31-35
采用中压直流电网输配电是舰船综合电力系统的重点发展方向,但中压直流开关的分断能力不足成为中压直流电网发展的一个重要制约.本文提出在合理位置加装电弧触发式混合型限流熔断器(ATH-CLF)来限制中压直流电网短路电流的方法来解决这一问题.首先以IEEE Std 1709-2010推荐的一种舰船中压直流电网为例,建立了该电网的EMTP仿真模型和ATH-CLF的EMTP仿真模型,计算了有无ATH-CLF以及ATH-CLF安装在不同位置时各典型位置发生短路的电网短路电流及母线电压跌落.分析表明,合理的ATH-CLF加装方案可有效降低短路电流水平,并可使非故障区域的母线电压跌落在10 ms之内恢复.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号