首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到11条相似文献,搜索用时 15 毫秒
1.
Bus Rapid Transit (BRT) systems are undergoing rapid development in many countries due to the unique characteristics of this form of mass transit. In China, BRT schemes are being adopted as a key strategy for relieving traffic problems. As a case-study, this paper examines the performance and impacts of BRT in Beijing, the first full-featured BRT system in China. It considers in turn the role of ITS technology in influencing the operational efficiency, technical performance and cost issues associated with BRT. Particular attention is given to the consequent impacts of BRT on travel behaviour change, traffic environment and property development. While some challenges remain, the early performance of BRT suggests that it is one of the key measures for promoting sustainable mobility.  相似文献   

2.
In the 1970s, Brazil was leading the implementation of high-flow bus priority schemes, but now cities are less capable of financing public infrastructures. This paper explores the private sector participation in the provision of transit infrastructure based on Public-Private Partnerships (PPP) for Bus Rapid Transit (BRT). The Porto Alegre BRT contemplates interchange terminals planned to accommodate retail and service activities. It is expected that these areas shall generate enough revenues to remunerate private investors, under a PPP scheme, for the construction of terminals and part of the infrastructure required to upgrade some sections of the existing busways to BRT standards.  相似文献   

3.
A survey of Bus Rapid Transit BRT and Bus of High Level of Service BHLS around the world indicates that there are about 120 cities with bus corridors, with 99 of the cities entering into the list in the last 12 years. The existing bus corridors comprise about 280 corridors, 4300 km, 6700 stations and use 30,000 buses, serving about 28 million passengers per day. In 2010–2011, 19 cities completed new systems − 16 in the developing world – and seven cities expanded their current systems. By late 2011, about 49 new cities were building systems, 16 cities were expanding their corridors, and 31 cities were in initial planning. This impressive growth may be attributed in part to the successes of Curitiba, Bogotá, México City, Istanbul, Ahmedabad and Guangzhou. These cities show low cost, rapid implementation and high performance BRTs, with significant positive externalities. Interesting trends are emerging, such as the implementation of citywide integrated bus systems, improved processes for private participation in operations, increased funding from national governments, and growth of bus manufacturers and technology providers. Despite the growth, there are some outstanding issues: BRT and BHLS do not have a single meaning and image and are often regarded as a “second best” as compared to rail alternatives. In addition several systems in the developing world suffer problems resulting from poor planning, implementation and operation, due to financial, institutional and regulatory constraints. The BRT and BHLS Industry are in their “infancy” and there is need for consolidation and concerted effort.  相似文献   

4.
The City of Johannesburg, South Africa, implemented the first phase of its Bus Rapid Transit (BRT) system named Rea Vaya between 2009 and 2011. The system design and organisational arrangements drew heavily on precedents from South America, especially insofar as BRT is used as an instrument for securing the transformation and formalisation of a fragmented and problematic informal public transport industry. Despite the inevitable transition problems, the formalisation scheme appears to be generally successful – an outcome that surprised many analysts as it follows a long history of mistrust, resistance, and unsuccessful interventions between government and the minibus taxi industry. The paper offers an analysis of the reasons for the successful transformation of participating taxi operators, by using a life-cycle analogy. We argue that the minibus-taxi industry in South Africa has reached a state of stasis and maturity, with limited opportunities for further growth in its present form. BRT, as it is implemented locally, offers opportunities for re-invention – for moving onto new a potential growth trajectory – by overcoming the binding constraints of informality and by opening up new markets to operators. The life-cycle analysis also offers some insights into critical success factors that, if not met in the long run, could jeopardise the longevity and scalability of the formalisation project. The paper concludes with insights regarding the planning and management of BRT systems to maximise their potential for leveraging the formalisation of informal operators, both in South Africa and in other developing countries.  相似文献   

5.
Transit textbooks and engineering manuals indicate that the capacity of Bus Rapid Transit –BRT – systems does not exceed 20,000 passengers per hour per direction. The implementation of the TransMilenio BRT System, in Bogotá, Colombia, showed that the systematic combination of multiple platforms at stations, overtaking lanes, level boarding, prepayment, large buses with multiple doors, express and local services, and traffic engineering measures at intersections, allow for very large passenger throughput. Measurements indicate actual throughput of 43,000 passengers per hour per direction with average bus occupancy of 150 passengers per articulated bus, and a commercial speed of 22–24 km/h. According to special formulas developed for the analysis of high capacity BRT corridors, the critical section of TransMilenio has a practical capacity of 48,000 passengers per hour per direction with its existing infrastructure and 150 passengers per bus – 35,000 passengers per hour per direction with 110 passengers per bus. Changes in existing infrastructure, such as additional platforms, higher capacity vehicles, non-grade facilities at critical intersections, among other improvements, may increase the capacity, speed, reliability and quality of service of the system.  相似文献   

6.
At the time of writing (2010), the world is witnessing the aftermath of the most severe financial sector meltdown in modern economic history caused by the real estate bubble in the United States. Its consequences on the real economy, especially in Europe, are yet to be fathomed, and this of course includes the longer-term impacts on international ocean transportation, ports and the distribution of global production.The economic recession has left the international shipping and port sectors with substantial overcapacity. This has resulted in drastic cost cutting measures on the one hand, and voluntary, often consensual, and coordinated reduction of supply on the other. These measures, together with a noticeable recovery in demand, are gradually leading again to improvement in prices charged by carriers and other transport service providers.In view of the country’s expanse; size of population; and regional inequalities, India’s dry ports (inland cargo consolidation and distribution centres) are seen by the government as a pivot of export-led growth and economic development (Haralambides & Gujar, 2011). Moreover, public and private sectors alike see the coordinated development of dry ports as the only way forward in terms of easing pressures at congested coastal ports, thus improving supply chain efficiency. In spite of this, dry port development and operations are still dominated by the public sector, under prices, capacity, land acquisition policies and other conditions that make private sector participation risky and comparatively unattractive. In order to rationalize dry port capacity and prices, this paper argues in favour of greater devolution through competition-enhancing Public-Private Partnerships (PPPs). The paper puts forward recommendations for the necessary legal, regulatory and general economic policy interventions based on international best practice, while keeping Indian specificities in the right perspective.  相似文献   

7.
The South African government in 2006 initiated an urban public transport reform programme reliant on the introduction of new bus rapid transit (BRT) systems. Affected paratransit operators can opt to be incorporated in these systems by forming new operating companies, but must withdraw their existing services from proposed routes. Cape Town's first phase of BRT operations came online in 2011, and operator engagement has focussed on this phase. The attitudes within this city's paratransit sector in relation to future phases, and to the broader reform policy, remain largely untested. In view of this sector's past resistance to government-led proposals, and the current phase avoiding areas with the highest concentrations of operators, the current engagement process's outcomes may not be adequate indicators of future prospects.  相似文献   

8.
9.
This paper is written as a result of some years experience with fatigue analysis of offshore jacket structures where the connections are made as tubular joints. The hot spot stresses at the tubular joints in such analysis are normally derived based on parametric equations for stress concentration factors. These stress concentration factors are normally related to the axial force in the brace. It is observed that the hot spot stresses at the crown positions of the tubular joint in some cases are significantly affected by the local loading on the chord and the bending moment in the chord. In order to use the existing formulae in these cases some engineering effort is required to derive correct hot spot stress. This work can be avoided by using the nominal stress in the chord as the basis for calculating the hot spot stress at the crown position instead of using the axial force in the brace as basis for the analysis. This also extends the validity of the equations for stress concentration factors for T- and Y- joints in design standards. The proposed modification makes it also simpler to include the effect of joint flexibility in a proper way. The basis for a proposed revision of the equations for stress concentration factors for these joints is presented in this paper. It is considered that this modification leads to minor changes of the computer code, but that it will save analysis work for engineers and reduce the possibility of calculating incorrect fatigue lives in tubular frame structures.  相似文献   

10.
长江上游多沙卵石滩险,水流湍急,泥沙输移强度大,航道整治建筑物水毁现象较为常见。通过归纳建筑物损毁部位,分析发生损毁的原因,总结近年维修实践成果,提出了混凝土坝面、扭王字混凝土块护面和抛石跺体等能适应类似于长江上游河床地质和水沙条件,有利于建筑物稳定的结构设计,可为整治工程建设和维护提供参考。  相似文献   

11.
  目的  密闭空间内爆炸过程不仅涉及冲击波的传播和反射,还包含复杂的后燃烧效应。后燃烧效应既增强了冲击波强度,还会对最终准静态压力产生较大影响。为对约束空间内爆炸准静态超压进行预测,  方法  基于化学反应分析及能量守恒定律,推导给出一种考虑后燃烧效应内爆炸准静态超压峰值的计算模型,并将模型计算得到的准静态超压与相关文献的实验测量结果及经验公式的结果进行对比分析,以验证所提理论模型的可靠性和准确性。  结果  结果表明:理论模型计算的准静态超压峰值与文献的实验测量及经验公式的结果吻合较好;Anderson经验公式在药量体积比小于0.5 kg/m3的爆炸工况下并不适用,文献[相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号