共查询到4条相似文献,搜索用时 0 毫秒
1.
Jackie Walters 《Research in Transportation Economics》2008,22(1):98-108
In South Africa, a restructuring of the public transport system is currently under way. In the bus industry the tender for contract system is being implemented, the commuter rail sector is being recapitalised and the minibus taxi industry recapitalization programme is in its early stages. Progress with policy implementation across the modes of transport, modal split trends and issues that hamper the full development of the public transport industry are discussed in this paper. Medium to long term policy and strategy initiatives that will further inform the development of the industry are also highlighted in this chapter. 相似文献
2.
A survey of Bus Rapid Transit BRT and Bus of High Level of Service BHLS around the world indicates that there are about 120 cities with bus corridors, with 99 of the cities entering into the list in the last 12 years. The existing bus corridors comprise about 280 corridors, 4300 km, 6700 stations and use 30,000 buses, serving about 28 million passengers per day. In 2010–2011, 19 cities completed new systems − 16 in the developing world – and seven cities expanded their current systems. By late 2011, about 49 new cities were building systems, 16 cities were expanding their corridors, and 31 cities were in initial planning. This impressive growth may be attributed in part to the successes of Curitiba, Bogotá, México City, Istanbul, Ahmedabad and Guangzhou. These cities show low cost, rapid implementation and high performance BRTs, with significant positive externalities. Interesting trends are emerging, such as the implementation of citywide integrated bus systems, improved processes for private participation in operations, increased funding from national governments, and growth of bus manufacturers and technology providers. Despite the growth, there are some outstanding issues: BRT and BHLS do not have a single meaning and image and are often regarded as a “second best” as compared to rail alternatives. In addition several systems in the developing world suffer problems resulting from poor planning, implementation and operation, due to financial, institutional and regulatory constraints. The BRT and BHLS Industry are in their “infancy” and there is need for consolidation and concerted effort. 相似文献
3.
The diagnosis for urban transport sustainability depends on the context of different regions worldwide. We focus in this paper on West and North Africa which reveal similarities but also structural differences which are explored further. The importance of paratransit in its various forms is strongly observed in sub-Saharan Africa and to a lesser extent in North Africa. The attempts to regulate and organise this sector have been difficult; one interesting experience in Dakar occurred during a programme of fleet renewal. In parallel it is observed that there are positive but insufficient experiences of public transport authorities in some cities (Dakar, Abidjan) and similar projects postponed in other cities because of the institutional problems. One also observes the constant difficulties of designing sustainable schemes for bus companies. An answer to this crisis has been found in North Africa, through investment in new mass transport systems. However, mass transport projects in West Africa are very weak in comparison. The gap between public transport costs and income levels there remains a major obstacle to sustainable mobility exacerbated by the poverty of a significant part of the urban population in West Africa. Two other critical factors are also identified affecting sustainable mobility requirements, namely, the urban sprawl and increasing energy costs. Finally the conclusion recommends the use of research and expertise networks in order to help the design and the implementation of suited solutions. 相似文献
4.
Engaging the paratransit sector in Cape Town on public transport reform: Progress,process and risks 总被引:1,自引:0,他引:1
The South African government in 2006 initiated an urban public transport reform programme reliant on the introduction of new bus rapid transit (BRT) systems. Affected paratransit operators can opt to be incorporated in these systems by forming new operating companies, but must withdraw their existing services from proposed routes. Cape Town's first phase of BRT operations came online in 2011, and operator engagement has focussed on this phase. The attitudes within this city's paratransit sector in relation to future phases, and to the broader reform policy, remain largely untested. In view of this sector's past resistance to government-led proposals, and the current phase avoiding areas with the highest concentrations of operators, the current engagement process's outcomes may not be adequate indicators of future prospects. 相似文献