共查询到20条相似文献,搜索用时 15 毫秒
1.
Sampling campaign was conducted over six weeks to determine particulate matter (PM) concentrations from Sydney Trains airport line (T2) at both underground and ground levels using DustTrak. Dust samples were collected and analysed for 12 metals (Fe, Ca, Mn, Cr, Zn, Cu, Pb, Al, Co, Ni, Ba and Na) by atomic emission spectroscopy. Average underground PM10 and PM2.5 concentrations from inside the trains were 2.8 and 2.5 times greater than at ground level. Similarly, PM10 and PM2.5 concentrations on underground platforms were 2.7 and 2.5 times greater than ground level platforms. Average underground PM concentrations exceeded the national air quality standards for both PM10 (50 µg/m3) and PM2.5 (25 µg/m3). Correlation analysis showed a strong to moderate association between PM concentrations at ground level and background PM concentrations (r2 from 0.952 to 0.500). The findings suggested that underground PM concentrations were less influenced by the ambient background than at ground level. The metal concentrations decreased in the order of Fe, Cr, Ca, Al, Na, Ba, Mn, Zn, Cu, Ni, Co and Pb. The pollution index (PI) and enrichment factor (EF) values were calculated to identify the levels and sources of contamination in the underground railway microenvironments. PM was remarkably rich in Fe with a mean concentration of 73.51 mg/g and EF of 61.31, followed by Ni and Cr. These results noticeably indicated a high level of metal contamination in the underground environments, with the principal contribution from track abrasion and wear processes. 相似文献
2.
In this study, HMs concentration in sediments and water from the Lake Pontchartrain estuary along the I-10 Bridge were investigated in two seasons to evaluate the level of contamination and to assess the effect of vehicular traffic. Vehicular traffic has led to HMs such as As, Cd, Cr, Pb, Zn, Ni, and Cu accumulation in sediments along the bridge. The HMs content in water especially in summer increased due to high temperature which led to release of HMs from the sediments. The level of pollution attributed to anthropogenic activities was evaluated using several pollution indicators. The overall HMs bioavailability and EFs was mostly high in summer and the concentration of the HMs in both sediments and water was highly influenced by the season and the distance from the highways. The content of As and Cd in lake sediments were higher than the background values (BGV) for both seasons (spring and summer), and Cr and Pb in sediments were higher than the BGV in most sampling points in the spring. According to Sediments Quality Guidelines (SQGs), heavy metals except for As have low biotoxicity, and As could potentially result in harmful effects on the aquatic organisms. The relationship between As and vehicular traffic is less studied so our finding stress the need for further study on source of As in Lake Pontchartrain sediments. 相似文献
3.
4.
Combining with the borehole gas concentration tests for the Sichuan red-bed section of the Chengdu-Guiyang Railway, this paper analyzes its correlation with the stratum chronology geological structure, and tunnel depth on the basis of data statistics, and puts forward the suggestion to qualitatively and quantitatively divide gas working areas. The results show that the correlation between the tunnel gas concentration and the stratum chronology is not significant in the Sichuan red-bed section of the Chengdu-Guiyang Railway (except coal-bearing strata); geological structure plays a controlling role in gas transport and accumulation; and the positive correlation between the gas concentration and the tunnel depth is significant. According to the above conclusions, it could qualitatively divide the gas working areas according to the geological structure and mapping information collected during the survey stage, and quantitatively divide the gas working areas according to the gas concentration test results. The final categorization of gas working areas can be determined by combining the qualitative and quantitative results. © 2022, Editorial Office of Modern Tunnelling Technology. All right reserved. 相似文献
5.
Planning and operating railway transportation systems is an extremely hard task due to the combinatorial complexity of the underlying discrete optimization problems, the technical intricacies, and the immense size of the problem instances. Because of that, however, mathematical models and optimization techniques can result in large gains for both railway customers and operators, e.g., in terms of cost reductions or service quality improvements. In the last years a large and growing group of researchers in the OR community have devoted their attention to this domain developing mathematical models and optimization approaches to tackle many of the relevant problems in the railway planning process. However, there is still a gap to bridge between theory and practice (e.g. Cacchiani et al., 2014; Borndörfer et al., 2010), with a few notable exceptions. In this paper we address three individual success stories, namely, long-term freight train routing (part I), mid-term rolling stock rotation planning (part II), and real-time train dispatching (part III). In each case, we describe real-life, successful implementations. We will discuss the individual problem setting, survey the optimization literature, and focus on particular aspects addressed by the mathematical models. We demonstrate on concrete applications how mathematical optimization can support railway planning and operations. This gives proof that mathematical optimization can support the planning of railway resources. Thus, mathematical models and optimization can lead to a greater efficiency of railway operations and will serve as a powerful and innovative tool to meet recent challenges of the railway industry. 相似文献
6.
From a capacity perspective, efficient utilization of a railway corridor has two main objectives; avoidance of schedule conflicts, and finding a proper balance between capacity utilization and level of service (LOS). There are several timetable tools and commercial rail simulation packages available to assist in reaching these objectives, but few of them offer both automatic train conflict resolution and automatic timetable management features for the different types of corridor configurations. This research presents a new rescheduling model to address some of the current limitations. The multi-objective linear programming (LP) model is called “Hybrid Optimization of Train Schedules” (HOTS), and it works together with commercial rail simulation tools to improve capacity utilization or LOS metrics. The HOTS model uses both conflict resolution and timetable compression techniques and is applicable to single-, double-, and multiple-track corridors (N-track networks), using both directional and bi-directional operations. This paper presents the approach, formulation and data requirements for the HOTS model. Single and multi-track case studies test and demonstrate the model’s train conflict resolution and timetable compression capabilities, and the model’s results are validated by using RailSys simulation package. The HOTS model performs well in each tested scenario, providing comparable results (either improved or similar) to the commercial packages. 相似文献
7.
In case of railway disruptions, traffic controllers are responsible for dealing with disrupted traffic and reduce the negative impact for the rest of the network. In case of a complete blockage when no train can use an entire track, a common practice is to short-turn trains. Trains approaching the blockage cannot proceed according to their original plans and have to short-turn at a station close to the disruption on both sides. This paper presents a Mixed Integer Linear Program that computes the optimal station and times for short-turning the affected train services during the three phases of a disruption. The proposed solution approach takes into account the interaction of the traffic between both sides of the blockage before and after the disruption. The model is applied to a busy corridor of the Dutch railway network. The computation time meets the real-time solution requirement. The case study gives insight into the importance of the disruption period in computing the optimal solution. It is concluded that different optimal short-turning solutions may exist depending on the start time of the disruption and the disruption length. For periodic timetables, the optimal short-turning choices repeat due to the periodicity of the timetable. In addition, it is observed that a minor extension of the disruption length may result in less delay propagation at the cost of more cancellations. 相似文献
8.
Decreasing the uncertainty in the lengths of railway disruptions is a major help to disruption management. To assist the Dutch Operational Control Center Rail (OCCR) during disruptions, we propose the Copula Bayesian Network method to construct a disruption length prediction model. Computational efficiency and fast inference features make the method attractive for the OCCR’s real-time decision making environment. The method considers the factors influencing the length of a disruption and models the dependence between them to produce a prediction. As an illustration, a model for track circuit (TC) disruptions in the Dutch railway network is presented in this paper. Factors influencing the TC disruption length are considered and a disruption length model is constructed. We show that the resulting model’s prediction power is sound and discuss its real-life use and challenges to be tackled in practice. 相似文献
9.
Railway transportation systems are important for society and have many challenging and important planning problems. Train services as well as maintenance of a railway network need to be scheduled efficiently, but have mostly been treated as two separate planning problems. Since these activities are mutually exclusive they must be coordinated and should ideally be planned together. In this paper we present a mixed integer programming model for solving an integrated railway traffic and network maintenance problem. The aim is to find a long term tactical plan that optimally schedules train free windows sufficient for a given volume of regular maintenance together with the wanted train traffic. A spatial and temporal aggregation is used for controlling the available network capacity. The properties of the proposed model are analyzed and computational experiments on various synthetic problem instances are reported. Model extensions and possible modifications are discussed as well as future research directions. 相似文献
10.
ERTMS is the standard railway control-command and signaling system which aims to ensure railway interoperability throughout Europe while enhancing safety and competitiveness. ERTMS is composed of two main subsystems which include GSM-R, a radio system for enabling communication between the train and the traffic management center and ETCS, an automatic train protection system (ATP) to replace the existing national ATP systems. The ERTMS specifications are defined by means of standard documents which set out the requirements ensuring interoperability. These documents evolve regularly to give rise to successive versions. The ERTMS/ETCS standard defines different levels and operation modes according to various trackside and onboard setups and some operational conditions. Given the complexity and the high criticality of railway operation, verification and validation (V&V) are crucial tasks in railway application development.In this paper, after setting the background and the motivations, a mechanizable formalization of a subset of ERTMS/ETCS specifications relative to ETCS modes and transitions is developed. The present work aims to offer a readily available model for formal V&V. Using formal techniques to check SRS is highly recommended to tackle the complexity of the defined requirements and prevent specification errors. Model-checking technique, which is targeted here, offers exhaustive analysis of the system behavior based on its model and is highly automated, since it is supported by software tools. Based on the last available version of SRS specifications, a progressive process is undertaken to get a formal model which makes explicit the various modes characterized by their respective active functions, as well as the numerous combinations of conditions for switching between modes. The various steps guiding the translation of the SRS literal specifications into a formal model are explained. As will be shown through different examples, the obtained model is a convenient basis to check safety, interoperability and liveness properties. 相似文献
11.
In order to select the correct mobility strategy, individuals’ choice behavior must be studied, and their reactions in response to strategies must be predicted. Upon exploring aspects subject to constraints, our results included walking distance, parking rates, search time and parking availability. We have identified scenarios in which simulation outputs of environmental parking mobility strategies differ significantly when using the Constrained Multi-Nominal Logit (CMNL) when compared with the widely used Multi-Nominal Logit (MNL). With the CMNL model growing in popularity, it is worth considering environmental mobility strategy repercussions in this context with the incorporation of relevant constraints. 相似文献
12.
13.
In recent years, railway stations have come to be seen as non-places within society, points of transit and nothing more. The role of the station in place making is disputed with stations seen as both creating and destroying a sense of place within a community. Our study is located within the railway stations of Scotland and explores how local communities have been empowered to reclaim, customise, and re-appropriate stations to simultaneously create a sense of place and better promote their community to the outside world. Drawing on ethnographic research we refute the notion that stations are somehow ‘placeless’. We show how through a process of legitimisation, a sense of ownership and appropriation of the station environment, communities are able to transform the station, improving hedonic value and recapturing a sense of place. 相似文献
14.
15.
中德铁路工程隧道技术标准对比分析研究 总被引:2,自引:0,他引:2
我国《铁路隧道标准规范》从1960年至今已形成了包括勘测设计、施工验收、养护维修和抢修抢建4类,基础标准、通用标准和专用标准3个层次共33个标准;德国《铁路标准规范》则由法令-适用标准-TSI(欧洲铁路网运行兼容性法规)组成,隧道标准属于适用标准中的专业规范(DS)系列,主要有3本。德国《规范》"以人为本、注重环保"的设计理念贯穿始终,体系完善,门类齐全,专业规范多是一些具体技术操作方面的规定,且内容详细具体,指导性非常强;我国《规范》标准体系也较完善且层次分明,但原则性的规定居多,对工作的指导作用较小。在限界及净空、荷载、初期支护、二次衬砌、防排水、防灾救援等具体指标方面,德国《规范》对列车气动压力及热效应、喷混凝土的早期强度、二次衬砌最大厚度、防裂钢筋、全封闭防水、防灾救援等都有详细具体的规定;我国《规范》则没有或者不完备,需要结合我国国情通过科学研究进一步完善提高。 相似文献
17.
18.
19.
拉之洞隧道是黔桂铁路扩能工程QG3标段新建重点工程项目之一,全长2 240 m,分别从进、出口同时掘进。2005年7月1日,当隧道从出口端掘进至DK174 610掌子面时,突然发生罕见的溶洞涌泥事故。在此次自然灾害处理中,进行了综合超前地质预报,采用炮震引泥、机械清泥综合处理措施清除了涌出的填充体;制作了钢结构防护台车(并兼做模板台车),浇筑了混凝土护拱,加强了防护设施的安全性和初期支护的强度及整体性。由于采用了一系列有效措施,隧道于12月10日安全通过了大型溶洞。文章介绍了拉之洞隧道溶洞涌泥概况及处理措施。 相似文献
20.
Assessing the technical efficiency, service effectiveness, and technical effectiveness of the world’s railways through NDEA analysis 总被引:1,自引:0,他引:1
This paper presents an approach to include both the unstorable feature of transportation service and the technological differences within railway companies in efficiency and effectiveness measurements. We explore efficiency and effectiveness for a group of 40 global railways in the year 2002, using traditional data development analysis (TDEA) and network data development analysis (NDEA). Comparing the results obtained from the NDEA model with those from the TDEA indicate that performance measures are quite different in terms of the magnitude, and even using different DEA type models to evaluate railway system performance does not distort the ranking of their performance. We also analyze the inter-related effects among three performance measures, finding that transportation service characteristics have positive effects on the evaluation of performance. Generally speaking, the NDEA model provides deeper insight regarding the sources of inefficiency and process-specific guidance to railway managers so as to help them improve their railway’s performance. 相似文献