首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到17条相似文献,搜索用时 62 毫秒
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
英文摘要     
《现代城市轨道交通》2009,(5):I0001-I0001
Technical Points and Revision in Implementation of GB 'Passenger Transport Service Marks of Urban Rail Transit',Comparison and Analysis of Transmission Techniques of Communication System in Urban Rail Transit ,Analysis on Setting Scheme of Control Center with Network Operation in Urban Rail Transit  相似文献   

12.
英文摘要     
《现代城市轨道交通》2009,(4):I0001-I0001
Discussion on Construction Planning of Test Line for Urban Train
Yu Hongpeng, Sun Ning, Guo Yiqing 2
Combining with the actual demand of test for urban train and the test results of the first train of Shenyang Metro Line 1 on loop test line of China Academy of Railway Sciences, the improvement and further construction planning points of test line are comprehensively presented.  相似文献   

13.
14.
英文摘要     
《铁道货运》2009,(11):I0001-I0001
Service System and Marketing Strategy of Railway Freight Transport
Guo Yu-hua (Bureau of Transport, MOR, Beijing 100844, China)
Abstract: By using theories of service system and service marketing system, the author analyzes railway freight service system and the railway freight marketing system, and also the strategy in railway freight marketing system. It is suggested that railway freight should establish the marketing strategy with comparative advantages of technical sources and organizational sources, and also the market development strategy that could convert source advantages into market power.  相似文献   

15.
16.
17.
《铁道货运》2014,(4):I0001-I0001
Through expounding the methods of Guiyang South Station transferring to full-process logistic service such as exerting transport market by transferring mechanism, integrating station with dedicated line as to create special market, trying to create brand of full-process transportation, and convoying loading and transportation by jointless connection and "front-shop and back workshop", based on analyzing "three obvious items" and "three deficiencies" existing in practice, this paper puts forward the measures of transferring to the full-process logistic service in further step, such as organizing self-supporting train fleet and mastering market initiative; optimizing price mechanism and adapting for market demand; well building logistic port depending on changed center; and increasing hardware level and strengthening the capacity of freight yard.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号