全文获取类型
收费全文 | 1391篇 |
免费 | 122篇 |
专业分类
公路运输 | 478篇 |
综合类 | 409篇 |
水路运输 | 282篇 |
铁路运输 | 281篇 |
综合运输 | 63篇 |
出版年
2024年 | 3篇 |
2023年 | 10篇 |
2022年 | 47篇 |
2021年 | 62篇 |
2020年 | 54篇 |
2019年 | 35篇 |
2018年 | 27篇 |
2017年 | 19篇 |
2016年 | 23篇 |
2015年 | 60篇 |
2014年 | 60篇 |
2013年 | 97篇 |
2012年 | 115篇 |
2011年 | 97篇 |
2010年 | 125篇 |
2009年 | 113篇 |
2008年 | 109篇 |
2007年 | 139篇 |
2006年 | 99篇 |
2005年 | 91篇 |
2004年 | 44篇 |
2003年 | 22篇 |
2002年 | 8篇 |
2001年 | 19篇 |
2000年 | 19篇 |
1999年 | 6篇 |
1998年 | 4篇 |
1997年 | 2篇 |
1995年 | 1篇 |
1993年 | 2篇 |
1988年 | 1篇 |
排序方式: 共有1513条查询结果,搜索用时 15 毫秒
21.
22.
23.
Bus Priority Using pre-signals 总被引:2,自引:0,他引:2
The need to provide efficient public transport services in urban areas has led to the implementation of bus priority measures in many congested cities. Much interest has recently centred on priority at signal controlled junctions, including the concept of pre-signals, where traffic signals are installed at or near the end of a with-flow bus lane to provide buses with priority access to the downstream junction. Although a number of pre-signals have now been installed in the U.K., particularly in London, there has been very little published research into their design, operation and optimisation. This paper addresses these points through the development of analytical procedures which allow pre-implementation evaluation of specific categories of pre-signals. The paper initially sets out three categories of pre-signal, which have different operating characteristics, different requirements for signalling and different impacts on capacity and delay. Key issues concerning signalling arrangements for these categories are then discussed, together with a summary of the analytical approach adopted and the assumptions required. Equations are developed to allow appropriate signal timings to be calculated for pre-signalised intersections. Further equations are then developed to enable delays to priority and non-priority traffic, with and without pre-signals, to be estimated with delay being taken here as the key performance criterion. The paper concludes with three application examples illustrating how the equations are applied and the impacts of pre-signals in different situations.The analyses confirm the potential benefits of pre-signals, where these signals apply to non-priority traffic only. Where buses are also subject to a pre-signal, it is shown that disbenefits to buses can often occur, unless bus detectors are used to gain priority signalling. 相似文献
24.
25.
26.
27.
通过对砼滑模摊铺机与人工小型机械施工砼路面的经济性进行比较,计算滑模摊铺机在不同里程施工时的最低台班进度,以及按8 a折旧推算其年生产规模和设备规费的提取额度. 相似文献
28.
南昌生米大桥总体设计 总被引:1,自引:0,他引:1
生米大桥是南昌市外环快速道上的城市桥梁,全长3880m,简要介绍生米大桥的项目概况、建设条件、总体布局、技术标准、技术特点、关键技术、科学研究等有关情况。 相似文献
29.
众所周知水下电磁环境复杂,在水下采用电缆传输电信号非常容易受到海洋电磁环境干扰,并且随着距离的增加,电信号受到干扰和衰减也就越大.因此水下中长距离的信号传输采用光电复合缆传输是一个比较好的选择,光纤用来传递水声信号,电缆用来传输电力.因此本文设计了一种基于光电复合缆的水声信号采集发射传输系统,能够很好地解决上述问题.本设计将要采集和发射的水声模拟信号在采集发射端和主机端转换成光信号,端到端之间的传输采用光信号,而采集发射端的供电则由光电复合缆的电缆提供. 相似文献
30.