排序方式: 共有92条查询结果,搜索用时 687 毫秒
51.
In this paper, Neural Networks (NNs) are used in the modeling of ship maneuvering motion. A nonlinear response model and a linear hydrodynamic model of ship maneuvering motion are also investigated. The maneuverability indices and linear non-dimensional hydrodynamic derivatives in the models are identified by using two-layer feed forward NNs. The stability of parametric estimation is confirmed. Then, the ship maneuvering motion is predicted based on the obtained models. A comparison between the predicted results and the model test results demonstrates the validity of the proposed modeling method. 相似文献
52.
53.
54.
55.
56.
船舶设计各专业之间的进度差距和信息沟通阻塞,会引起设计和生产的返工和大量修改,进而造成船舶建造进度脱期,降低船舶预舾装率。完整性建模是建立在船、机、电的并行设计的基础上,要求模、图、样信息交流顺畅,以实现设计专业之间的综合平衡。从理论上讲,完整性建模并非绝对完整,而是不断完善,动态平衡的过程,确保最终的设计达到综合平衡。目前广泛采用的TRIBON系统,可以将船装、机装、电装、舾装4大专业融合在一个平台内进行综合设计。合理利用TRIBON系统,还可以随时进行干涉检验,第一时间得到相关专业的设计更新信息,并据此及时对本专业设计进行修改,尽量减少专业间的设计差错。 相似文献
57.
为探究本构模型对浅埋隧道开挖诱发地表沉降规律的影响,考虑摩擦性与临界状态土体本构模型,对复合成层地层浅埋隧道开挖诱发的地表沉降槽进行了分析.首先,基于PlAXIS 3D有限元平台建立砂-黏复合地层浅埋隧道数值模型,材料模型选用3类本构模型(莫尔库伦(MC)、修正剑桥(MCC)、硬化小应变(HSS))及其组合模型;其次,利用参数等值转换关系,深入探讨了本构模型的选取对隧道开挖地表沉降槽宽度与深度的影响;最后,结合经验公式计算并对比分析,研究基于3类本构模型及其组合模型的沉降槽数值模拟与经验计算结果存在差异的原因.结果表明:上、下地层均采用HSS模型时,最大沉降量及沉降槽宽度与经验公式的计算结果吻合度较高,最大沉降量相差不超过7.3 mm;上、下地层均采用MC模型时,出现地表隆起的不合理现象;下卧地层采用MCC模型、上伏地层分别采用MC模型和HSS模型,即采用MC-MCC模型和HSS-MCC模型时,其数值预测的最大沉降量高于经验公式计算值,达24.8 mm,而沉降槽形状相对于经验公式预测结果“窄而陡”;在针对HSS模型的参数敏感性分析中发现,若卸载再加载模量与初始剪切模量变化值为5%,将导... 相似文献
58.
59.
60.
铁路建设项目沟通管理是项目工程利益相关者通过信息交流和传递进行沟通,从而建立思想和信息联系。通过对铁路建设项目沟通管理的全寿命周期性、沟通范围、沟通内容、以项目经理为核心的全要素沟通管理、沟通信息不对称性和沟通管理重要性的分析,提出建立沟通管理体系、选择沟通方式、主动沟通等方法和沟通基本原则。铁路建设项目沟通应采取制度化、发挥政府与非政府组织作用、注重利用大众媒体、加强铁路工程伦理建设等方式。 相似文献