首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   1953篇
  免费   2篇
公路运输   195篇
综合类   656篇
水路运输   676篇
综合运输   428篇
  2022年   4篇
  2021年   7篇
  2020年   8篇
  2019年   13篇
  2018年   335篇
  2017年   296篇
  2016年   255篇
  2015年   4篇
  2014年   10篇
  2013年   14篇
  2012年   59篇
  2011年   207篇
  2010年   218篇
  2009年   49篇
  2008年   179篇
  2007年   123篇
  2005年   52篇
  2004年   42篇
  2003年   57篇
  2002年   17篇
  2000年   1篇
  1992年   1篇
  1985年   1篇
  1981年   1篇
  1974年   2篇
排序方式: 共有1955条查询结果,搜索用时 0 毫秒
11.
The rate equations and the power evolution equations based on excited state absorption (ESA) and cooperative upconversion (CUC) of high concentration erbium-doped yttrium aluminum garnet (YAG) transparent ceramic waveguide amplifier are set up to analyze the effects of the pump power, active ion concentration and waveguide length on the amplifier gain and noise figure (NF). The numerical analysis predicts that with a pump power of 100mW, an active ion concentration of 1.0×1026 ion/m3 and a waveguide length of 3 cm, a small-signal gain of 30 dB and an NF of 5 dB can be achieved in the micro-chip amplifier.  相似文献   
12.
Since 2008 Kenya has distinguished itself in the global war against piracy by undertaking prosecutions in the national courts of suspected pirates arrested in the high seas and handed over by navies of leading maritime nations under bilateral agreements (MOUs) entered into between Kenya and these leading maritime nations. As of July 2011, Kenya had over 20 convicted pirates serving jail terms ranging between 7 and 20 years and over 100 suspected pirates awaiting trial in national courts. This is the largest number of suspected pirates held and tried in any one state at any given time in modern history. To achieve this, Kenya had to effect far reaching changes in the law. In the initial stages, suspected pirates were charged under Kenya’s Penal Code (Cap 63 Laws of Kenya). However, the high court in the case of Re Mohamud Mohamed Dashi and eight others [2010] eKLR, ruled that Kenya had no jurisdiction to try suspected pirates under that law. In September 2009, Kenya passed a new law (the Merchant Shipping Act), which not only defined more comprehensively and extensively the offence of piracy, but also extended the jurisdiction of Kenyan courts to try piracy committed by non-nationals. Though the law gives Kenya a very broad jurisdiction to try suspected pirates, the process is still fraught with challenges due to lack of financial and human resources. In the case of Republic vs Hassan Jama Haleys Alias Hassan Jamal and five others [2010] eKLR, the court commented thus:
“… I must note that the ‘piracy trials’ have presented a unique challenge to the Kenyan legal system. We cannot ignore the fact that these are suspects who having been arrested by foreign naval forces on the High Seas are brought to Kenya for trial. They are strangers in the country, do not understand the legal system, may not know what their rights are and do not understand the language… the Kenyan Government and the International partners supporting these trials put in place a system to provide free legal representation for the suspects…”  相似文献   
13.
In this study, collision and grounding data registered in GISIS (Global Integrated Shipping Information System) were investigated for oil tankers. The database includes the information of the collision and grounding accidents during the period between 1998 and 2010 in oil tankers. The risk assessments were carried out using fault tree analysis (FTA) programme for the incidents as collision and grounding occurred in oil tankers. In this study, we were able to investigate first the potential problems which cause the collision and grounding accidents have been determined, second, the occurrence of accidents has been shown with causal factors by the FTA method, and, finally, the significance degree of the initial events causing occurrence of accidents have been put forth. Collision in oil tanker resulted in economical loss (81%), pollution (6%) and death or injury (13%). Grounding in oil tanker resulted in economical loss (91%) and pollution (9%). According to the FTA results, the main reason for the accidents originating from human error is as follows: for collision accidents, Convention on the International Regulations for Preventing Collisions at Sea (COLREG) violation and the lack of communication between vessels; and for grounding accidents, the interpretation failure of the officer on watch and lack of communication in the bridge resource management.  相似文献   
14.
At present, the method of calculating the turbulent flow width around the bridge pier is not given in the "Standard for Inland River Navigation" (GB50139-2004) in China, and the bridge designer usually increases the bridge span in order to ensure the navigation safety, which increases both of the structural design difficulty and the project investments. Therefore, it is extremely essential to give a research on the turbulent flow width around the bridge pier. Through the experiments of the fixed bed and the mobile bed, the factors influencing the turbulent flow width around the bridge pier have been analyzed, such as the approaching flow speed, the water depth, the angles between the bridge pier and the flow direction, the sizes of bridge pier, the shapes of the bridge pier, and the scouring around the bridge pier, etc. Through applying the dimension analytic method to the measured data, the formula of calculating the turbulent flow width around the bridge pier is then inferred.  相似文献   
15.
Among all environmental forces acting on ocean structures and marine vessels, those resulting from wave impacts are likely to yield the highest loads. Being highly nonlinear, transient and complex, a theoretical analysis of their impact would be impossible without numerical simulations. In this paper, a pressure-split two-stage numerical algorithm is proposed based on Volume Of Fluid (VOF) methodology. The algorithm is characterized by introduction of two pressures at each half and full cycle time step, and thus it is a second-order accurate algorithm in time. A simplified second-order Godunov-type solver is used for the continuity equations. The method is applied to simulation of breaking waves in a 2-D water tank, and a qualitative comparison with experimental photo observations is made. Quite consistent results are observed between simulations and experiments. Commercially available software and Boundary Integral Method (BIM) have also been used to simulate the same problem. The results from present code and BIM are in good agreement with respect to breaking location and timing, while the results obtained from the commercial software which is only first-order accurate in time has clearly showed a temporal and spatial lag, verifying the need to use a higher order numerical scheme.  相似文献   
16.
Predicting damage to vibration isolators in a raft experiencing heavy shock loadings from explosions is an important task when designing a raft system. It is also vital to be able to research the vulnerability of heavily shocked floating rafts unreliable, especially when the allowable values The conventional approach to prediction has been or ultimate values of vibration isolators of supposedly uniform standard in a raft actually have differing and uncertain values due to defective workmanship. A new model for predicting damage to vibration isolators in a shocked floating raft system is presented in this paper. It is based on a support vector machine(SVM), which uses Artificial Intelligence to characterize complicated nonlinear mapping between the impacting environment and damage to the vibration isolators. The effectiveness of the new method for predicting damage was illustrated by numerical simulations, and shown to be effective when relevant parameters of the model were chosen reasonably. The effect determining parameters, including kernel function and penalty factors, has on prediction results is also discussed. It can be concluded that the SVM will probably become a valid tool to study damage or vulnerability in a shocked raft system.  相似文献   
17.
Based on published reports and direct observation, the common resources of landscape plant species in the Shanghai area were identified and studied in terms of the landscape characteristics of timing sequence changes over a one year time period. The results showed that there were 199 common landscape plant species in Shanghai, distributed in 67 families and 129 genera. These plants were categorized by three ornamental characteristics: flowers, foliage and fruits. The species were thus further analyzed according to the time periods which these characteristics were present. The results showed that flower ornamental distributed throughout the year, particularly from April to June, and plant species with colorful foliage could be seen every month, and particularly in November and December. On the other hand, few plant species with fruit ornamentals were observed in Shanghai area. The diversity of landscape timing sequence changes of the 199 plant species under examination was then analyzed by using the Shannon-Weiner and Simpson index formulas. The results showed that the higher diversity was observed in January, February and from August to October, while the lowest diversity was recorded from March to July and during November and December. The diversity of landscape characteristics of these plants was ranked according to foliage, flowers and fruit. Using this method, one park and one plant community were selected to evaluate the advantages and disadvantages of their time-changing plant landscape, with the goal of assessing the validity of the chosen ranking method. These results in the present study would be helpful to evaluate the plant landscape in a specified space and further enrich the diversity of plant and landscape by a target-oriented way.  相似文献   
18.
19.
In this paper, a numerical investigation of a float-over installation for an offshore platform is presented to verify the feasibility of the actual installation. The hydrodynamic performance of a T-barge is investigated in the frequency domain, and the coupled motions are analyzed in the time domain. We then compare with those of the model test and determine that the response amplitude operator and the time series agree quite well. The barge exhibits favorable hydrodynamic behavior in the considered sea state, and the equipment loads are allowable. The mooring system and sway fender forces are within the permissible range. Based on these results, we can verify that the actual installation of the offshore platform is feasible. We accurately simulated many important factors and effectively reduced the risk associated with the offshore installation, which is of great importance. As such, we demonstrate that the numerical simulation of the float-over installation for offshore platforms has practical engineering significance.  相似文献   
20.
This study evaluates the capability of the Simulating WAves Nearshore (SWAN) wave model (version 41.01) in predicting significant wave height and spectral peak energy content for swell waves in very shallow water of surf zone during depth-induced wave breaking and dissipation. The model results were compared with field measurements at five nearshore stations. The results demonstrated that some breaker index formulations were successful for significant wave height prediction in surf zones. However, an incorrect shape of the energy spectrum and overestimated near spectral peak energy content at shallow water stations were obtained using all of the embedded depth-induced wave breaking formulations in SWAN. The dependent breaker index on relative depth (Kpd) formulation, which was successful in predicting near spectral peak energy content, resulted in an average error of 30%. Finally, this formulation was modified to enhance the model performance in reproducing the spectral peak energy content.  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号