排序方式: 共有74条查询结果,搜索用时 0 毫秒
51.
单圣熊 《铁路工程造价管理》2013,28(1):56-58
我国电气化铁路建设从普速发展到高速,就接触网系统来说,设计和施工技术经历了3个阶段的质量提升,上了3个台阶,为施工技术达到国际一流水平奠定了基础。这都是由符合工程特点的施工工法、工艺及作业指导书作保障实现的。但在此前几年的高速铁路接触网施工中了解到,各施工单位编写的或执行的施工工艺及作业指导书,其工程分类和应包括的项目及内容不但不统一,而且有较大的差别,以致造成施工质量和精度不能保持在一个较高的水平上。为此结合高速铁路接触网设计对其施工工艺及作业指导书进行进一步阐析。 相似文献
52.
考察了不同培养条件对绿色木霉发酵生产纤维素酶的影响。结果表明,当以5.0 g/L硫酸盐纸浆作为碳源,纤维素酶活值为27.956 IU/mL,其值是以纤维素作为碳源时的2.19倍。当培养基中以2.0 g/L蛋白胨为唯一氮源时,纤维素酶值活可达58.461 IU/mL。当培养基中添加2.0 g/L葡萄糖,可以最大限度地提高纤维素酶的产量。另外,菌丝体的最佳接种量为10%。 相似文献
53.
54.
55.
56.
In this paper, a case study is carried out in Hong Kong for demonstration of the Transport Information System (TIS) prototype. A traffic flow simulator (TFS) is presented to forecast the short‐term travel times that can be served as a predicted travel time database for the TIS in Hong Kong. In the TFS, a stochastic deviation coefficient is incorporated to simulate the minute‐by‐minute fluctuation of traffic flows within the peak hour period. The purposes of the case study are: 1) to show the applicability of the TFS for larger‐scale road network; and 2) to illustrate the short‐term forecasting of path travel times in practice. The results of the case study show that the TFS can be applied to real network effectively. The predicted travel times are compared with the observed travel times on the selected paths for an OD pair. The results show that the observed path travel times fall in the 90% confidence interval of the predicted path travel times. 相似文献
57.
In contemporary times, Public–Private Partnership (PPP) in transport infrastructure has gained considerable attention in developing regions following its success in the developed countries. However, Sub-Saharan Africa (SSA) is among the developing regions with few transport PPP projects and among the regions with high number of failed projects. Meanwhile the region's transport infrastructure need far exceeds it current provision. This paper therefore aims to examine the project experiences (success and failure factors) of three highly profiled transport PPP projects, namely the Lekki toll road concession project (Nigeria), N4 toll road (South Africa/Mozambique) and Port of Maputo (Mozambique) in order to develop policy measures for effective future implementation. The experiences of the three projects show that transport PPP policy is indeed feasible in SSA. However, to realise its full applicability, proper policy actions and measures must be carefully observed and these include effective and efficient stakeholder management, transparent and competitive tendering process, high participation of local investors, stable macro-economic conditions and strong government commitment and regulatory framework. The projects experiences and policy actions developed are impactful in accelerating transport infrastructure development through PPP approach in SSA. Hence it is hoped that policy-makers and practitioners would be informed on the key strategies to employ in implementing future projects. 相似文献
58.
59.
行程时间的不确定性是影响货运车队路径选择的一个重要因素,特别是对于要求货物准时送达的配送任务(例如商品混凝土的配送),提出了在车辆调度中考虑由拥挤路段交通流量波动引起的行程时间不确定性的方法,建立了考虑行程时间可靠性要求的车辆优化调度数学模型,给出了相应的启发式算法,通过算例介绍了该模型和算法的应用。结果表明配送总成本随行程时间可靠性要求的提高而增加。 相似文献
60.
为实时优化定制公交线路,提出一种基于可靠性最短路的线路优化方法,在复杂的交通环境中,可以高效的将乘客送达目的地. 对可靠性最短路进行问题描述,建立可靠性时空网络;给出求解可靠性最短路的算法步骤,构建乘客和定制公交运营商总成本最小的目标函数,采用禁忌搜索算法对问题进行求解;最后,以某市定制公交路网进行实例分析. 结果表明:与最短路线路方案比较,所提方法更接近于实际运营;在高峰时段,交通拥堵的情况下,所提方法可以提高车辆的可靠性,提升定制公交线路的服务水平. 相似文献