排序方式: 共有157条查询结果,搜索用时 15 毫秒
61.
敞开式TBM断层破碎带脱困技术 总被引:3,自引:0,他引:3
某供水工程敞开式TBM掘进在穿越断层时发生坍塌,刀盘被掌子面坍塌体掩埋,护盾被压住,TBM被困。为安全、快速地使TBM脱困,迅速恢复生产,在脱困过程中首先加固已施工段支护,在保证后方安全的前提下,进行前方掌子面和护盾上部加固,采用化学注浆法固结刀盘前方围岩和护盾上方中管棚超前支护法进行围岩超前支护、加固,然后清除刀盘刮渣孔及切口环内虚渣,使TBM顺利脱困,总用时20.5 d。通过这些方法的使用,达到了TBM安全快速脱困,迅速恢复生产的目的。 相似文献
62.
63.
64.
65.
66.
In this paper, the route recommendation provided by the traffic management authority, rather than the uncontrollable bifurcation splitting rate, is directly considered as the control variable in the route guidance system; a real-time en-route diversion control strategy with multiple objectives is designed in a Model Predictive Control (MPC) framework with regard to system uncertainties and disturbances. The objectives include not only traffic efficiency, but also emission reduction and fuel economy, which respectively correspond to minimizing the total time spent (TTS), total amount of emissions and fuel consumption for all vehicles moving through a network. In the MPC framework, the routing control problem is transformed to be a constrained combinational optimization, which is solved by the parallel Tabu Search algorithm. Two representative traffic scenarios are tested, and the simulation results show: (1) The room for improvement in each objective by means of route diversion control is not consistent with each other and varies with the utilized traffic scenario. In the peak hour, the routing control can lead to significant improvements in TTS and fuel economy, while a relatively small improvement in emission reduction is achieved; in the off-peak hour, however, it is opposite, which indicates that routing is possibly dispensable from the aspect of improving traffic efficiency, but is required from the aspect of emission reduction. (2) The conflict among the multiple objectives varies with the utilized traffic scenario in route diversion control. Improving traffic efficiency often conflicts with emission reduction in both scenarios. For the objectives of traffic efficiency and fuel economy, they are not conflicting in peak hour, while in the off-peak hour, the two objectives are likely conflicting, and the improvement in one objective can lead to the degradation in the other objective. (3) Regardless of the scenarios of peak hour or off-peak hour, the proposed control strategy can result in a proper trade-off among the three chosen objectives. 相似文献
67.
锦屏二级电站1号引水隧洞采用TBM施工,配置有PPS激光导向系统,可实时监测TBM确切位置和掘进方向,为操作手提供TBM掘进方向与隧洞设计轴线之间的位置关系。根据PPS系统的定位原理,掌握PPs在TBM在掘进过程中产生偏差的原因,采取相应措施实施纠偏,可保证TBM掘进后隧洞实际轴线在设计允许的偏差范围之内,实现精确贯通。 相似文献
68.
长大隧洞弧形底拱衬砌施工,存在气泡、水泡难以排出,外观质量差的通病。通过对锦屏二级水电站1#引水隧洞弧形底拱衬砌的研究,介绍了针梁横向滑模台车的设计思路、结构组成、关键施工技术等,经过现场实际应用,该台车不仅能够保证衬砌施工质量,而且可以大大提高施工效率,具有一定的先进性。 相似文献
69.
娘拥水电站引水隧洞罕见的超高地温给隧洞施工增加了难度,岩石表面温度达58℃,涌水温度为82℃,爆破孔内温度为48~76℃。通过介绍隧洞降温系统、炮孔冷却循环系统等,总结和探讨了在高地温条件下的隧洞施工技术,从而保证了在高地温情况下隧洞的正常掘进。 相似文献
70.
从加快混凝土的凝结时间、一次喷射厚度、提高混凝土的抗压强度、与围岩的粘结强度等出发,运用多种试验方法并对施工工艺进行对比,采用水涨式锚杆及涨壳式锚杆外加钢筋网喷射纳米钢纤维混凝土施工工艺,为度过岩爆区提供了技术支持。 相似文献