全文获取类型
收费全文 | 1731篇 |
免费 | 63篇 |
专业分类
公路运输 | 355篇 |
综合类 | 676篇 |
水路运输 | 292篇 |
铁路运输 | 325篇 |
综合运输 | 146篇 |
出版年
2024年 | 5篇 |
2023年 | 6篇 |
2022年 | 15篇 |
2021年 | 31篇 |
2020年 | 37篇 |
2019年 | 21篇 |
2018年 | 24篇 |
2017年 | 32篇 |
2016年 | 31篇 |
2015年 | 49篇 |
2014年 | 101篇 |
2013年 | 138篇 |
2012年 | 148篇 |
2011年 | 162篇 |
2010年 | 106篇 |
2009年 | 136篇 |
2008年 | 149篇 |
2007年 | 166篇 |
2006年 | 176篇 |
2005年 | 79篇 |
2004年 | 47篇 |
2003年 | 35篇 |
2002年 | 32篇 |
2001年 | 32篇 |
2000年 | 11篇 |
1999年 | 7篇 |
1998年 | 6篇 |
1997年 | 1篇 |
1996年 | 4篇 |
1993年 | 1篇 |
1992年 | 1篇 |
1989年 | 3篇 |
1987年 | 1篇 |
1986年 | 1篇 |
排序方式: 共有1794条查询结果,搜索用时 171 毫秒
51.
The available highway alignment optimization algorithms use the total cost as the objective function. This is a single objective optimization process. In this process, travel‐time, vehicle operation accident earthwork land acquisition and pavement construction costs are the basic components of the total cost. This single objective highway alignment optimization process has limited capability in handling the cost components separately. Moreover, this process cannot yield a set of alternative solutions from a single run. This paper presents a multi‐objective approach to overcome these shortcomings. Some of the cost components of highway alignments are conflicting in nature. Minimizing some of them will yield a straighter alignment; whereas, minimizing others would make the alignment circuitous. Therefore, the goal of the multiobjective optimization approach is to handle the trade‐off amongst the highway alignment design objectives and present a set of near optimal solutions. The highway alignment objectives, i.e., cost functions, are not continuous in nature. Hence, a special genetic algorithm based multi‐objective optimization algorithm is suggested The proposed methodology is demonstrated via a case study at the end. 相似文献
52.
公路工程造价控制,是工程项目管理的重要内容。文章分析了在公路基本建设项目设计阶段控制工程造价的重要性,阐述了设计阶段工程造价控制的必要条件,提出了对公路基本建设项目工程造价进行有效控制的措施。 相似文献
53.
54.
55.
56.
PurposeIn Hot Mix Asphalt (HMA) overlays, the existing cracks in the underlying pavements can propagate upward to the new added overlay and may cause Reflective Cracks (RC). These cracks allow water infiltration to the underlying layers and causes further moisture damage as well as weakening the unbound layers. Over the years, several methods have been developed for mitigating the RCs. This study aims to investigate the current reflective cracking mitigation methods and develop a methodology for the selection of appropriate mitigation technique. The developed model is then applied to a case study in the state of Florida.MethodTo accomplish this goal, a nationwide literature review was conducted to better understand the current in practice methods in the United States. Moreover, a life cycle cost analysis (LCCA) in five different road types was performed to find the annuity of roadway rehabilitation for each of the mitigation methods. The uncertainty in the LCCA results is represented using Exploratory Modeling and Analysis (EMA) method. Then through a Multi Criteria Decision Making (MCDM) model, a stochastic optimization model was developed to find the appropriate reflective cracking mitigation solution under Florida’s climate and road conditions, based on different cost and performance weights.ResultsBased on the available data for the state of Florida, the LCCA results indicate that the annuity of maintaining the roadway with Fabrics and ISAC are lower compared to other methods. However, the results of stochastic optimization model reveal that while looking at the performance and cost at the same time, different methods would be more feasible. For instance, while the cost of the used method does not matter at all and only performance matters, STRATA® is more probable to be the appropriate mitigation technique. The findings of this research are critical for decision makers to better understand the most cost-effective mitigation technique in different conditions. 相似文献
57.
ABSTRACTA dynamic model for marginal cost pricing of port infrastructures links costs to system performance by combining a power-law function with time-dependent queueing analysis. Additionally, the model incorporates the marginal cost of capacity, including the effects of economies of scale. This allows the calculation of the marginal cost price under a dynamic framework. The model accounts for nonlinear behaviour of port demand, which is sensitive to price and service levels. The effects over time of cost and service levels on the port’s operational performance are quantified. The proposed model allows determining the optimal timing for capacity investment. The model is a starting point for the application of marginal cost pricing to ports. However, for practical application of such pricing method it is necessary to apply a system’s approach, as productivity and costs must be assessed at the terminal’s component level. This should allow the derivation of a marginal cost function at the terminal’s component level. 相似文献
58.
结合实际工程,在项目成本管理过程中,综合运用目标成本法和作业成本法,使项目成本分析做到全面、透彻,取得了良好的效果。 相似文献
59.
分析了现阶段公路工程建设造价投资控制现状及存在的问题,结合国外先进投资理念,针对决策阶段、建设阶段、运营阶段造价控制提出对策。根据国家交通运输"十二五"发展规划,提出了全寿命成本理念及交通建设节约资源、有效利用土地资源的新理念。 相似文献
60.
为降低港口企业成本,提高效益,对港口企业实施成本精细化管理.从树立成本精细化管理理念、建立成本控制工作机制、强化管理、坚持创新等4个方面阐述具体做法. 相似文献