全文获取类型
收费全文 | 1443篇 |
免费 | 46篇 |
专业分类
公路运输 | 270篇 |
综合类 | 467篇 |
水路运输 | 280篇 |
铁路运输 | 423篇 |
综合运输 | 49篇 |
出版年
2024年 | 3篇 |
2023年 | 3篇 |
2022年 | 26篇 |
2021年 | 34篇 |
2020年 | 32篇 |
2019年 | 24篇 |
2018年 | 14篇 |
2017年 | 26篇 |
2016年 | 29篇 |
2015年 | 42篇 |
2014年 | 105篇 |
2013年 | 88篇 |
2012年 | 112篇 |
2011年 | 138篇 |
2010年 | 94篇 |
2009年 | 76篇 |
2008年 | 92篇 |
2007年 | 128篇 |
2006年 | 136篇 |
2005年 | 74篇 |
2004年 | 60篇 |
2003年 | 37篇 |
2002年 | 32篇 |
2001年 | 43篇 |
2000年 | 13篇 |
1999年 | 6篇 |
1998年 | 1篇 |
1997年 | 3篇 |
1996年 | 4篇 |
1994年 | 2篇 |
1993年 | 3篇 |
1992年 | 2篇 |
1991年 | 1篇 |
1989年 | 4篇 |
1988年 | 1篇 |
1984年 | 1篇 |
排序方式: 共有1489条查询结果,搜索用时 15 毫秒
1.
In many cities, diesel buses are being replaced by electric buses with the aim of reducing local emissions and thus improving air quality. The protection of the environment and the health of the population is the highest priority of our society. For the transport companies that operate these buses, not only ecological issues but also economic issues are of great importance. Due to the high purchase costs of electric buses compared to conventional buses, operators are forced to use electric vehicles in a targeted manner in order to ensure amortization over the service life of the vehicles. A compromise between ecology and economy must be found in order to both protect the environment and ensure economical operation of the buses.In this study, we present a new methodology for optimizing the vehicles’ charging time as a function of the parameters CO2eq emissions and electricity costs. Based on recorded driving profiles in daily bus operation, the energy demands of conventional and electric buses are calculated for the passenger transportation in the city of Aachen in 2017. Different charging scenarios are defined to analyze the influence of the temporal variability of CO2eq intensity and electricity price on the environmental impact and economy of the bus. For every individual day of a year, charging periods with the lowest and highest costs and emissions are identified and recommendations for daily bus operation are made. To enable both the ecological and economical operation of the bus, the parameters of electricity price and CO2 are weighted differently, and several charging periods are proposed, taking into account the priorities previously set. A sensitivity analysis is carried out to evaluate the influence of selected parameters and to derive recommendations for improving the ecological and economic balance of the battery-powered electric vehicle.In all scenarios, the optimization of the charging period results in energy cost savings of a maximum of 13.6% compared to charging at a fixed electricity price. The savings potential of CO2eq emissions is similar, at 14.9%. From an economic point of view, charging between 2 a.m. and 4 a.m. results in the lowest energy costs on average. The CO2eq intensity is also low in this period, but midday charging leads to the largest savings in CO2eq emissions. From a life cycle perspective, the electric bus is not economically competitive with the conventional bus. However, from an ecological point of view, the electric bus saves on average 37.5% CO2eq emissions over its service life compared to the diesel bus. The reduction potential is maximized if the electric vehicle exclusively consumes electricity from solar and wind power. 相似文献
2.
将由特定高铁列车所提供的起讫点间的旅客运输服务定义为单个高铁客运产品。随着高速铁路越来越"公交化",同一起讫点间客运产品间的可替代性越来越强,票价的调整有了更精细化的要求。用经济学中的交叉弹性理论描述客运产品间的可替代程度,用指数需求函数描述客运产品的需求与票价的关系,构建并求解高铁动态票价优化模型,对客运产品间不同可替代程度下的最优动态票价策略进行研究。结果显示:高铁客运产品间的可替代性会影响票价策略的选择,且客运产品间可替代程度的增加是否有利于客票收益的提高与可行折扣票价集合的选取有关。 相似文献
3.
4.
通过对我国公路工程监理和国际惯例的比较,指出了我国公路工程监理机制与国际惯例的差距,并提出了解决问题的建议。 相似文献
5.
胡志军 《电力机车与城轨车辆》2006,(3)
文章分析了装用抱轮缘铸铁闸瓦的O′ZBEKISTON型机车用单元制动器的研制技术难点,通过理论分析提出了解决方案。型式试验及线路运行实践证明该单元制动器能够满足O′ZBEKISTON型机车的运用要求。 相似文献
6.
工程总承包是目前国际上流行的项目管理模式。铁路建设推行施工图设计-施工总承包模式,实现业主与总承包商签订施工图设计和施工合同,施工图设计和施工同时进行,统筹安排和优化,总体控制项目造价。推进铁路建设施工图设计-施工总承包模式,国家及铁道部应建立和完善有关的法律法规与规章,借鉴国内外经验,使工程总承包模式更加规范化、标准化、多样化。 相似文献
7.
地铁屏蔽门系统构成分析 总被引:2,自引:0,他引:2
文章较详细地介绍了广州地铁使用的屏蔽门系统,重点是它的机械和电气部分的组成和作用. 相似文献
8.
马淑文 《铁路工程造价管理》2001,16(2):4-6
通过复核工程数量、合理计算运杂费和灵活编制补充单价,以及在认真检查计算过程中存在的问题等方面,简述提高报价内涵质量. 相似文献
9.
10.