排序方式: 共有88条查询结果,搜索用时 46 毫秒
22.
23.
24.
The strata of Chengershan tunnel is mainly consist of the slightly cemented tertiary sandstone, the tun⁃ nel body passes through F 2 fault core zone. Geological disasters of mud outburst, sand gushing and extrusion of work face occurred several times during tunnel construction, so the risks are very high. In view of the core zone of F 2 fault with high pressure and abundant water, a variety of construction schemes were compared and analyzed in terms of technology, feasibility and safety, and vertical freezing technique was used for stratum reinforcement in the railway tunnel for the first time, furthermore the freezing scheme and tunnel support measures were studied, providing refer⁃ ence and guidance for similar tunnel construction.Mountain railway tunnel; Fault zone; Tertiary sandstone; Vertical freezing technique; Application © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved. 相似文献
25.
山区河流的航行条件相对恶劣,如发生船舶失事事故,难以开展有效的搜救及协调工作。文章针对山区河流特点和船舶失事特点,分析了山区河流流域船舶航行的安全隐患,并从多方面探讨了加强山区河流船舶搜救工作的措施。 相似文献
26.
通过对地下水渗流场的理论分析,结合宜万线齐岳山隧道高水压富水地段现场具体处理情况,得出高水压富水隧道设计应注意的主要原则:"以堵为主,限量排放"是高水位富水隧道设计应遵循的基本原则,限量标准应根据隧道区域内具体情况类比确定;地层注浆是实现限量排放的主要方式,确定注浆加固圈范围时应确保注浆帷幕体自身的稳定;排水系统是衬砌结构设计中不可缺少的一部分,在完善可靠的排水系统下,衬砌结构承受的外水荷载能较大幅度地进行折减。 相似文献
27.
研究目的:本文根据作者在北天山越岭隧道的工作经历,对北天山越岭隧道调绘和勘察全过程进行了总结,并阐述了自己的亲身体会,对工作中出现的一些问题提出了自己的一些看法。研究方法:在越岭隧道的勘察过程中,广泛采用了先进有效的技术手段,以遥感技术指导地面的调绘工作,通过综合物探,配合适量的钻探验证,以查明隧道通过区的地质及水文地质条件,通过钻孔内的地应力测试及综合水文测井,并取得相应的地质及水文地质参数;通过对泉水流量的测定,为隧道涌水量的预测提供了依据,并通过取样进行化学分析及氚分析,查明了地下水的补、径、排关系;通过水文地质计算,预测隧道的涌水量。研究结果:经过综合勘察,查明了隧道通过区的地层岩性、地质构造及地层的富水情况,取得了相应的水文地质参数,为隧道的设计及施工提供了依据。研究结论:通过对北天山越岭隧道的勘察,进一步认识了多种技术手段相结合的必要性,也充分意识到了水文地质工作在深埋长大隧道勘察中的重要性。但同时在工作中也发现了一些问题,通过经验总结提高了认识。 相似文献
28.
通过对辽宁省东部项目鹤岗至大连国家高速公路桓仁(辽吉界)至丹东(古城子)段前期工作的研究,重点分析项目影响区内高速公路线形设计、环境保护、可持续发展等主要问题,提出山岭区高速公路设计新理念. 相似文献
29.
30.