排序方式: 共有211条查询结果,搜索用时 328 毫秒
111.
深层搅拌桩隔离墙应用于软基高速公路扩建工程的数值分析 总被引:2,自引:1,他引:2
以某绕城公路扩建工程为背景,采用二维弹塑性有限单元法分析了采用深层搅拌桩隔离墙处理扩建部分软基的适宜性。分析结果表明深层搅拌桩隔离墙的加固方案是可行的,并且综合考虑施工可行性、成本经济性等,提出了适宜的墙体宽度、强度要求及其墙体的最佳设置位置。 相似文献
112.
基于地基固结理论,提出了考虑地基加固区下卧层修正的沉降资料反演固结系数的计算方法。结合通启高速公路沉降资料,反算出固结系数,相对室内固结试验成果高出1~2个数量级。并应用于计算路基沉降,与实验室测得的固结系数计算的沉降曲线进行对比和分析,得出了一些结论和建议。 相似文献
113.
通过进行配合比设计以及系统的试验对粒料石灰土结构的物理力学性能进行分析与评定,为粒料石灰土结构处理软土路基的推广与应用提供可靠的理论依据. 相似文献
114.
In a perspective of modern tunnelling philosophy, some problems on conventional tunnelling in soft rock mass were discussed. The development process of rock mechanical behavior and deformation caused by excava⁃ tion is attributed to the change course from yielding to discrete. Some effective control means were presented as well and the effect of advanced support system was evaluated. As to the deformation controlling technology for squeezing ground, the theory and design principle of yielding support system were introduced. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved. 相似文献
115.
桥梁灌注桩施工过程中偶尔会有孤石出现, 为避免其给工程带来的安全隐患,介绍了对疑似孤石的判别方法,并结合宁波地区经验分析了常见的孤石处理方案对软土地区的适用性. 相似文献
116.
以辽宁(营口)沿海产业基地民生路大桥建设为依托,阐述了满堂式支架现浇箱梁施工中软土地基处理、碗扣式支架及连续箱梁的施工工艺与施工方法. 相似文献
117.
118.
119.
为了在越野行驶车辆平顺性仿真系统中实时动态反映车辆的振动特性,提出了基于小波变换的松软越野路面突变性描述方法并分析突变性对车辆垂向振动的影响。通过小波变换对路面奇异点进行测定和定位,把越野车辆平顺性仿真系统看作是在有限时间内受到随机载荷激励的动力系统,分析其受路面突变载荷的车辆的垂直振动响应方差。结果表明,小波变换能较准确地判定路面奇异点并对其定位,可为越野车辆平顺性虚拟测试系统提供路面随机输入。 相似文献
120.
Research purposes: The statistics for tunnel disasters showed that the quantities and casualties of tunnel collapse are much higher than other tunnel disasters. Achieved warning before collapse in tunnel construction, can greatly reduce the tunnel collapse hazards. The key to achieve anti-collapse warning in soft and weak surrounding rock tunnel is to obtain anti-collapse warning standards. Therefore, it is necessary to study tunnel anti-collapse warning standards to guide safe tunnel construction. Research conclusions: (1) Deformation of the tunnel is relevant to hydrogeological conditions, construction method, construction progress and other factors. Currently, the standard values in criterion were not suitable for tunnel collapse warning. (2) It is practicable to achieve anti-collapse monitoring by relative deformation, because anti-collapse real-time monitoring focused on dome relative deformation differently from routine monitoring in soft and weak surrounding rock tunnel. (3) The reference value of tunnel anti-collapse real-time monitoring is determined by displacement limit value in criterion, the maximum value of the measured displacement in similar project and the measured data in tunnel project. (4) The field experiment indicated that the reference value could meet tunnel anti-collapse warning. Therefore, the research results can be applied to large cross-section tunnel of soft and weak surrounding rock. 相似文献