全文获取类型
收费全文 | 407篇 |
免费 | 19篇 |
专业分类
公路运输 | 125篇 |
综合类 | 145篇 |
水路运输 | 88篇 |
铁路运输 | 48篇 |
综合运输 | 20篇 |
出版年
2024年 | 4篇 |
2023年 | 4篇 |
2022年 | 7篇 |
2021年 | 12篇 |
2020年 | 17篇 |
2019年 | 7篇 |
2018年 | 10篇 |
2017年 | 8篇 |
2016年 | 10篇 |
2015年 | 18篇 |
2014年 | 34篇 |
2013年 | 26篇 |
2012年 | 42篇 |
2011年 | 41篇 |
2010年 | 23篇 |
2009年 | 26篇 |
2008年 | 25篇 |
2007年 | 34篇 |
2006年 | 30篇 |
2005年 | 18篇 |
2004年 | 9篇 |
2003年 | 6篇 |
2002年 | 2篇 |
2001年 | 4篇 |
2000年 | 3篇 |
1999年 | 1篇 |
1998年 | 2篇 |
1995年 | 1篇 |
1992年 | 1篇 |
1991年 | 1篇 |
排序方式: 共有426条查询结果,搜索用时 781 毫秒
51.
One of the fundamental problems in parallel and distributed systems is deciding how to allocate jobs to processors. The goals of job scheduling in a parallel environment are to minimize the parallel execution time of a job and try to balance the user‘s desire with the system‘s desire. The users always want their jobs be completed as quickly as possible, while the system wants to service as many jobs as possible. In this paper, a dynamic job-scheduling algorithm was introduced. This algorithm tries to utilize the information of a practical system to allo-cate the jobs more evenly. The communication time between the processor and scheduler is overlapped with the computation time of the processor. So the communication overhead can he little. The principle of scheduling the job is based on the desirability of each processor. The scheduler would not allocate a new job to a processor that is already fully utilized. The execution efficiency of the system will he increased. This algorithm also can he reused in other complex algorithms. 相似文献
52.
53.
54.
随着科技进步,长大隧道越来越多,而长大隧道不良地质灾害多,造成喷射混凝土开裂、掉块、脱落,钢架扭曲、弯折、下沉等初期支护变形,导致二次衬砌厚度不够或直接侵入隧道净空,须对初期支护变形进行处理。某隧道最大变形668 mm,通过横向钢支撑、径向注浆加固、刻槽拆换变形支护等措施,成功完成隧道初期支护大变形处理。 相似文献
55.
With the increase of link rate, the arbitrator of centralized switch fabric becomes too complicated to implement. A parallel switch fabric based on crossbar, named as PSFBC (Parallel Switch Fabric Based on Crossbar), has been proposed in this paper. PSFBC is composed of k switches whose rate is 1/k of link, these switches exchange cells in parallel; this increases the arbitrator's period and make it easy to implement. Load is evenly distributed to each switch with FCFS (First Come First Serve) rule, it can keep the order of cells in one stream. A multi-class queue scheduling policy is used in PSFBC to ensure the quality of realtime streams. Experiments show that the load on each switch in PSFBC is well balanced, its average delay of cells is little and its performance is very close to centralized switch; and with the increase of number of parallel switches, the loss of PSFBC's performance keeps very small, it becomes easier to implement. 相似文献
56.
反射波初至时刻判断中的信号对比法 总被引:1,自引:0,他引:1
在地表波动测试中,若不考虑上部岩层不均匀性,与发射点距离相等的测点上测得的振动信号理应吻合,而当某测点最先有节理面反射纵波传播至时,其振动信号就与其它测点振动信号发生偏离,故可通过信号对比判断出该测点处节理反射波初至时刻,该方法应用于实测信号,判断出的节理反射波初至时刻误差<1%. 相似文献
57.
58.
响应时间是描述数据链网络实时性以及分析网络能否满足作战要求的重要指标,其大小与分配的时隙数量有关。文章针对随机性消息的特点,运用排队论研究了时分多址数据链网络满足实时性要求的时隙需求,并构建了作战平台消息的产生、排队等候及发送过程的仿真模型。结果表明,理论计算与仿真结果得到的平均响应时间基本吻合,但仿真显示,不同消息的响应时间相差较大,有些消息甚至不能满足作战要求。所以,时隙需求数量必须进行仿真验证并据此进行调整,以获得最佳的分配方案。文章给出的时隙需求分析理论及仿真平台能用于数据链网络设计及仿真验证工作。 相似文献
59.
路段交通流动态加载是动态交通网络分配模型中的重要组成部分,在路段交通流动态加载中,离散形式或者连续形式的点排队模型被广泛使用.本文在以往研究的基础上,提出基于流体逼近的连续型点排队模型,克服了原有点排队模型中排队负值的情况.通过分析可以发现,原有点排队模型实质上属于具有单一服务台和无限容量的排队模型,基于流体逼近的思想重新定义了原有点排队模型.其中3 个主要部分是流量守恒模型,车辆流出模型和时间相关的服务台模型,这3 个模型全部都是连续的.由于连续点排队对计算需求较高,本文将连续的排队模型离散化,模拟了3 种不同场景下车辆驶出、路段排队情况.本文模型克服了原有点排队中的负排队现象,并且排队过程满足先进先出的原则,模型具有良好的模拟效果. 相似文献
60.