全文获取类型
收费全文 | 2123篇 |
免费 | 83篇 |
专业分类
公路运输 | 1202篇 |
综合类 | 578篇 |
水路运输 | 144篇 |
铁路运输 | 166篇 |
综合运输 | 116篇 |
出版年
2023年 | 10篇 |
2022年 | 30篇 |
2021年 | 62篇 |
2020年 | 73篇 |
2019年 | 38篇 |
2018年 | 27篇 |
2017年 | 38篇 |
2016年 | 44篇 |
2015年 | 92篇 |
2014年 | 203篇 |
2013年 | 114篇 |
2012年 | 201篇 |
2011年 | 241篇 |
2010年 | 184篇 |
2009年 | 141篇 |
2008年 | 139篇 |
2007年 | 174篇 |
2006年 | 154篇 |
2005年 | 96篇 |
2004年 | 43篇 |
2003年 | 20篇 |
2002年 | 11篇 |
2001年 | 31篇 |
2000年 | 11篇 |
1999年 | 6篇 |
1998年 | 6篇 |
1997年 | 6篇 |
1995年 | 3篇 |
1994年 | 3篇 |
1993年 | 1篇 |
1991年 | 2篇 |
1988年 | 1篇 |
1987年 | 1篇 |
排序方式: 共有2206条查询结果,搜索用时 359 毫秒
11.
Bus Priority Using pre-signals 总被引:2,自引:0,他引:2
The need to provide efficient public transport services in urban areas has led to the implementation of bus priority measures in many congested cities. Much interest has recently centred on priority at signal controlled junctions, including the concept of pre-signals, where traffic signals are installed at or near the end of a with-flow bus lane to provide buses with priority access to the downstream junction. Although a number of pre-signals have now been installed in the U.K., particularly in London, there has been very little published research into their design, operation and optimisation. This paper addresses these points through the development of analytical procedures which allow pre-implementation evaluation of specific categories of pre-signals. The paper initially sets out three categories of pre-signal, which have different operating characteristics, different requirements for signalling and different impacts on capacity and delay. Key issues concerning signalling arrangements for these categories are then discussed, together with a summary of the analytical approach adopted and the assumptions required. Equations are developed to allow appropriate signal timings to be calculated for pre-signalised intersections. Further equations are then developed to enable delays to priority and non-priority traffic, with and without pre-signals, to be estimated with delay being taken here as the key performance criterion. The paper concludes with three application examples illustrating how the equations are applied and the impacts of pre-signals in different situations.The analyses confirm the potential benefits of pre-signals, where these signals apply to non-priority traffic only. Where buses are also subject to a pre-signal, it is shown that disbenefits to buses can often occur, unless bus detectors are used to gain priority signalling. 相似文献
12.
13.
Transit signal priority (TSP) may be combined with road-space priority (RSP) measures to increase its effectiveness. Previous studies have investigated the combination of TSP and RSP measures, such as TSP with dedicated bus lanes (DBLs) and TSP with queue jump lanes (QJLs). However, in these studies, combined effects are usually not compared with separate effects of each measure. In addition, there is no comprehensive study dedicated to understanding combined effects of TSP and RSP measures. It remains unclear whether combining TSP and RSP measures creates an additive effect where the combined effect of TSP and RSP measures is equal to the sum of their separate effects. The existence of such an additive effect would suggest considerable benefits from combining TSP and RSP measures. This paper explores combined effects of TSP and RSP measures, including TSP with DBLs and TSP with QJLs. Analytical results based on time-space diagrams indicate that at an intersection level, the combined effect on bus delay savings is smaller than the additive effect if there is no nearside bus stop and the traffic condition in the base case is under-saturated or near-saturated. With a near-side bus stop, the combined effect on bus delay savings at an intersection level can be better than the additive effect (or over-additive effect), depending on dwell time, distance from the bus stop to the stop line, traffic demand, and cycle length. In addition, analytical results suggest that at an arterial level, the combined effect on bus delay savings can be the over-additive effect with suitable signal offsets. These results are confirmed by a micro-simulation case study. Combined effects on arterial and side-street traffic delays are also discussed. 相似文献
14.
Bus fuel economy is deeply influenced by the driving cycles, which vary for different route conditions. Buses optimized for a standard driving cycle are not necessarily suitable for actual driving conditions, and, therefore, it is critical to predict the driving cycles based on the route conditions. To conveniently predict representative driving cycles of special bus routes, this paper proposed a prediction model based on bus route features, which supports bus optimization. The relations between 27 inter-station characteristics and bus fuel economy were analyzed. According to the analysis, five inter-station route characteristics were abstracted to represent the bus route features, and four inter-station driving characteristics were abstracted to represent the driving cycle features between bus stations. Inter-station driving characteristic equations were established based on the multiple linear regression, reflecting the linear relationships between the five inter-station route characteristics and the four inter-station driving characteristics. Using kinematic segment classification, a basic driving cycle database was established, including 4704 different transmission matrices. Based on the inter-station driving characteristic equations and the basic driving cycle database, the driving cycle prediction model was developed, generating drive cycles by the iterative Markov chain for the assigned bus lines. The model was finally validated by more than 2 years of acquired data. The experimental results show that the predicted driving cycle is consistent with the historical average velocity profile, and the prediction similarity is 78.69%. The proposed model can be an effective way for the driving cycle prediction of bus routes. 相似文献
15.
A smart design of transport systems involves efficient use and allocation of the limited urban road capacity in the multimodal environment. This paper intends to understand the system-wide effect of dividing the road space to the private and public transport modes and how the public transport service provider responds to the space changes. To this end, the bimodal dynamic user equilibrium is formulated for separated road space. The Macroscopic Fundamental Diagram (MFD) model is employed to depict the dynamics of the automobile traffic for its state-dependent feature, its inclusion of hypercongestion, and its advantage of capturing network topology. The delay of a bus trip depends on the running speed which is in turn affected by bus lane capacity and ridership. Within the proposed bimodal framework, the steady-state equilibrium traffic characteristics and the optimal bus fare and service frequency are analytically derived. The counter-intuitive properties of traffic condition, modal split, and behavior of bus operator in the hypercongestion are identified. To understand the interaction between the transport authority (for system benefit maximization) and the bus operator (for its own benefit maximization), we examine how the bus operator responds to space changes and how the system benefit is influenced with the road space allocation. With responsive bus service, the condition, under which expanding bus lane capacity is beneficial to the system as a whole, has been analytically established. Then the model is applied to the dynamic framework where the space allocation changes with varying demand and demand-responsive bus service. We compare the optimal bus services under different economic objectives, evaluate the system performance of the bimodal network, and explore the dynamic space allocation strategy for the sake of social welfare maximization. 相似文献
16.
17.
公交车能耗碳排放强度与车辆、线路和驾驶员有显著相关关系,为精准刻画其能耗碳排放强度特征,整合OBD监测数据、加油(气)数据、运营排班数据等多源数据资源. OBD监测数据和加油(气)数据呈显著的线性关系,证明修正后的OBD监测数据可满足分析要求. 搭建“速度-能耗碳排放强度曲线”测算模型,幂函数关系的拟合优度R2 =0.972 6 为最高. 实证研究发现,平均速度在10~60 km/h 变化时,液化天然气(LNG)车比柴油车能耗碳排放强度高 3.3%~33.7%,双层车比铰接车高2.4%~13.3%;LNG铰接车在不同线路、相同速度下的强度相差9.6%;不同驾驶员在相同线路的能耗碳排放强度可相差24.2%. 模型为各城市基于多源数据开展公交能耗碳排放目标设定提供数据支撑. 相似文献
18.
This study investigates the cost competitiveness of different types of charging infrastructure, including charging stations, charging lanes (via charging-while-driving technologies) and battery swapping stations, in support of an electric public transit system. To this end, we first establish mathematical models to investigate the optimal deployment of various charging facilities along the transit line and determine the optimal size of the electric bus fleet, as well as their batteries, to minimize total infrastructure and fleet costs while guaranteeing service frequency and satisfying the charging needs of the transit system. We then conduct an empirical analysis utilizing available real-world data. The results suggest that: (1) the service frequency, circulation length, and operating speed of a transit system may have a great impact on the cost competitiveness of different charging infrastructure; (2) charging lanes enabled by currently available inductive wireless charging technology are cost competitive for most of the existing bus rapid transit corridors; (3) swapping stations can yield a lower total cost than charging lanes and charging stations for transit systems with high operating speed and low service frequency; (4) charging stations are cost competitive only for transit systems with very low service frequency and short circulation; and (5) the key to making charging lanes more competitive for transit systems with low service frequency and high operating speed is to reduce their unit-length construction cost or enhance their charging power. 相似文献
19.
以哈尔滨市104路公交为主要研究对象,详细介绍城市公交的GPS轨迹路线图制作时所需的软硬件,以及数据的采集方法,叙述数据的整合与分类过程。通过将主要公交站点周围兴趣点信息增添到轨迹点附近,构成包含有站点轨迹信息、站点影像信息的沿途轨迹信息。经过整合与分类,通过HOLUX ezTour软件对数据进行处理,阐述轨迹查询、地标的新增与删改和轨迹的添加与变换等功能。并使用Google Earth三维图像对轨迹路线全面整合,最终制作成城市公交GPS轨迹路线图。 相似文献
20.
LonWorks分布式控制网络技术在轨道列车中的应用 总被引:1,自引:1,他引:0
LonWorks作为一种成熟的控制网络技术,己在列车通信网络中得到广泛的应用,但因不能实现自动编组,且与车辆总线的连接也有问题,使其运用受到限制。现提出了初步解决方案,并通过实验进行了验证。 相似文献