全文获取类型
收费全文 | 376篇 |
免费 | 5篇 |
专业分类
公路运输 | 35篇 |
综合类 | 34篇 |
水路运输 | 155篇 |
铁路运输 | 88篇 |
综合运输 | 69篇 |
出版年
2024年 | 3篇 |
2023年 | 14篇 |
2022年 | 2篇 |
2021年 | 17篇 |
2020年 | 22篇 |
2019年 | 15篇 |
2018年 | 17篇 |
2017年 | 20篇 |
2016年 | 24篇 |
2015年 | 20篇 |
2014年 | 18篇 |
2013年 | 20篇 |
2012年 | 22篇 |
2011年 | 29篇 |
2010年 | 24篇 |
2009年 | 12篇 |
2008年 | 12篇 |
2007年 | 8篇 |
2006年 | 21篇 |
2005年 | 17篇 |
2004年 | 5篇 |
2003年 | 5篇 |
2002年 | 3篇 |
2001年 | 13篇 |
2000年 | 6篇 |
1999年 | 1篇 |
1998年 | 4篇 |
1997年 | 5篇 |
1995年 | 2篇 |
排序方式: 共有381条查询结果,搜索用时 15 毫秒
11.
文章以新寨河特大桥主墩承台施工为例,介绍了大体积混凝土施工的质量控制要点、施工工艺及质量保障措施,并重点讲述了大体积混凝土在施工中,如何预防因温度应力而引起混凝土开裂的温度监测措施。 相似文献
12.
Big data from floating cars supply a frequent, ubiquitous sampling of traffic conditions on the road network and provide great opportunities for enhanced short-term traffic predictions based on real-time information on the whole network. Two network-based machine learning models, a Bayesian network and a neural network, are formulated with a double star framework that reflects time and space correlation among traffic variables and because of its modular structure is suitable for an automatic implementation on large road networks. Among different mono-dimensional time-series models, a seasonal autoregressive moving average model (SARMA) is selected for comparison. The time-series model is also used in a hybrid modeling framework to provide the Bayesian network with an a priori estimation of the predicted speed, which is then corrected exploiting the information collected on other links. A large floating car data set on a sub-area of the road network of Rome is used for validation. To account for the variable accuracy of the speed estimated from floating car data, a new error indicator is introduced that relates accuracy of prediction to accuracy of measure. Validation results highlighted that the spatial architecture of the Bayesian network is advantageous in standard conditions, where a priori knowledge is more significant, while mono-dimensional time series revealed to be more valuable in the few cases of non-recurrent congestion conditions observed in the data set. The results obtained suggested introducing a supervisor framework that selects the most suitable prediction depending on the detected traffic regimes. 相似文献
13.
In this paper, we study two closely related airline planning problems: the robust weekly aircraft maintenance routing problem (RWAMRP) and the tail assignment problem (TAP). In real life operations, the RWAMRP solution is used in tactical planning whereas the TAP solution is implemented in operational planning. The main objective of these two problems is to minimize the total expected propagated delay (EPD) of the aircraft routes. To formulate the RWAMRP, we propose a novel weekly line-of-flights (LOF) network model that can handle complex and nonlinear cost functions of EPD. Because the number of LOFs grows exponentially with the number of flights to be scheduled, we propose a two-stage column generation approach to efficiently solve large-scale real-life RWAMRPs. Because the EPD of an LOF is highly nonlinear and can be very time-consuming to accurately compute, we propose three lower bounds on the EPD to solve the pricing subproblem of the column generation. Our approach is tested on eight real-life test instances. The computational results show that the proposed approach provides very tight LP relaxation (within 0.6% of optimal solutions) and solves the test case with more than 6000 flights per week in less than three hours. We also investigate the solutions obtained by our approach over 500 simulated realizations. The simulation results demonstrate that, in all eight test instances, our solutions result in less EPDs than those obtained from traditional methods. We then extend our model and solution approach to solve realistically simulated TAP instances. 相似文献
14.
Free-floating bike sharing (FFBS) is an innovative bike sharing model. FFBS saves on start-up cost, in comparison to station-based bike sharing (SBBS), by avoiding construction of expensive docking stations and kiosk machines. FFBS prevents bike theft and offers significant opportunities for smart management by tracking bikes in real-time with built-in GPS. However, like SBBS, the success of FFBS depends on the efficiency of its rebalancing operations to serve the maximal demand as possible.Bicycle rebalancing refers to the reestablishment of the number of bikes at sites to desired quantities by using a fleet of vehicles transporting the bicycles. Static rebalancing for SBBS is a challenging combinatorial optimization problem. FFBS takes it a step further, with an increase in the scale of the problem. This article is the first effort in a series of studies of FFBS planning and management, tackling static rebalancing with single and multiple vehicles. We present a Novel Mixed Integer Linear Program for solving the Static Complete Rebalancing Problem. The proposed formulation, can not only handle single as well as multiple vehicles, but also allows for multiple visits to a node by the same vehicle. We present a hybrid nested large neighborhood search with variable neighborhood descent algorithm, which is both effective and efficient in solving static complete rebalancing problems for large-scale bike sharing programs.Computational experiments were carried out on the 1 Commodity Pickup and Delivery Traveling Salesman Problem (1-PDTSP) instances used previously in the literature and on three new sets of instances, two (one real-life and one general) based on Share-A-Bull Bikes (SABB) FFBS program recently launched at the Tampa campus of University of South Florida and the other based on Divvy SBBS in Chicago. Computational experiments on the 1-PDTSP instances demonstrate that the proposed algorithm outperforms a tabu search algorithm and is highly competitive with exact algorithms previously reported in the literature for solving static rebalancing problems in SBSS. Computational experiments on the SABB and Divvy instances, demonstrate that the proposed algorithm is able to deal with the increase in scale of the static rebalancing problem pertaining to both FFBS and SBBS, while deriving high-quality solutions in a reasonable amount of CPU time. 相似文献
15.
我国道路客运业的现状及发展对客车制造业的影响 总被引:1,自引:0,他引:1
本文对我国道路客运业的现状和特点进行了分析介绍,指出道路客运业向集约化、规模化发展,客运经营主体的资质、经营管理水平等需要进一步的提高。道路客运业的发展对客车制造企业提出了更多要求,但二者又是相互融合、共同发展的。 相似文献
16.
An Intelligent Master Model of Computer Aided Process Planning for Large Complicated Stampings 总被引:1,自引:0,他引:1
Process planning for large complicated stampings is more complicated, illegible and multiform than that for common stampings. In this paper, an intelligent master model of computer aided process planning (CAPP) for large complicated stampings has been developed based on knowledge based engineering (KBE) and feature technology. This innovative model consists of knowledge base (KB), process control structure (PCS), process information model (PIM), multidisciplinary design optimization (MDO), model link environment (MLE) and simulation engine (SE), to realize process planning, optimization, simulation and management integrated to complete intelligent CAPP system. In this model, KBE provides knowledge base, open architecture and knowledge reuse ability to deal with the multi-domain and multi-expression of process knowledge, and forms an integrated environment. With PIM, all the knowledge consisting of objects, constraints, cxtmricncc and decision-makings is carried by object-oriented method dynamically for knowledge-reasoning. PCS makes dynamical knowledge modified and updated timely and accordingly. MLE provides scv. cral methods to make CAPP sysmm associated and integrated. SE provides a programmable mechanism to interpret simulation course and result. Meanwhile, collaborative optimization, one method of MDO, is imported to deal with the optimization distributed for multiple purposes. All these make CAPP sysmm integrated and open to other systems, such as dic design and manufacturing system. 相似文献
17.
泰州长江大桥中塔沉井号称"世界第一巨型深水沉井",高76m,入土深度达55m,详细介绍了该沉井施工的整体工艺流程,其多项创新性施工工艺对类似沉井施工具有借鉴意义。 相似文献
18.
交通移动采集技术是一种先进的交通信息采集技术,目前在国外很多城市都进行了广泛的实验和应用。本文在分析常规交通采集技术的不足和交通移动采集技术特点的基础上,结合中国城市交通的特点,分析认为交通移动采集技术同样适合于国内大部分城市,并且有着广泛的应用前景。此外本文还将交通移动采集技术分为主动测试车技术和被动探测车技术。最后以中山市公交车采集的数据作为被动探测车数据,简单探讨了交通移动采集数据的分析和处理方法。 相似文献
19.
A linearized aero-hydro-servo-elastic floating wind turbine model is presented and used to perform integrated design optimization of the platform, tower, mooring system, and blade-pitch controller for a 10 MW spar floating wind turbine. Optimal design solutions are found using gradient-based optimization with analytic derivatives, considering both fatigue and extreme response constraints, where the objective function is a weighted combination of system cost and power quality. Optimization results show that local minima exist both in the soft-stiff and stiff-stiff range for the first tower bending mode and that a stiff-stiff tower design is needed to reach a solution that satisfies the fatigue constraints. The optimized platform has a relatively small diameter in the wave zone to limit the wave loads on the structure and an hourglass shape far below the waterline. The shape increases the restoring moment and natural frequency in pitch, which leads to improved behaviour in the low-frequency range. The importance of integrated optimization is shown in the solutions for the tower and blade-pitch control system, which are clearly affected by the simultaneous design of the platform. State-of-the-art nonlinear time-domain analyses show that the linearized model is conservative in general, but reasonably accurate in capturing trends, suggesting that the presented methodology is suitable for preliminary integrated design calculations. 相似文献
20.