排序方式: 共有96条查询结果,搜索用时 406 毫秒
31.
结合江阴大桥北引桥支座更换维护项目,采用SPLC-8计算机控制的液压整体同步顶升技术进行桥梁支座的更换施工。对不中断交通条件下的整体同步控制技术、顶升方案、施工工艺、支座更换施工以及施工中的关键性问题等进行了分析与探讨,工程实践表明在不中断交通状态下采用SPLC-8计算机控制的液压整体同步顶升技术进行桥梁支座更换是可以实现的。 相似文献
32.
The extreme wave and current response of a typical North Sea jack-up drilling platform has been calculated using nonlinear, stochastic, time-domain analysis techniques. A statistical treatment of the response-time histories has been performed. Appropriate probability distributions have been fitted to simulated response amplitudes and extrapolated to determine extreme values in storms of 3 or 6 h duration. Nonlinear geometric effects and dynamic effects are also addressed.
The results of the nonlinear time-domain analyses are compared to the results of more simplified methods used in jack-up designs. 相似文献
33.
For the production development of marginal offshore oil fields or to achieve early production in offshore fields scheduled for full production facilities a jack-up drilling rig can be converted to operate as a mobile production unit. This paper presents a summary discussion of the main aspects to be considered in the design, conversion, installation and operation of a jack-up production unit. 相似文献
34.
自锚式悬索桥钢箱梁顶升施工的监控要点 总被引:2,自引:0,他引:2
介绍了对主跨为328 m的双塔双索面自锚式全钢箱梁悬索桥———湖南省长沙市三汊矶湘江大桥进行吊杆安装形成成桥体系的顶升梁施工方法(包括顶升施工具体实施方案);确定了中跨内设置的4个临时墩顶升量值,运用数值方法拟合出了钢箱梁的顶升曲线;运用大型有限元分析程序建立了顶升和落下钢箱梁的施工全过程模型,分析了各个临时墩的起顶安全性、钢箱梁的应力及变形安全性;确定了起顶分级顶升的次数和每次的起顶量,得到了必须按4个临时墩起顶量的协调同步、均匀顶升钢箱梁的结论。 相似文献
35.
围井区结构是自升式钻井平台最重要的关键部分,在满足规范前提下进行围井区结构的优化设计。以某平台围井区结构设计为例,以提高结构强度为主要目标,同时兼顾建造的工艺及节点的优化设计,从材料选择、结构设计等方面进行论述。最终经有限元计算,分析结果表明:各工况下围井区结构强度均满足规范要求。 相似文献
36.
37.
38.
E. C. Hambly andB. A. Nicholson 《Marine Structures》1989,2(3-5):233-253
Simplification of calculations for fatigue of jack-ups is essential in order to understand the primary influences and the uncertainties involved. Considerable simplification is possible for jack-ups because calculations for fatigue are dominated by the few worst loading conditions, while the large number of lesser conditions can be ignored. The dominating conditions are likely to be — during operations, the resonant sway and surge motions at the natural period of the structure; and during towage, the 1 or 2 days of maximum roll and pitch motions. Examples for both situations examine loading conditions and demonstrate simplified calculations. 相似文献
39.
40.