首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   10篇
  免费   1篇
公路运输   2篇
综合类   1篇
水路运输   7篇
铁路运输   1篇
  2024年   1篇
  2012年   1篇
  2010年   2篇
  2004年   1篇
  2003年   2篇
  2002年   1篇
  2000年   1篇
  1999年   1篇
  1997年   1篇
排序方式: 共有11条查询结果,搜索用时 0 毫秒
11.
 Process planning for a hull structure defines the assembly sequence of the hull block. Although this activity is very important because the working strategy defines the production costs, to date it has been done manually. To raise the efficiency of this process, we developed a practical computer-aided process planning system. It has been developed using deliverables obtained from advanced computer integrated manufacturing system (CIM; ACIM) for shipbuilding projects sponsored by the Ship and Ocean Foundation (SOF). The system has a knowledge base which contains the know-how of skilled designers as well as design practices, and allows the assembly sequence of hull parts and intermediate products to be defined automatically. The system has been integrated with the shipyard CAD system MATES, and put to practical use. Received: August 19, 2002 / Accepted: November 25, 2002 Address correspondence to: Y. Sasaki (yuuichi_sasaki@mhi.co.jp) Updated from the Japanese original, which won the 2002 SNAJ prize (J Soc Nav Archit Jpn 2001;189:309–315)  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号