全文获取类型
收费全文 | 1570篇 |
免费 | 200篇 |
专业分类
公路运输 | 722篇 |
综合类 | 325篇 |
水路运输 | 258篇 |
铁路运输 | 416篇 |
综合运输 | 49篇 |
出版年
2024年 | 4篇 |
2023年 | 10篇 |
2022年 | 26篇 |
2021年 | 37篇 |
2020年 | 50篇 |
2019年 | 41篇 |
2018年 | 44篇 |
2017年 | 47篇 |
2016年 | 41篇 |
2015年 | 74篇 |
2014年 | 130篇 |
2013年 | 102篇 |
2012年 | 142篇 |
2011年 | 152篇 |
2010年 | 139篇 |
2009年 | 99篇 |
2008年 | 95篇 |
2007年 | 163篇 |
2006年 | 147篇 |
2005年 | 86篇 |
2004年 | 33篇 |
2003年 | 44篇 |
2002年 | 24篇 |
2001年 | 14篇 |
2000年 | 6篇 |
1999年 | 5篇 |
1998年 | 3篇 |
1997年 | 4篇 |
1996年 | 2篇 |
1995年 | 2篇 |
1993年 | 1篇 |
1992年 | 2篇 |
1991年 | 1篇 |
排序方式: 共有1770条查询结果,搜索用时 15 毫秒
61.
Studying the in-situ stress distribution at a tunnel site is very important to determine surrounding rock characteristics, the engineering design and the construction scheme. By using the multiple linear regression method based on the least square algorithm, the initial geostress field is analyzed and the corresponding regression coefficients are obtained. The ground stress obtained from the proposed back analysis is reasonable and can meet the demands of the engineering applications. From the rockburst risk level distribution diagram, it is speculated that the Wunvfeng tunnel is in the high filed stress area. Field monitoring should be strengthened and emergency plans should be made to cope with the rockburst risks during the construction process. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved. 相似文献
62.
Based on the Sutong GIL utility tunnel project, which is constructed by the shield machine under the river, and as for the overloading problem at the river bank slope during operating period, the refined threedimensional finite element model was established to study the deformation and cracking characteristics of the tunnel segment structure under different forms of overloading. The evolution laws of section convergence, joint opening and structural stress were analyzed, and the structure damage mechanisms were revealed under conditions of large area loading and local loading. The surface-surcharge control standard was proposed. For the big diameter shield tunneling crossing the silty clay, the research results show that: (1) the deformation failure process is divided into three stages under large area loading condition, taking the design load and compressive yield of rebars inside haunch as the critical points respectively. The first stage is characterized by the elastic stress, the second stage is in plastic state with fracture, and the third stage is accelerating deformation and instability stage. The vertical convergence is 110.5 mm with no opening of joints when rebars are yielded; (2)the deformation failure process under local loading condition is also divided into elasticity, plasticity and instability stages, taking the design load and tensile yield of rebars outside haunch as the critical points respectively. The vertical convergence is 152.6 mm with joint opening of 4.36 mm; (3) the early-warning values of additional stress on the ground under conditions of large area loading and local loading are 110 kPa and 70 kPa respectively. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved. 相似文献
63.
64.
本文以SRSF501无缝药芯焊丝在船用EH36高强钢中的焊接应用为目的,研究了国产无缝药芯焊丝SRSF501在船用EH36高强钢焊接中的组织和冲击韧性。通过试验表明:SRSF501焊接EH36钢接头各区域的冲击性能均满足船级社要求;多层多道焊时,焊缝组织由粗大的柱状组织和细小的等轴晶组织组成,底层焊缝和末道焊缝柱状晶区域较大;盖面层两侧接头热影响区存在粗晶区,其它位置接头的热影响区不存在粗晶区;焊接接头中熔合线外2mm处,晶粒最细,冲击韧性最好。 相似文献
65.
在轴舵系照光找中方面,虽然传统拉线法设备简单、操作简便,但由于钢丝本身存在挠度,导致测量精度无法保证。随着超长轴系船舶不断增多和船舶建造精度的不断提高,拉线法已不能满足当前船舶建造精度的需要。优化后的轴舵系照光找中工艺采用光学仪器与激光设备代替拉线,所测量的数据更精准、更直观。经多型船实践证明,新的轴舵系照光找中工艺,通过改变过去照光的生产技术,不仅提高船舶建造效率和质量,而且为船厂进一步节约建造成本。 相似文献
66.
山区高速公路弃渣体物理力学特性试验研究 总被引:1,自引:0,他引:1
公路弃土场是一种特殊的人工堆积体,对其进行稳定性分析与评价需要掌握弃渣体的物理力学指标。文章以厦蓉高速公路水都段典型弃土场弃渣体为研究对象,介绍采用现场试验和室内试验方法,对弃渣体的最大干密度和抗剪强度等参数进行研究。通过研究得到:不同颗粒成分弃渣体的最大干密度不同,但在通常推填方式下,弃渣体的强度指标基本不受压实度控制。 相似文献
67.
68.
69.
70.