首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   2259篇
  免费   44篇
公路运输   170篇
综合类   143篇
水路运输   28篇
铁路运输   1824篇
综合运输   138篇
  2024年   2篇
  2023年   3篇
  2022年   29篇
  2021年   39篇
  2020年   144篇
  2019年   92篇
  2018年   93篇
  2017年   143篇
  2016年   145篇
  2015年   109篇
  2014年   174篇
  2013年   100篇
  2012年   163篇
  2011年   171篇
  2010年   120篇
  2009年   80篇
  2008年   109篇
  2007年   155篇
  2006年   136篇
  2005年   80篇
  2004年   77篇
  2003年   65篇
  2002年   24篇
  2001年   16篇
  2000年   8篇
  1999年   8篇
  1998年   9篇
  1997年   3篇
  1996年   1篇
  1995年   4篇
  1994年   1篇
排序方式: 共有2303条查询结果,搜索用时 187 毫秒
91.
The aircraft turnaround processes is mainly controlled by the ground handling, airport or airline staff, except the aircraft boarding, which is driven by the passengers’ experience and willingness or ability to follow the proposed boarding procedures. The paper uses a prior developed, calibrated, stochastic aircraft boarding model, which is applied to different boarding strategies (chronological order of passenger arrival, hand luggage handling), group constellations and innovative infrastructural changes (Flying Carpet, Side-Slip Seat, Foldable Passenger Seat). In this context, passenger boarding is assumed to be a stochastic, agent-based, forward-directed, one-dimensional and discrete process. The stochastic model covers individual passenger behavior as well as operational constraints and deviations. A comprehensive assessment using one model allows for efficient comparison of current research approaches and innovative operational solutions for efficient passenger boarding.  相似文献   
92.
Railway transportation systems are important for society and have many challenging and important planning problems. Train services as well as maintenance of a railway network need to be scheduled efficiently, but have mostly been treated as two separate planning problems. Since these activities are mutually exclusive they must be coordinated and should ideally be planned together. In this paper we present a mixed integer programming model for solving an integrated railway traffic and network maintenance problem. The aim is to find a long term tactical plan that optimally schedules train free windows sufficient for a given volume of regular maintenance together with the wanted train traffic. A spatial and temporal aggregation is used for controlling the available network capacity. The properties of the proposed model are analyzed and computational experiments on various synthetic problem instances are reported. Model extensions and possible modifications are discussed as well as future research directions.  相似文献   
93.
In case of railway disruptions, traffic controllers are responsible for dealing with disrupted traffic and reduce the negative impact for the rest of the network. In case of a complete blockage when no train can use an entire track, a common practice is to short-turn trains. Trains approaching the blockage cannot proceed according to their original plans and have to short-turn at a station close to the disruption on both sides. This paper presents a Mixed Integer Linear Program that computes the optimal station and times for short-turning the affected train services during the three phases of a disruption. The proposed solution approach takes into account the interaction of the traffic between both sides of the blockage before and after the disruption. The model is applied to a busy corridor of the Dutch railway network. The computation time meets the real-time solution requirement. The case study gives insight into the importance of the disruption period in computing the optimal solution. It is concluded that different optimal short-turning solutions may exist depending on the start time of the disruption and the disruption length. For periodic timetables, the optimal short-turning choices repeat due to the periodicity of the timetable. In addition, it is observed that a minor extension of the disruption length may result in less delay propagation at the cost of more cancellations.  相似文献   
94.
为分析研究综合工费对大型机械钻爆法施工概算费用的影响,以3条新建双线铁路隧道项目数据为依托,核算出不同施工模式下的经济指标及工程费用;建立基期综合工费单价理论计算模型,计算出不同施工模式、不同围岩等级条件下新建铁路双线隧道临界综合工费单价。通过与普通钻爆法对比,大型机械钻爆法施工建造费用增长约10%;当基期综合工费高于226. 54元/工日时,大型机械钻爆法施工的经济性得以体现。  相似文献   
95.
蒋诗云 《铁道货运》2020,(3):40-44,49
随着客户运输需求的多样化升级,采用铁路混装货物装运模式在提升铁路运输效率、吸引多样货源等方面相较于单一品名装运显示出一定的优越性,同时混装货物装运面临的安全压力相较于单一品名装运出现骤增。为保障铁路混装货物装运安全,在阐述混装货物装运特点及安全控制要点的基础上,从"人防""物防""技防"3方面构建混装货物装运安全评价指标体系,采用层次分析法确定各指标权重,并利用模糊综合评价法对铁路混装货物装运安全进行评价,通过实例验证该评价方法的实用性及有效性,为铁路混装货物装运安全评价提供依据。  相似文献   
96.
“八纵八横”高速铁路网货运节点可以利用聚类分析法,依据货运总量、GDP、人口、社会消费品零售总额、快递业务量、线路连接数、城市类别和节点类别等指标划分为4个等级。基于灰色系统预测模型,预测2025年高速铁路货运量,构建数学模型计算保本货运量。依据节点划分、货运量预测、保本货运量结果,计算各等级节点中盈利OD所占的比例,结合日均OD量,分析各等级节点间开办高速铁路货运的可行性。研究表明,在一级节点之间可以开行高速铁路货运动车组专列,在二级节点之间可以开行客货联挂动车组,三、四级节点可以采用捎带运输的方式。  相似文献   
97.
为揭示频繁爆破下隧道内振动传播衰减规律,文章以蒙华铁路段家坪隧道为工程背景,利用LS-DY NA建立了三维隧道模型,模拟分析了多次爆破下隧道内近区和中远区的振动传播规律。结果表明,质点垂向峰值振速随距离和爆破次数的增大而减小,少数振速有增大的现象;近区振动衰减较快,中远区振动衰减比近区缓慢;中远区a值比近区至少小12.5%,但整体上二者的a值随爆破作用次数的增加呈缓慢上升趋势;系数K随爆破作用次数的增加而降低,近区K值降低速率普遍大于中远区,且近区K值比中远区至少大29.1%;频繁爆破下,中远区比近区较符合萨道夫斯基经验公式。  相似文献   
98.
随着《铁路基本建设项目投资管理办法》(铁总计统〔2017〕179号)及《关于铁路建设项目清理概算工作的通知》(发改投资电〔2019〕1号)文的出台,标志着铁路建设项目概算清理工作,将逐步交由建设单位按照不突破初步设计批复金额进行处理,因此初步设计阶段如何确保招标预算金额的准确性,体现的越来越为重要,本文通过对500米长轨营业线火车市场运费与编制办法计算运费的分析,量化两者费用存在的差异,列明差异原因,并提出相关建议。  相似文献   
99.
基于高速公路预防性养护决策方案选择的特性,使用群决策理论的层次分析法,通过对决策组成员意见的集合,得到了各成员动态权重,减少主观误差,提高决策方案结果的客观可靠性。通过案例,将措施费用、行车特征、技术因素、施工因素等作为目标层,对4种备选方案进行分析,得出最佳措施。案例结果证明群决策方法的有效性与可靠性,为选择合理的养护措施提供参考。  相似文献   
100.
白云  石振明  石雪飞 《隧道建设》2017,37(10):1201-1208
随着我国"一带一路"倡议的推进,跨国运输通道的建设成为倡议实施的关键环节之一,而我国建设复杂地质条件下跨国基础设施的经验尚不丰富。"中—尼—印铁路通道"是一条途经尼泊尔,连接中国和印度2个大国的运输通道,基于实地考察,分析该通道建设的必要性及建成后的效益,对线路进行初步规划,并总结该通道建设的难点:铁路轨道坡度大;沿线区域地质构造复杂;周边基础设施落后,施工条件恶劣;大量深长隧道以及大跨径高桥梁;环境以及气候条件复杂。同时对沿线隧道以及桥梁的建设可行性进行分析,并给出施工建议:沿线隧道采用以TBM法为主、钻爆法为辅的施工方法;桥梁建设则因地制宜,根据不同区间的地质特点,采用相应的建设方法。  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号