全文获取类型
收费全文 | 821篇 |
免费 | 36篇 |
专业分类
公路运输 | 215篇 |
综合类 | 169篇 |
水路运输 | 7篇 |
铁路运输 | 226篇 |
综合运输 | 240篇 |
出版年
2024年 | 1篇 |
2022年 | 11篇 |
2021年 | 9篇 |
2020年 | 29篇 |
2019年 | 22篇 |
2018年 | 49篇 |
2017年 | 41篇 |
2016年 | 50篇 |
2015年 | 25篇 |
2014年 | 60篇 |
2013年 | 42篇 |
2012年 | 96篇 |
2011年 | 129篇 |
2010年 | 49篇 |
2009年 | 29篇 |
2008年 | 32篇 |
2007年 | 52篇 |
2006年 | 50篇 |
2005年 | 28篇 |
2004年 | 13篇 |
2003年 | 19篇 |
2002年 | 5篇 |
2001年 | 4篇 |
2000年 | 1篇 |
1999年 | 1篇 |
1998年 | 1篇 |
1997年 | 2篇 |
1996年 | 2篇 |
1995年 | 1篇 |
1994年 | 1篇 |
1993年 | 3篇 |
排序方式: 共有857条查询结果,搜索用时 15 毫秒
31.
Water bursts during tunnel construction endanger construction, and it is therefore necessary to reserve a waterproof dike with the required thickness to avoid water bursts and to take reinforcement of the dike and treatment of the structure liable to trigger a water burst. Using the water burst at K5+398 of the Mingyueshan tunnel of the Shanghai-Chengdu expressway as an example, and considering the type of tunnel section and the upright mudstone of the dike, the waterproof dike at the work face is simplified as a round thin plate. A formula for the calculation of a minimum safety thickness for the critical waterproof dike is deduced by analyzing the force applied on the water-proof dike, and the minimum safety thickness for the water burst section at K5+398 of the Mingyueshan tunnel is cal-culated. The numerical simulation analysis demonstrates the critical thickness of waterproof dike at K5+398 of the Mingyueshan tunnel is 1.4-1.55 m, and the calculated water inflow and water burst basically agree with the actual condition. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved. 相似文献
32.
Combining the present situation and development trend of different tunnel support technologies at home and abroad, this paper analyzes the problems of rockburst in hard rock tunnels and large deformation in soft rock tunnels caused by high ground stress. It is concluded that: 1) regarding the rockburst problem, the current support technology is mainly influenced by the rock burst mechanism which is dominated by static factors, and so the used support components are generally of smaller deformation performance and "passive support" properties; 2) as the rockburst is the result of dynamic-static stress coupling, and only the anchor bolt has the "active support" attribute in the current "shotcrete+anchor bolt+wire net" support system, so the best support system should have the two functions of active support and energy release in terms of the rockburst problem, and the key focus of the research and development is anchorage members; 3) there are three main support types for large deformation in soft rock tunnels, e.g. the heavy support, layered support and yielding support. Among them, the heavy support system in underground cavern with large deformation is easy to induce excessive surrounding rock pressure, and so the applicable conditions are limited. The layered support system is still not the best choice due to its immature theoretical study, difficult determination of the thickness value and the installation time of each support layer and the interference to construction progress. With the characteristics of timely support and yielding while supporting, the yielding support system can give full play to the performance values of surrounding rocks and supporting materials, and make both of them reach the optimal state, so it is the best choice for supporting the soft rock tunnels with large deformations. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved. 相似文献
33.
Defects of tunnel lining, such as inadequate thickness, voids, cracks, rock falling and water leakage etc., endanger the safety of railway tunnel operation. Based on the site construction, an analysis of the reasons for lining defects was conducted; technical measures against lining defects were proposed and tests were carried out at site. The results show that these measures are reliable and effective, and the purposes of prevention and treatment are re⁃ alized. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved. 相似文献
34.
在施工中要采取有效的措施来预防塌方的发生,当在施工中不可避免地出现塌方的时候,能够提出合理的处理方法和步骤。介绍了隧道工程预防塌方的施工措施及隧道发生塌方后的处理方法。 相似文献
35.
36.
大跨隧道双侧壁导坑法施工力学行为研究 总被引:1,自引:0,他引:1
结合某城市道路,对大跨隧道双侧壁导坑法施工进行了弹塑性数值模拟,探明了施工过程中国岩深部位移、围岩稳定性,以及衬砌结构的受力特性.研究表明,围岩等级较高,围岩条件差的情况下,采用双侧壁导坑法在技术上是可行的,并且能够很好的控制施工过程中围岩的稳定. 相似文献
37.
38.
在隧道宏观工程背景分析的基础上,对龙厦铁路象山隧道施工风险进行了详细的分析,指出了象山隧道施工面临突水突泥、地表失水、塌方、软岩变形、岩爆、瓦斯爆炸、高地温、有轨运输溜车等八项典型施工风险,对长大隧道施工风险控制具有指导意义。 相似文献
39.
40.
为了确保隧道贯通前CPⅡ分段建网的精度,保障隧道的顺利施工,以格库铁路阿尔金山隧道为工程背景,采用高精度陀螺全站仪对洞内CPⅡ平面控制网加测多条陀螺边,并提出了陀螺定向精度观测精度内检核、多条陀螺边定向复核的方法,对陀螺定向边位置的选择、陀螺方位角观测中误差、陀螺方位角观测值的应用区间进行探讨。应用高精度陀螺定向成果对比分析洞内CPⅡ分段控制网成果,从理论上探讨了加测陀螺边对CPⅡ控制网贯通预计精度的影响,解决了隧道贯通前CPⅡ平面控制网精度无法验证的问题,确保了CPⅡ分段建网的精度,总结出一套高精度陀螺全站仪在长大铁路隧道CPⅡ平面控制网分段建网测量中的应用方法,其中包括陀螺定向边间距约2 km、陀螺定向边采用对向观测、每测站数不小于4测回且观测方向平均测角中误差应小于仪器精度(3.6″)、依据陀螺观测计算方位角与导线推算方位角较差值并将成果应用划为三个应用区间、依据陀螺定向观测精度变换权重降低贯通预计值、优化约束平差计算方案等。 相似文献