首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   1篇
  免费   0篇
公路运输   1篇
  2019年   1篇
排序方式: 共有1条查询结果,搜索用时 0 毫秒
1
1.
It needs some seconds for a signal, which is created from brake application, to travel from the first part of the train system (locomotive) to the end part of it (last wagon). Delay in time of all parts of the system (train) brake is seen which might deteriorate the longitudinal dynamic interaction of the long trains. For instance, this results in running of the rear cars to the front ones and hence producing large in-train forces at the buffers and couplers. Major parts of the rolling stock in railway system repair are known for relative compression and tension forces, which are applied to the whole train system and cause huge expenses for the industry. For trains with long lengths, operating in safe area is another important relation with train forces along the system. By using MATLAB simulation in this study, we investigated the length's effect on train dynamic along the system mainly for freight trains. We did our research on the trains which are currently used in Railways of Islamic Republic of Iran, RIRI. Four diverse cases were under our simulation, in each of which, trains consist of 52, 32, 20 and 12 cars, respectively. Two different forces (tension and compression) are displayed here as of the outcome of the research. Simulations show different forms of interplays in dynamics along the system. Then we compared the graphs to each other to find out detailed influences of length of the whole system (train including different number of wagons and locomotive) on dynamics of system along it while braking is applied.  相似文献   
1
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号