首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   6篇
  免费   0篇
综合类   5篇
水路运输   1篇
  2010年   1篇
  2009年   2篇
  2008年   1篇
  2006年   1篇
  2005年   1篇
排序方式: 共有6条查询结果,搜索用时 31 毫秒
1
1.
Introduction The project of Tianwan Nuclear Power Plant,located in Pashan, at the south foot of HouyuntaiMount, northeast of Lianyungang City, JiangsuProvince, is entitled State Key Project in collabo-ration with Russia. This project is carried out atthree phases, with two reactors to be built at eachphase. Important constructions such as the nuclearislets and the normal islets are all situated at thebedrock zone. With regard to the field study of thenuclear power plant, the authors have…  相似文献   
2.
IntroductionEarlier work on tidal fluctuating groundwaterlevels emphasized the use of the observed water-level fluctuations to calculate aquifer parameters.Many researchers studied the relations betweengroundwater wave and tidal fluctuation[1~4].Michael[5]studied the tidal filtering methods tradi-tionally applied to surface water measurements todetermine mean levels. It also can be applied totidally fluctuating groundwater to determine themean hydraulic gradient. Erskine[6]studied thetidal os…  相似文献   
3.
The earthquake characteristics and geological structure of the site to sitting the Qinshan Nuclear Power Station are closely related. According to site investigation drilling, sampling, seismic sound logging wave test in single-hole and cross-hole, laboratory wave velocity test of intact rock, together with analysis of the site geological conditions, the seismic wave test results of the site between strata lithology and the geologic structure were studied. The relationships of seismic waves with the site lithology and the geologic structure were set up.The dynamic parameters of different grades of weathering profile were deduced. The results assist the seismic design of Phase Ⅲ Qinshan Nuclear Power Plant, China.  相似文献   
4.
Rectangular tiles can be laid on a ship’s hull for protection, but the sides of the tiles must be adjusted so adjacent tiles will conform to the curvature of the hull. A method for laying tiles along a reference line was proposed, and an allowable range of displacement for the four vertices of the tile was determined. Deformations of each tile on a specific reference line were then obtained. It was found that the least deformation was required when the tiles were laid parallel to a line with the least curvature. After calculating the mean curvature on the surface, the surface was divided into three layout areas. A set of discrete points following the least deformation of the principal curvatures was obtained. A NURBS interpolation curve was then plotted as the reference line for laying tiles. The optimum size of the tiles was obtained, given the allowable maximum deformation condition. This minimized the number of bolts and the amount of stuffing. A typical aft hull section was selected and divided into three layout areas based on the distribution of curvature. The optimum sizes of rectangular tiles were obtained for every layout area and they were then laid on the surface. In this way the layout of the rectangular tiles could be plotted.  相似文献   
5.
The earthquake characteristics and geological structure of the site to sitting the Qinshan Nuclear Power Station are closely related. According to site investigation drilling, sampling, seismic sound logging wave test in single-hole and cross-hole, laboratory wave velocity test of intact rock, together with analysis of the site geological conditions, the seismic wave test results of the site between strata lithology and the geologic structure were studied. The relationships of seismic waves with the site lithology and the geologic structure were set up. The dynamic parameters of different grades of weathering profile were deduced. The results assist the seismic design of Phase III Qinshan Nuclear Power Plant, China.   相似文献   
6.
This case study describes the effects of a grouting process developed to decrease groundwater flow exiting from a ruptured mine ventilation shaft lining in Luling coal mine at Huaibei, China. The primary purpose of grouting at this site is to prevent groundwater flow into the mine from adjacent aquifers. The study supports a transport perspective to describe the miscible grout movement, and provides an approximate analytical method to determine grout concentration based on Wilson and Miller's (1978) model. This study shows that the breakthrough curves (BTCs) established from the Wilson and Miller's model match the experimental BTCs obtained from test grouting performed at the site, and Rd a retardation factor of 1.1 is determined. The retardation factor and the BTC are subsequently used to guide the actual production grouting. The monitored result shows that the groundwater inflow at the disrupted ventilation well has been reduced by 47% after drilling and grouting just one borehole. The discharge rate was measured at no more than 4 m3/h after completion of four injection boreholes, which is about 13% of the 30 m3/h before grouting.  相似文献   
1
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号