首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   30篇
  免费   1篇
公路运输   8篇
综合类   4篇
水路运输   14篇
铁路运输   5篇
  2022年   2篇
  2019年   2篇
  2018年   1篇
  2015年   2篇
  2012年   3篇
  2010年   1篇
  2008年   3篇
  2007年   2篇
  2006年   2篇
  2005年   1篇
  2000年   2篇
  1996年   2篇
  1993年   2篇
  1992年   2篇
  1991年   1篇
  1990年   2篇
  1988年   1篇
排序方式: 共有31条查询结果,搜索用时 15 毫秒
1.
The phase change characteristic of the power source of an underwater glider propelled by the ocean's thermal energy is the key factor in glider attitude control. A numerical model has been established based on the enthalpy method to analyze the phase change heat transfer process under convective boundary conditions. Phase change is not an isothermal process,but one that occurs at a range of temperature. The total melting time of the material is very sensitive to the surrounding temperature. When the temperature of the surroundings decreases 8 degrees,the total melting time increases 1.8 times. But variations in surrounding temperature have little effect on the initial temperature of phase change,and the slope of the temperature time history curve remains the same. However,the temperature at which phase change is completed decreases significantly. Our research shows that the phase change process is also affected by container size,boundary conditions,and the power source's cross sectional area. Materials stored in 3 cylindrical containers with a diameter of 38mm needed the shortest phase change time. Our conclusions should be helpful in effective design of underwater glider power systems.  相似文献   
2.
The phase change characteristic of the power source of an underwater glider propelled by the ocean's thermal energy is the key factor in glider attitude control. A numerical model has been established based on the enthalpy method to analyze the phase change heat transfer process under convective boundary conditions. Phase change is not an isothermal process, but one that occurs at a range of temperature. The total melting time of the material is very sensitive to the surrounding temperature. When the temperature of the surroundings decreases 8 degrees, the total melting time increases 1.8 times. But variations in surrounding temperature have little effect on the initial temperature of phase change, and the slope of the temperature time history curve remains the same. However, the temperature at which phase change is completed decreases significantly. Our research shows that the phase change process is also affected by container size, boundary conditions, and the power source's cross sectional area. Materials stored in 3 cylindrical containers with a diameter of 38ram needed the shortest phase change time. Our conclusions should be helpful in effective design of underwater glider power systems.  相似文献   
3.
In order to deal with the technical problems of Shuangfeng Tunnel passing through water rich Tertiary sandy mudstone strata with long distance and big overburden, such as dewatering, advance reinforcement, structural design and construction method etc., reducing tunnel deformation, preventing water inrush, gushing mud and tunnel collapse, the technical route of "stereo exploration, pressure reduction by water releasing, pre grouting, supporting timely, overall monitoring" is established after the field test and data analysis. Methods of full dimensional exploration and water pressure reducing are proposed, which form the preceding reinforcing technology that are different between inside the excavation contour and outside the excavation contour. Support linings are constructed immediately after excavation of upper bench. Safety performance of tunnel structure is evaluated according to the monitoring results. The research is conducted based on Shuangfeng Tunnel and the study results are applied in the construction of the tunnel. Results indicate that it can make sense to control deformation and ensure safety by using methods of reducing pressure through full dimensional water release, adopting advance reinforcement measures that are different between inside the excavation contour and outside the excavation contour, proposing mini bench method during tunnel construction and supporting timely after excavation for tunnels passing through water rich Tertiary sandy mudstone strata.  相似文献   
4.
Kban  MA 王桢 《路基工程》1996,(1):82-85,90
这篇技术性述评叙述了用腈制U形密封环业简化和改进液压固结仪和自动体积量测仪,这种新的装置既便宜又易于安装,并且能够很地与计算机数据收集和控制系统相联接。  相似文献   
5.
本文全面阐述了德国铁路新开发的第三代ICE城间高速列车-ICE2.2的设计要求与全新概念,其中包括:车体结构与内装修设计,走行部分与牵引设备等。该列车首次采取动力分散式动车且,装有再生,线性涡流,盘形制动,并设有列车信息和故障诊断系统。列车构造速度330km/h,最高运行速度300km/h,将成为德国技术水平先进、档次最高的高速列车,拟用于德国1998年后的国内和欧洲高速铁路网高速客运。  相似文献   
6.
一、概述洛溪大桥跨越珠江水网和稻田地区。大桥全长1916m,其中引桥长1436m,分别位于半径 R=1000m 和600m 的平曲线上,桥面全宽15.5m,纵坡4%,引桥最大高度33m。引桥上部为30m 跨径的预应力混凝土 T 梁共36孔,252片梁,每片梁重67t,梁高2m,架梁作业十分艰巨。原计划采用跨墩门架安装大梁的方案,在施工组织设计阶段,经过调查研究发现该方案有如下弊病:①沿桥跨越6条农用小  相似文献   
7.
根据英国标准BS7448,对UOE直缝埋弧焊管不同钢级管线钢焊接接头进行裂纹尖端张开位移(CTOD)断裂韧度测试.结合加拿大标准CSA Z662-07及挪威船级社规范NDV-OS-F101,在试样形式选择、缺口取样方向、后期金相检验等方面对断裂韧性评定方法加以完善.试验结果表明X70、X65级管线钢均具有良好韧性,符合规范NDV-OS-F101的要求.X70级管线钢焊接接头各区域韧性分布规律为:母材性能最好,焊缝次之,热影响区(HAZ)相对较差.X65级管线钢其HAZ的韧性优于母材和焊缝.其原因是:X65级钢母材含有一定气孔、夹杂,断口出现分层裂纹,导致CTOD结果分散性大.另外,X65焊缝组织为混晶组织分布不均,含有大量M-A脆性组织物,导致韧性下降.该评定结果为海底管线钢制造工艺改进提供了依据,也为海洋工程结构安全性评估奠定了基础.  相似文献   
8.
Parkinson's disease patients suffer from disorders of speech.The most frequently reported speech problems are weak,hoarse,nasal or monotonous voice,imprecise articulation,slow or fast speech,difficulty starting speech,impaired stress or rhythm,stuttering,and tremor.To improve the speech quality and assist the patient with speech rehabilitation therapy,we have proposed the speech recognition model for Parkinson's disease patients using transfer learning technique (PSTL),where we have pre-trained the long short-term memory (LSTM)neural network model with our developed publicly available dataset that has been obtained from healthy people through the social media platform.Then,we applied the transfer learning technique to improve the performance of the PSTL framework.The frequency spectrogram masking data augmentation method has been used to alleviate the over-fitting problem so that the word error rate (WER) is further reduced.Even with a limited dataset,our proposed model has effectively reduced the WER from 58% to 44.5% on the original speech dataset and 53.1% to 43% on the denoised speech dataset,which demonstrated the feasibility of our framework.  相似文献   
9.
10.
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号