排序方式: 共有211条查询结果,搜索用时 14 毫秒
1.
系统地总结了铁路工程边坡锚固技术的应用历程、新结构形式,详细介绍了主要支护结构创新应用的工程设计方法、施工工艺要点及主要应用成果、经验。 相似文献
2.
3.
4.
竖向预应力筋锚固过程的应力损失控制 总被引:1,自引:0,他引:1
结合汕头市西港高架桥主桥竖向预应力筋在锚固过程的应力损失测试,从中得出相关规律与有关参数,从而保证锚固过程中的应力损失得到有效控制。 相似文献
5.
净掘进速率是TBM施工速度的主要评价指标,与围岩物理力学性质、TBM掘进参数之间存在一定相关性。文章以兰州水源地建设工程输水隧洞双护盾TBM施工为背景,基于现场实测数据,选择岩石单轴抗压强度、抗拉强度、变形模量、泊松比、岩石耐磨性CAI值等岩体指标,以及刀盘推力和刀盘转速等掘进参数,进行TBM净掘进速率与有关影响参数之间的单因素相关性分析,得到相应拟合公式;基于TBM净掘进速率与岩体指标、掘进参数之间的相关性,利用多元非线性回归方法建立了TBM净掘进速率预测模型。通过将兰州水源地建设工程输水隧洞实测TBM净掘进速率和预测结果进行对比,验证了TBM净掘进速率预测模型的合理性。研究结果表明:(1)在复杂的多种地质条件下,TBM净掘进速率与岩石单轴抗压强度、抗拉强度、变形模量、岩石耐磨性CAI值、刀盘推力以及刀盘转速呈负相关关系,与泊松比呈正相关关系;(2)干湿状态对岩石耐磨性CAI值有一定影响,饱和状态下岩石耐磨性CAI值与TBM净掘进速率之间的相关性更显著;(3)建立的多元非线性回归预测模型,预测精度较高,可为相似地质条件下TBM净掘进速率估算提供参考。 相似文献
6.
当前我国桥墩预制拼装工法应用越来越多,通过分析桥墩预制拼装工法中各种常用竖向预应力锚固体系的优缺点,提出了一种新型的、具有自锁功能的竖向预应力锚固体系。主要从该预应力锚固体系的研究背景、结构设计、试验研究、施工工艺研究和工程应用等方面进行阐述。研究和应用表明该新型预应力锚固体系锚固性能可靠、施工工艺简单、质量易保证、成本较低,能很好满足预制构件竖向拼装的需要,值得在工程中推广应用。 相似文献
7.
Studying the in-situ stress distribution at a tunnel site is very important to determine surrounding rock characteristics, the engineering design and the construction scheme. By using the multiple linear regression method based on the least square algorithm, the initial geostress field is analyzed and the corresponding regression coefficients are obtained. The ground stress obtained from the proposed back analysis is reasonable and can meet the demands of the engineering applications. From the rockburst risk level distribution diagram, it is speculated that the Wunvfeng tunnel is in the high filed stress area. Field monitoring should be strengthened and emergency plans should be made to cope with the rockburst risks during the construction process. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved. 相似文献
8.
Combining the present situation and development trend of different tunnel support technologies at home and abroad, this paper analyzes the problems of rockburst in hard rock tunnels and large deformation in soft rock tunnels caused by high ground stress. It is concluded that: 1) regarding the rockburst problem, the current support technology is mainly influenced by the rock burst mechanism which is dominated by static factors, and so the used support components are generally of smaller deformation performance and "passive support" properties; 2) as the rockburst is the result of dynamic-static stress coupling, and only the anchor bolt has the "active support" attribute in the current "shotcrete+anchor bolt+wire net" support system, so the best support system should have the two functions of active support and energy release in terms of the rockburst problem, and the key focus of the research and development is anchorage members; 3) there are three main support types for large deformation in soft rock tunnels, e.g. the heavy support, layered support and yielding support. Among them, the heavy support system in underground cavern with large deformation is easy to induce excessive surrounding rock pressure, and so the applicable conditions are limited. The layered support system is still not the best choice due to its immature theoretical study, difficult determination of the thickness value and the installation time of each support layer and the interference to construction progress. With the characteristics of timely support and yielding while supporting, the yielding support system can give full play to the performance values of surrounding rocks and supporting materials, and make both of them reach the optimal state, so it is the best choice for supporting the soft rock tunnels with large deformations. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved. 相似文献
9.
结合铁路工程钢绞线一锚具组装件的静载锚固性能试验检测,对影响试验结果的各种因素进行了分析,并指出相应的解决措施。提出试验过程的有效控制是试验科学性和数据结果可靠性的有力保证。 相似文献
10.
一种适用于大变形支护的新型可伸长锚杆 总被引:3,自引:0,他引:3
支护理论的发展对锚固技术提出了新的要求,即要与围岩变形相协调,允许围岩可控变形,充分发挥围岩的自支撑能力。基于此设计了一种适用于大变形支护的新型可伸长锚杆,该型锚杆在达到初始锚固力后,在保持与围岩协调变形的伸长过程中锚固力可基本保持恒定,达到围岩许用变形形值后,锚固力急速上升。室内与现场试验证实了新型可伸长锚杆协调围岩大变形的优良性能,可在围岩大变形支护中推广应用。可伸长。 相似文献