排序方式: 共有216条查询结果,搜索用时 15 毫秒
1.
2.
Water bursts during tunnel construction endanger construction, and it is therefore necessary to reserve a waterproof dike with the required thickness to avoid water bursts and to take reinforcement of the dike and treatment of the structure liable to trigger a water burst. Using the water burst at K5+398 of the Mingyueshan tunnel of the Shanghai-Chengdu expressway as an example, and considering the type of tunnel section and the upright mudstone of the dike, the waterproof dike at the work face is simplified as a round thin plate. A formula for the calculation of a minimum safety thickness for the critical waterproof dike is deduced by analyzing the force applied on the water-proof dike, and the minimum safety thickness for the water burst section at K5+398 of the Mingyueshan tunnel is cal-culated. The numerical simulation analysis demonstrates the critical thickness of waterproof dike at K5+398 of the Mingyueshan tunnel is 1.4-1.55 m, and the calculated water inflow and water burst basically agree with the actual condition. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved. 相似文献
3.
Combining the present situation and development trend of different tunnel support technologies at home and abroad, this paper analyzes the problems of rockburst in hard rock tunnels and large deformation in soft rock tunnels caused by high ground stress. It is concluded that: 1) regarding the rockburst problem, the current support technology is mainly influenced by the rock burst mechanism which is dominated by static factors, and so the used support components are generally of smaller deformation performance and "passive support" properties; 2) as the rockburst is the result of dynamic-static stress coupling, and only the anchor bolt has the "active support" attribute in the current "shotcrete+anchor bolt+wire net" support system, so the best support system should have the two functions of active support and energy release in terms of the rockburst problem, and the key focus of the research and development is anchorage members; 3) there are three main support types for large deformation in soft rock tunnels, e.g. the heavy support, layered support and yielding support. Among them, the heavy support system in underground cavern with large deformation is easy to induce excessive surrounding rock pressure, and so the applicable conditions are limited. The layered support system is still not the best choice due to its immature theoretical study, difficult determination of the thickness value and the installation time of each support layer and the interference to construction progress. With the characteristics of timely support and yielding while supporting, the yielding support system can give full play to the performance values of surrounding rocks and supporting materials, and make both of them reach the optimal state, so it is the best choice for supporting the soft rock tunnels with large deformations. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved. 相似文献
4.
Eunhyek Joa Kwanwoo Park Youngil Koh Kilsoo Kim 《Vehicle System Dynamics: International Journal of Vehicle Mechanics and Mobility》2018,56(4):579-603
This paper presents a tyre slip-based integrated chassis control of front/rear traction distribution and four-wheel braking for enhanced performance from moderate driving to limit handling. The proposed algorithm adopted hierarchical structure: supervisor – desired motion tracking controller – optimisation-based control allocation. In the supervisor, by considering transient cornering characteristics, desired vehicle motion is calculated. In the desired motion tracking controller, in order to track desired vehicle motion, virtual control input is determined in the manner of sliding mode control. In the control allocation, virtual control input is allocated to minimise cost function. The cost function consists of two major parts. First part is a slip-based tyre friction utilisation quantification, which does not need a tyre force estimation. Second part is an allocation guideline, which guides optimally allocated inputs to predefined solution. The proposed algorithm has been investigated via simulation from moderate driving to limit handling scenario. Compared to Base and direct yaw moment control system, the proposed algorithm can effectively reduce tyre dissipation energy in the moderate driving situation. Moreover, the proposed algorithm enhances limit handling performance compared to Base and direct yaw moment control system. In addition to comparison with Base and direct yaw moment control, comparison the proposed algorithm with the control algorithm based on the known tyre force information has been conducted. The results show that the performance of the proposed algorithm is similar with that of the control algorithm with the known tyre force information. 相似文献
5.
Matthias Greiner Hans-Joachim Unrau Frank Gauterin 《Vehicle System Dynamics: International Journal of Vehicle Mechanics and Mobility》2018,56(1):78-94
Measurements of rolling resistance in thermal equilibrium of a tyre, like measurements according to ISO 28580, do not allow statements about rolling resistances under other driving conditions. Such statements, however, are necessary to determine the energy consumption in driving cycles. Especially for the proper calculation of electric-vehicle remaining ranges and the selection of the respective driving strategies, the real amount of energy consumption is required. This paper presents a model approach, which by means of only one standardised rolling resistance measurement can be parameterised and, considering the present driving speed and tyre temperature, can predict the respective current rolling resistance. 相似文献
6.
Patrick Riehm Hans-Joachim Unrau Frank Gauterin Stefan Torbrügge Burkhard Wies 《Vehicle System Dynamics: International Journal of Vehicle Mechanics and Mobility》2019,57(1):17-43
A 3D tyre brush model, which aims to predict the longitudinal tyre characteristic under steady-state conditions by modelling the occurring physical effects in the tyre–road contact patch, is presented. The model includes an analytical method to describe the tyre footprint geometry, the pressure distribution, the slip due to the lateral tyre contour, the slip due to braking or traction and the longitudinal as well as the lateral shear stresses on a flattened tyre. The presented development tool offers a method to investigate different rubber friction data (caused by different tread compounds and/or surface textures) and to analyse its influence on longitudinal tyre characteristics. The tyre design is fixed (same casing, dimension and pattern). The results include the shear stresses as well as the different sliding velocities in the contact patch for different slip conditions. The model was developed for a standard summer pattern design and a standard tyre dimension (205/55R16). It can also be adapted to other tread designs and tyre dimensions. To offer a good comparability between model results and test bench measurements, the surface curvature of an internal test rig is considered. 相似文献
7.
Studying the in-situ stress distribution at a tunnel site is very important to determine surrounding rock characteristics, the engineering design and the construction scheme. By using the multiple linear regression method based on the least square algorithm, the initial geostress field is analyzed and the corresponding regression coefficients are obtained. The ground stress obtained from the proposed back analysis is reasonable and can meet the demands of the engineering applications. From the rockburst risk level distribution diagram, it is speculated that the Wunvfeng tunnel is in the high filed stress area. Field monitoring should be strengthened and emergency plans should be made to cope with the rockburst risks during the construction process. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved. 相似文献
8.
文中从失效波纹管的化学成份、力学性能、显微组织、裂纹与断口及腐蚀产物等方面进行检测,并结合波纹管工作状况对波纹管进行应力计算及检测结果分析,探讨高温烟气膨胀节爆裂失效的原因及防护措施。 相似文献
9.
10.
姚宏安 《国防交通工程与技术》2012,(6):50-53
高地应力是一种常见的隧道地质灾害,在施工前准确掌握隧道穿越段的工程地质状况及地应力状态至关重要。针对后云台山隧道施工中洞室围岩发生"脆响"及掌子面后方初期支护喷射混凝土开裂等表象,通过地应力测试分析,判断隧道穿越地段围岩属中等应力水平,预测洞室开挖过程中有发生弱岩爆甚至中等岩爆的可能,采取加强监控、优化支护参数及施工工艺和打设应力释放孔等措施,取得显著效果。 相似文献