排序方式: 共有172条查询结果,搜索用时 15 毫秒
1.
2.
3.
净掘进速率是TBM施工速度的主要评价指标,与围岩物理力学性质、TBM掘进参数之间存在一定相关性。文章以兰州水源地建设工程输水隧洞双护盾TBM施工为背景,基于现场实测数据,选择岩石单轴抗压强度、抗拉强度、变形模量、泊松比、岩石耐磨性CAI值等岩体指标,以及刀盘推力和刀盘转速等掘进参数,进行TBM净掘进速率与有关影响参数之间的单因素相关性分析,得到相应拟合公式;基于TBM净掘进速率与岩体指标、掘进参数之间的相关性,利用多元非线性回归方法建立了TBM净掘进速率预测模型。通过将兰州水源地建设工程输水隧洞实测TBM净掘进速率和预测结果进行对比,验证了TBM净掘进速率预测模型的合理性。研究结果表明:(1)在复杂的多种地质条件下,TBM净掘进速率与岩石单轴抗压强度、抗拉强度、变形模量、岩石耐磨性CAI值、刀盘推力以及刀盘转速呈负相关关系,与泊松比呈正相关关系;(2)干湿状态对岩石耐磨性CAI值有一定影响,饱和状态下岩石耐磨性CAI值与TBM净掘进速率之间的相关性更显著;(3)建立的多元非线性回归预测模型,预测精度较高,可为相似地质条件下TBM净掘进速率估算提供参考。 相似文献
4.
Studying the in-situ stress distribution at a tunnel site is very important to determine surrounding rock characteristics, the engineering design and the construction scheme. By using the multiple linear regression method based on the least square algorithm, the initial geostress field is analyzed and the corresponding regression coefficients are obtained. The ground stress obtained from the proposed back analysis is reasonable and can meet the demands of the engineering applications. From the rockburst risk level distribution diagram, it is speculated that the Wunvfeng tunnel is in the high filed stress area. Field monitoring should be strengthened and emergency plans should be made to cope with the rockburst risks during the construction process. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved. 相似文献
5.
Water bursts during tunnel construction endanger construction, and it is therefore necessary to reserve a waterproof dike with the required thickness to avoid water bursts and to take reinforcement of the dike and treatment of the structure liable to trigger a water burst. Using the water burst at K5+398 of the Mingyueshan tunnel of the Shanghai-Chengdu expressway as an example, and considering the type of tunnel section and the upright mudstone of the dike, the waterproof dike at the work face is simplified as a round thin plate. A formula for the calculation of a minimum safety thickness for the critical waterproof dike is deduced by analyzing the force applied on the water-proof dike, and the minimum safety thickness for the water burst section at K5+398 of the Mingyueshan tunnel is cal-culated. The numerical simulation analysis demonstrates the critical thickness of waterproof dike at K5+398 of the Mingyueshan tunnel is 1.4-1.55 m, and the calculated water inflow and water burst basically agree with the actual condition. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved. 相似文献
6.
Combining the present situation and development trend of different tunnel support technologies at home and abroad, this paper analyzes the problems of rockburst in hard rock tunnels and large deformation in soft rock tunnels caused by high ground stress. It is concluded that: 1) regarding the rockburst problem, the current support technology is mainly influenced by the rock burst mechanism which is dominated by static factors, and so the used support components are generally of smaller deformation performance and "passive support" properties; 2) as the rockburst is the result of dynamic-static stress coupling, and only the anchor bolt has the "active support" attribute in the current "shotcrete+anchor bolt+wire net" support system, so the best support system should have the two functions of active support and energy release in terms of the rockburst problem, and the key focus of the research and development is anchorage members; 3) there are three main support types for large deformation in soft rock tunnels, e.g. the heavy support, layered support and yielding support. Among them, the heavy support system in underground cavern with large deformation is easy to induce excessive surrounding rock pressure, and so the applicable conditions are limited. The layered support system is still not the best choice due to its immature theoretical study, difficult determination of the thickness value and the installation time of each support layer and the interference to construction progress. With the characteristics of timely support and yielding while supporting, the yielding support system can give full play to the performance values of surrounding rocks and supporting materials, and make both of them reach the optimal state, so it is the best choice for supporting the soft rock tunnels with large deformations. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved. 相似文献
7.
从穿越瑞士列奇堡隧道的挤压变形性极强的碳质页岩带的经验中,可以得出下述结论:圆形含承压单元的支护截面,其收敛变形性总趋势要比马蹄形不含承压单元的支护截面小;圆形支护截面与马蹄形支护截面的变形性没有本质的区别;由于山体构造的不均一性,导致开挖断面的不规则变形,这是使承压单元过早脱落的原因。 相似文献
8.
9.
10.
矿山法海底隧道废水排水系统设计实践 总被引:1,自引:0,他引:1
以青岛胶州湾海底隧道工程为依托,对废水系统排水能力的确定、废水提升方案的选择及废水泵房优化设计等方面进行分析,探讨矿山法海底隧道废水排水系统的主要关键技术。主要结论如下: 1)废水排水能力确定的关键在于隧道的结构渗漏水的定量,常规的水下隧道的结构渗漏水量数据不一定适用于海底隧道,必须实际测量后确定; 2)废水提升方案关系到排水的经济性和安全性,核心在于选取安全可靠的水泵类型; 3)废水泵房优化主要从废水池有效容积、结构设计及设备检修等方面进行展开分析; 4)矿山法海底隧道废水排水系统的设计,必须从隧道实际情况出发,综合考虑各类影响因素,以达到安全、经济的设计目标。 相似文献