首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   5篇
  免费   0篇
综合运输   5篇
  2021年   1篇
  2013年   4篇
排序方式: 共有5条查询结果,搜索用时 15 毫秒
1
1.
ABSTRACT

Public transport in cities of the Global South is mainly provided by paratransit operators who self-regulate their services in the absence of adequate formal transport supply and due to weak or no formal regulatory framework and enforcement. Paratransit operators compete with each other for passengers as every passenger translates into profit. Governments in the Global South have sought to reform public transport services through Bus Rapid Transit (BRT) to regulate and ensure efficiency, address the problems of drivers competition and negative externalities associated with paratransit operations. Paratransit operators have been considered as one of the barriers to public transport reforms such as BRT without much consideration for their style of operations. This neglect has contributed to their resistance and low interest in participating in BRT and has even led to opposition. Consequently, non-consideration of incumbent operators in the implementation of transit reforms has been one important reason for delay or failure in their introduction. In this study, we identify reasons why paratransit operators resist and show low interest in BRT even in situations where public institutions have opted not to replace them but rather invite them to participate in the reforms. The basis is a case study analysis of four cities with different characteristics and different BRT implementation strategies where paratransit operators showed resistance and low interest to participate. We identify (1) loss of autonomy, flexibility and established practices/routines, (2) financial and economic risk avoidance and (3) lack of trust in governments who initiate reforms as a basis for their resistance and low interest. These findings are theoretically substantiated by organisational management and social psychology concepts that explain resistance to change. Understanding and recognising these reasons may help planners in designing more appropriate strategies for paratransit reforms.  相似文献   
2.
Abstract

In this paper we study the effects of using ruin and recreate methods in a replanning phase of a dynamic dial-a-ride problem. Several such methods are proposed, and a modeling system is used to evaluate how they improve the quality of the solutions. We show that simple changes to existing planning methods can increase the efficiency of the service. Two cases, with different forms of costs inflicted on the vehicles, are evaluated and significant improvements are found in both cases. The best results of our study are found with ruin methods based on removal of sequences of requests.  相似文献   
3.

This paper presents an artificial neural network (ANN) based method for estimating route travel times between individual locations in an urban traffic network. Fast and accurate estimation of route travel times is required by the vehicle routing and scheduling process involved in many fleet vehicle operation systems such as dial‐a‐ride paratransit, school bus, and private delivery services. The methodology developed in this paper assumes that route travel times are time‐dependent and stochastic and their means and standard deviations need to be estimated. Three feed‐forward neural networks are developed to model the travel time behaviour during different time periods of the day‐the AM peak, the PM peak, and the off‐peak. These models are subsequently trained and tested using data simulated on the road network for the City of Edmonton, Alberta. A comparison of the ANN model with a traditional distance‐based model and a shortest path algorithm is then presented. The practical implication of the ANN method is subsequently demonstrated within a dial‐a‐ride paratransit vehicle routing and scheduling problem. The computational results show that the ANN‐based route travel time estimation model is appropriate, with respect to accuracy and speed, for use in real applications.  相似文献   
4.
This paper describes a study of possible network changes for the Colombian railway system. A cost model is developed and the variation of costs with traffic density and with gradient is analysed and found to be different from that expected from experience in developed countries. The evaluation of network changes is carried out by a form of systems analysis in which two new lines and many closures are examined. Closures are evaluated by means of social cost benefit analysis incorporating a consumers’ surplus approach. The study recommends fairly radical changes to the present network configuration, these involving the construction of one new line and the closure of several existing ones.  相似文献   
5.
Using a data-set collected among paratransit users in Bandung, Indonesia, this paper explores the impacts of paratransit users' negative experiences and dissatisfactions with their paratransit usage pattern. Segmentation and ordered probit analyses are used to examine the impacts of users' opinions on service quality on their trip-making behaviour. The results indicate that users are divided into six segments – namely, the unlucky, the young user, the experienced, the adapter, the infrequent user and the captive. The results further indicate that paratransit users, especially women, perceive negative experiences related to on-time performance (departure and arrival time) and security issues related to vehicles. Despite these dissatisfactions and negative experiences, they are still likely to use paratransit as part of their daily life. Two paratransit market segments (the adapter and the captive) are also likely to result in more trips using paratransit. The study offers several strategies and recommendations that can improve the current paratransit system so that it can better serve local needs.  相似文献   
1
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号