苏通大桥主1号墩液压爬模施工技术
引用本文:刘毅,郑强,段振益.苏通大桥主1号墩液压爬模施工技术[J].中国港湾建设,2005(4):55-58.
作者姓名:刘毅  郑强  段振益
作者单位:中港第二航务工程局二公司,重庆,400042
摘    要:结合苏通大桥主1号墩的施工,介绍了液压爬模体系及施工工艺流程,并对使用中出现的一些问题,提出了改进的办法。

关 键 词:液压爬模  施工技术  改进
文章编号:1003-3688(2005)04-0055-04
收稿时间:2005-07-25
修稿时间:2005年7月25日

Technology of Hydraulic Climbing Formwork for Construction of Main Pier No.1 for Suzhou-Nantong Bridge
LIU Yi,ZHENG Qiang,DUAN Zhen-yi.Technology of Hydraulic Climbing Formwork for Construction of Main Pier No.1 for Suzhou-Nantong Bridge[J].China Harbour Engineering,2005(4):55-58.
Authors:LIU Yi  ZHENG Qiang  DUAN Zhen-yi
Abstract:In the light of the construction of the main pier No. 1 for the Suzhou-Nantong Bridge, the system of hydraulic climbing formwork and the technological construction process are expounded in the paper and some methods are proposed for handling any problems cropped up during the use of the climbing formwork system.
Keywords:hydraulic climbing formwork  construction technology  improvement