波纹地板与枕梁过渡结构研究 |
| |
引用本文: | 王万静,田红旗. 波纹地板与枕梁过渡结构研究[J]. 电力机车与城轨车辆, 2003, 26(1): 19-22 |
| |
作者姓名: | 王万静 田红旗 |
| |
作者单位: | 中南大学,高速列车研究中心,湖南,长沙,410075 |
| |
摘 要: | 介绍了现存几种枕梁与波纹地板过渡结构存在的问题,并分析其原因。通过对下翻式波纹地板的6种方案进行计算分析,提出解决问题的建议,并对上翻式波纹地板进行改进。
|
关 键 词: | 波纹地板 枕梁 过渡结构 |
文章编号: | 1672-1187(2003)01-0019-04 |
修稿时间: | 2002-11-21 |
Research on transition structure of body bolster with corrugated floor |
| |
Abstract: | Problems about the existing transition structur es between body bolster and corrugated floor are pre-sented and the cause of thes e problems are analyzed.Six transition structure schemes with turned-over-dow nwards corru gated floor are calculated and analyzed.Suggestions of solving the problems are made.Depending on the sugges-tions,transition structure with tu rned-over-upwards corrugated floor is improved. |
| |
Keywords: | corrugated floor body bolster transition structure |
本文献已被 维普 万方数据 等数据库收录! |
|