首页 | 本学科首页   官方微博 | 高级检索  
     

仓安路斜拉桥主梁施工控制技术
引用本文:刘志勇. 仓安路斜拉桥主梁施工控制技术[J]. 北方交通, 2007, 0(4): 101-103
作者姓名:刘志勇
作者单位:石家庄铁道学院土木工程分院,石家庄050043
摘    要:位于石家庄市仓安路斜拉桥,跨越京广铁路,主跨跨径125m,施工难度大且主要集中在主梁。着重介绍预应力混凝土双主梁施工的主要技术,包括牵索式挂篮悬浇、斜拉索安装与张拉、合拢段施工控制要点等。

关 键 词:预应力混凝土结构 斜拉桥 主梁 桥梁施工

Techniques for Construction of Main Beam of Cable Stayed Bridge on Cangan Road
Abstract:The cable stayed bridge situated on Cangan Road in Shijiazhuang City spans Jing-Guang Railway with the major span of 125m, its construction difficulty is big and principally concentrated in the main beam. The paper emphatically introduces major techniques for double main beam of prestressed concrete in construction, including the suspension cast of drafting cradle, the erection and stretch of stayed cable and the essentials for control of old section construction.
Keywords:Structure of prestressed concrete Cable stayed bridge Main beam Construction of bridge
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号