首页 | 本学科首页   官方微博 | 高级检索  
     

3600t化学品船主推进系统安装工艺
引用本文:李梓,赵旭,周剑平. 3600t化学品船主推进系统安装工艺[J]. 武汉造船, 2009, 0(4): 1-4
作者姓名:李梓  赵旭  周剑平
作者单位:中国船舶重工集团公司第七零四研究所,上海200031
摘    要:为了更合理地进行3600t化学品船主推进系统设备的安装,对轴系采用负荷法校中,使轴系各轴承负荷分配更趋合理。编制安装工艺,指导和控制各设备的安装步序以及安装质量要求,使船厂缩短了安装周期,并且通过了船东、船检的认可和验收。

关 键 词:安装步序  可调桨  负荷法校中

Installation Technology of the Main Propulsion System for 3600 DWT Chemical Tanker
LI Zi,ZHAO Xu,ZHOU Jian-ping. Installation Technology of the Main Propulsion System for 3600 DWT Chemical Tanker[J]. Wuhan Shipbuilding, 2009, 0(4): 1-4
Authors:LI Zi  ZHAO Xu  ZHOU Jian-ping
Affiliation:(No. 704 Research Institute of CSIC, Shanghai 200031, China)
Abstract:In order to install the main propulsion system of the 3600 t chemical tanker rationally, the jack-up method was used to make the load of each bearing more reasonablc. The installation technology was made to guide and control the installation process and quality. The technology proposed reduced the installation time for the shipyard and had been approved by ship owner and classification society.
Keywords:planning the installation  CPP  jack-up method of shaft alignment
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号