首页 | 本学科首页   官方微博 | 高级检索  
     

飞来峡二、三线船闸闸底长廊道输水系统模型试验
引用本文:张绪进,随娟娟. 飞来峡二、三线船闸闸底长廊道输水系统模型试验[J]. 水运工程, 2015, 0(7): 119-123
作者姓名:张绪进  随娟娟
作者单位:重庆交通大学,重庆 400074;重庆西南水运工程科学研究所,重庆 400016,重庆交通大学,重庆 400074
摘    要:飞来峡水利枢纽位于北江中游,新建的二、三线船闸并列布置有效尺度为220 m×34 m×4.5 m(长×宽×门槛水深),船闸最大设计水头14.44 m,采用闸底长廊道侧支孔输水系统双明沟消能布置形式。通过1∶30的物理模型,对船闸输水系统的布置形式及水力学特性进行试验研究。结果表明:闸室输水时间、水力学指标、闸室停泊条件、进出口布置形式均能满足规范要求,优化后的闸室停泊条件较好。

关 键 词:船闸;输水系统;输水时间;停泊条件;模型试验

Model experiment on lock-bottom long-culvert water conveyance system of Feilaixia second & third-lane locks
ZHANG Xu-jin and SUI Juan-juan. Model experiment on lock-bottom long-culvert water conveyance system of Feilaixia second & third-lane locks[J]. Port & Waterway Engineering, 2015, 0(7): 119-123
Authors:ZHANG Xu-jin and SUI Juan-juan
Affiliation:Chongqing Jiaotong University,Chongqing 400074,China;Southwestern Research Institute of Water Transport Engineering,Chongqing 400016,China and Chongqing Jiaotong University,Chongqing 400074,China
Abstract:The water conservancy project of Feilaixia located in the middle reaches of Beijiang river.The new second & third-lane locks are arranged parallely with the effective dimensions of 220 m×34 m×4.5 m (length×width×threshold depth),and the maximum design head is 14.44 m,using lock-bottom long-culvert & side-hole water conveyance system and layout pattern of energy dissipation with double open ditches.Carrying out an experimental study on the layout pattern of the conveyance system and hydraulic characteristics through the model test in 1:30 scale,we draw the conclusion that chamber delivery time,water hydraulic parameters,chamber berthing conditions,import and export of layout pattern can meet the specification requirements.It has been optimized to better conditions for the berthing chamber.
Keywords:lock  water conveyance system  delivery time  berthing condition  model experiment
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《水运工程》浏览原始摘要信息
点击此处可从《水运工程》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号