世博会园区预制综合管沟拼装施工技术
引用本文:彭鹏.世博会园区预制综合管沟拼装施工技术[J].城市道桥与防洪,2010(1):98-99.
作者姓名:彭鹏
作者单位:上海市第二市政工程有限公司,200065
摘    要:上海世博会园区设有综合管沟作为地下公用管线的汇集空间。其中西环路(K0+047~K0+498)长度451m的综合管沟标准段管节为工厂预制,现场拼装。该文着重介绍了现场拼装的施工工艺。此工艺具有效率高,风险小等显著优点,为类似工程施工提供参考。

关 键 词:世博会园区  预制拼装  综合管沟  施工  上海

Prefabricated Engineering Tunnel Assembly Construction Technology in Expo Park
Peng Peng.Prefabricated Engineering Tunnel Assembly Construction Technology in Expo Park[J].Urban Roads Bridges & Flood Control,2010(1):98-99.
Authors:Peng Peng
Abstract:The engineering tunnel constructed in Shanghai Expo is taken as the collecting space of the underground public pipelines, in which the typical section of pipe segments by the length 451m (K0+47~K0+498) of the engineering tunnel in Xihuan Road is fabricated in the factory and assembled in the field. The article focuses introduction on the construction technology of the assembly in the field. The technology has the obvious advantages of high efficiency and small risk to be referred for the construction of the similar projects.
Keywords:Expo Park  fabrication and assembly  engineering tunnel  construction  Shanghai  