首页 | 本学科首页   官方微博 | 高级检索  
     

块段支架置换挂篮施工连续梁技术
引用本文:薄春莲. 块段支架置换挂篮施工连续梁技术[J]. 铁道建筑技术, 2011, 0(6): 28-30
作者姓名:薄春莲
作者单位:中铁十九局集团有限公司,北京,100176
摘    要:结合广珠铁路江门水道特大桥(40+72+40)m连续梁施工实践,详细介绍了块段支架置换挂篮施工连续梁技术,并对其施工优势和施工注意事项进行了总结,对同类型施工有借鉴作用。

关 键 词:块段支架  连续箱梁  挂篮施工

Blocks Construction of Hanging Basket Bracket Replacement Continuous Beam Technology
Bo Chunlian. Blocks Construction of Hanging Basket Bracket Replacement Continuous Beam Technology[J]. Railway Construction Technology, 2011, 0(6): 28-30
Authors:Bo Chunlian
Affiliation:Bo Chunlian(China Railway 19th Bureau Group Co.Ltd.,Beijing 100176,China)
Abstract:With the practice of continuous beam construction of Jiangmen Waterways Bridge(40+72+40)m,Guangzhou-Zhuhai Railway,the paper details Block Construction of Hanging Basket Bracket Replacement Continuous Beam Technology,summarizing the advantages and matters needing attention of construction,and guide a reference for similar construction.
Keywords:block bracket  continuous box girder  hanging basket construction  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号